CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type sof Inspections: For on-site construction, from time to time the building vfticial upon
notification from the hermit holder �r his agent, shad make or pause to be made an ne essar
inspections and shall either approve that �o�ti�r� f
o� the constru�etion as completed or shall notify
the permit holder or his agent wherein the same tails to comply with this code. �
� . LAYOUT: Lot corners staked, staking in pace for building, prior to exc�va#ion:
2. FOOTIN�: Gommon#y made a��er pokes ar piers are sed or trenches or basement -
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cit and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspect"on steall included excavations for thickened stabs
intended for the support of bearing walls, partitions, structural suppor#5, or
equipment and spatial requirements for ward foundations. All forms and
reinforcing steel, etc., shalt be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL-
Rough
inspection. Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5.. TRUSS INSPECTION:
Inspections of trusses.
s• FRAME INSPECTION:
commonly mads after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrics;
rough inspections are approved- (Electrical inspection performed through
State of Idaho Electrical Bureau)
7• LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard 'interior is in place, but
before any plaster is applied. or before wallboard points and f I'll, S -S are
taped and fin'i'shed.
8. FINAL PLUMBING AND HEATING INSPECTION:
9.
AIF systems in place, fixtures set, ready for occupancy
SlDEV11ALK �NSPEGTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12, OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other haws enforced by the building department.
The permit holder or his agent shahposttheECTION CARD
inspection record an the fob site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
steall be maintained by the permit harder until the final inspection has been made and a roved.l have read the above and will comply to my requests for inspections fa ppNOTlCE prior #Qr inspections to be made.Y giving 24 HOUR
Electrical: 356-4g30
Plumbing: 359-3020 ex 341
Signature:__,elP �1 �
or 313 or 359-3034
Building: 359-3020 ex 341 or 313
Date: