BUILDING INSPECTION SEQUENCE
Type of Inspections: For on -side constructian, from time �0 time the buildingoffs inotifiic�ation from tie permit folder ar his agent, steal! make or cause to be ade an upon
u%c%e%
inspections and shall either approve that portion of the canstr00,aa Y
�ctian as completed � shanec- - ll notify
the permit holder or Ns agent v�herein the same fails to comply with this'code,.
1. LAYOUT: Loi corners staked, staking in place for building, prior to excavation:
�• FOOTING: Commonly made after poles or biers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and an io#� site or tied to place,
3. FOUNDATION INSRECTION:
The foundation inspection shall included excavaiivns for thickened stabs
intended for the support of bearing waits, partitions, structural supports, or
equipment and special requirements for wood foundations. AIS forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING1 MECHANICAL AND ELECTRICAL:
laugh i n specti on .- Com m on I y made prior to coverinh0nrp fiyt"rn % Pg or, c�nceaIment,
5.
cmu prior to rraming ins
TRUSS INSPECTION:
Inspections of trusses.
FRAME INSPECTION:
pectin.
{7',,� , COmmonly made after the roof, Al gaming, f�restoppinY, draftstopprng and
bracing are in place and after the piumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. BATH AND/OR WALLBOARD INSPECTION:
Commoniy made after ail lathing and/or wallboard interior is in place,
before any plaster is applied, or before wolfKoard join#s and fasteners are
10.
11.
u!L
FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
SIDEWALK INSPECTIONS:
After forms are set_ nrin. t., .,ia��,,,,
FINAL INSPECTION: "� '�"' '�''y �vI I k'ICIC.
Commonly made alter the building iS completed and ready for occupancy 4POCCUPANCY PERMIT
Issued when, on final inspection, building is ready to occupy.
12_ OTHER INSPECTIONS:
In addition to the called inSpections above, the building d P may
make or, require any other inspections to ascertain compliance with this,
code and ether laws enforced by the building department.
The permit holder or his. agent shall
INSPECTION CARP
and conspicuous ,place tO al1a►� the building official inspection
t m make the on the job Side in an accessible
red e -
ries.
shatl be maintained by the permit holder until the final inspection as! beenThi acord
have read the above and will �ompiy in my requests for inspections by 24 HOURand a���o�v�do
NQTICE prior for inspections to Abe made.
Electrical: 356-483a
:359-302111111 ex 34� oPlumbingr 313 or s9-3034 Building= 359-3020 ex 341 or 313
Signature..