HomeMy WebLinkAboutINSPECTIONS - 03-00077 - Apple Tree Apartments - New 4-Plex�K
�-�
R
V Con
Pao 0-4
CM7 C6
ru
le. MEMO nCM
ri to > M
CL
67
CL
CA J-1 >. b
Lj
CD
COD
49
rD
r
,�..
i
■
Oil
:20h
�. ,
4
in
CO Rb
n 0
MEER
Eli
r -n 7.
pa m P -A
CD fl�
Cm
CL
�-'
R w
�. ■
,
CL
074
Y1 Pic
k
MP 'ON
If
73
i
t
7W L1 Li
CJ
r Li
Iwo
4 �.
t
t
m
AIX
rb
Ln
4C4
Cr)
i
1
V-4
a P.,
CrIdI
c
PWI
IF
� AMIN%
Q
70
a
r-•
Cal
�...
Co
m
C'
�
1
K
rw+
1
►s1
o
LN
t
m
AIX
rb
Ln
4C4
Cr)
rb
1
V-4
a P.,
CrIdI
c
PWI
IF
� AMIN%
Q
70
a
r-•
Cal
�...
Co
t
m
4
WU
rb
Ln
4C4
Cr)
rb
n
c
PWI
IF
� AMIN%
Q
70
a
r-•
Cal
�...
Co
m
C'
�
1
K
rw+
1
►s1
o
z
C
ro
fb
raj
ft
C.
3
Q
�
r�
5
CLr
i
4
WU
rb
Ln
4C4
Cr)
rb
n
c
PWI
� AMIN%
Q
70
a
r-•
�...
Co
m
C'
�
1
K
rw+
1
►s1
o
z
C
ro
fb
raj
3
Q
�
r�
4
WU
rb
Cr)
rb
n
4
WU
rb
Cr)
rb
PWI
3h y ,
r-•
�...
Co
m
1
ro
fb
raj
3
i
4
WU
rb
WON
1
Pr
N
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections.- For an --site construction, from time to time the building official, upoln
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shill notify
the permit holder or his agent wherein the same fails to comply with this code.
1 . LAYOUT: Loi corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or toed in place.
3. FOUNDATION INSPECTION.
The foundation inspection shall included excavations for thickenedslabs
intended for the support of fearing wails, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc,, shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealments
before fixtures are set, and prior to framing inspection.
5.4 TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION,
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing,, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho electrical -Bureau)
7. LATH AND/ORWALLBQARD If�SPEGT
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard points and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
Alisystems in place, fixtures set, ready for occupancy
9, SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly mads after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on fins! inspection, building is ready to occupy.
12. ETHER INSPECTIONS,IF
In addition to the calked inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit molder or has went shall pest the inspection record on the job site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
-F
shall be maintained by the permit holder until the final inspection his been mads and approved.
I have read the abase and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 35+5-4830 Building: 359-3D20 ex 341 or 313
Plumbing: 359-302D ex 341 or 313 or 359-3034
Signature: -
Date V.
��