Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00001 - Greenbrier Apartments - RemodelCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on construe#ion, from time to filme the building official, span notification from the permit holder or his agent, sham make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall' notify the permit holder or his a�enf wherein the same �ai�s #o comply with this code. I . LAYOUT: Lot corners staked, staking in place for building, prior to excavation: 2• FOOTING: Commonkly made after poles or piers are set or trenches or basement 3. areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and an job site or tied in Qlare, FUUNDATION INSPECTION The foundation inspectian shall included excavations for thickened slabs intended dor the support of bearing walks, Partitions, structural supports, o� equipment and special requirements for wood foundations. SII forms and C; H V1 UHy �Wcl, Utc., snau oe in grace. 4. PLUMBING, MECHANICAL AND ELECTRICAL- Rough inspection: Commonly made prior to covering or concealment, 5. M 7. 0 DeTc3rE tixtureS are Set, and prior to framing inspection, TRUSS INSPECTION- 0 Inspections of trusses. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, drafts -topping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection perform d through State of Idaho Electrical Bureau) LATH ANU/UH WALLBOARD INSPECTION Commonly made after all lathing and/or wallboard interior isin place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection,. building1j's ready #o occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may maks or require any other inspections to ascertain compliance with this code and other laws enforced bv the building department. INSPECTION CARD The permit holder or his agent shall post the inspection record an the job site in an accessibly and conspicuous place to allow the budding afti�ial to make the required entries. The record shag be maintained by the permit holder until, the final inspection has been maple and approved. have read the move and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections o be made. Electrical: 624-3767 Building.- 359-3Q20 ex 326 or 313 Plumbing: 359-3020, ex 326"or 313 or 359-3034 Signature: Vi Date.1 :