Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00086 - Quizno's Subs - Tenant Finish+�.. {:,�. _�td3,���'o Sa; �.i:'.. M'�`�yYF.'e ""7. y. '•4'�?'�-#. °�^.. y 7k T " -V': rte` e " j � 4t r' $&i , CITE' CSF REXPEJ"URG Type BUfLD1NG INSPECTION SEQUENCE of Inspections: For on-site cQnstructEon, from time to time the building offIP icial upon notification from the permit holder or his agent, shall make or pause to be made ars p inspections and shah ether approve that portion of the construction as completed r shC��sary the permit holder or his agent wherein the same fails to comply with this code. all notify 1, LAYOUT: Lot earners staled, staking in place for building, priorto excavativ�: 2• FOOTING: Commonly made after poles or piers are set or trenches or basement meas are excavated. dorms and horizontal reinforcing tied in piaci, vertical reinforcing cut and an job site or tied in place, 3. FOUNDATION INSPECTION: The foundation inspec#ion shah included excavations for thickened slabs intended for the support of nearing walls, partitions, structural supports, or d. equipment and special requirements for wood foundation -s'. All farms and reinforcing steed, etc., shalt be in place, �, P�UNiB�NG, MEGHAN#GAL ASD ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing, inspection. 5. TRUSS. INSPECTION: Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, fire -stopping, draftstopping and bracing are in place and after the plumbinq, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electr"cal Bureau} 7. LASH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in piece, but - before any plaster i's: applied, or before wallboard joints and fasteners are typed and finished, µ 8. FINAL PLUMBING AND HEATING INSPECTION: -- All systems in place, fixtures yet, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms ars set, prior to placing concrete. 10. FINAL INSPECTION: 11. Commonly made after the building is completed and ready for occupancy. C]CCl1PAiUCY PERMIT: Issued when, on final inspection, building is reedy to occupy. 12.N-'"-,'tc-0THER INSPECTIONS: In addition to the called inspections above, the building depnce artmer�tmamake or require any other inspections #o ascertain campliwith this Code and other haws enforced by the building department _ INSPECTION CARO The permit holder or his agent shall post the inspection record on the job, site in an accessible and conspicuous place to allow the buildingofficial to make the required entries. The record shall be maintained by the permit holder until the final inspection has been made and appr ! have read the above and will comply in my requests dor inspections by giving 24 HOUR ���d NOTICE prier for inspections, to be made_ Elerctrical: 356-483Q - Building: 359-3020 ex 341 or 313 Plumbing: 359-3 0 ex 341 pr 313 pr 9-3034 Signature:` ce-00", Date: �Z