Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00084 - New Ride Auto - Temp Buildingi.,,�t •� �, e.,` -< ;4.z�•.r :�-r r � � � . ° e''is..-,r•' t''i.q. .. ��F'°.- h'!?.-. -� . a' � . �;�. a,,, . ti � ."�, .: �'� ti ... .. - k • .._ r i - a —+� 7�• .aC,. s #,rya - �,��-,y,� :,��;,,:. -,F, ' �. �•a _ _ _ _ _ _ % CITY OF REXBURG p 't - �� t �.� �� J:•`' I.� _ � � ' �'� �`•� � yrs,° °r, �� ,�, r' 3 •y BUILDING INSPECTION SEQUENCE Type of Inspections For on-site construction, from time to time the building official, upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shail notify the permit holder or his agent wherein the same fails to comply with thi*s code. I . LAYOUT. Lot corners staked, shaking in dace for building, prior to excavation: 2. FOOTING.- Commonly made after poles or piers are set or trenches or basemen# areas are excaUated. Forms and horizontal reinforcing died in place, vertical reinforcing cut and on jab site or tied in place. 3. FOUNDATION INSPECTION.if The foundation inspection shah included excavations for thic'keneld slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for woad foundations. All forms and reinforcing steel, eta., shatl be in place. 4. PLUMBING. MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or congealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION. Inspections of trusses. G. FRAME INSPECTION0 . commonly made after the roof, all framing, firestopping,, draftstopping and bracing ars in place and after the plumbing, mechanical and electrical rvu�h inspections are approve. {Electrical inspection performed through State of Idaho Electrical Bureau} 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior isin place, but before any piaster is applied, or before wallboard joints and fasteners are gaped and finished. 8. FINAL PLUMBING AND IDEATING INSPECTION: _ All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are sed, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building. is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final *inspection, building is ready to occupy, 1.2. OTHER INSPECTION& In addition to the called inspections above, the building department. may make or rewire any other inspections to ascertain compliance with this code and other haws enforced by the building department. INSPECTION ARD The permit balder or his agent shah post the inspectio . n record on the job site in an accessible and conspicuous place to allow the building official to make the required entries. The record shall be maintained by the permit holder until the final �nspection has been made and approved. have read the move and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical. 356-483a Plumbing: 359-3020 e Signature: 1 or 313 or 359-3034 Building: 359-3020 ex 341 or 313 Date: