Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00075 - Deseret Book - Tenant FinishCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type cif ns ns: For on-site eonstructian, from dime to tine the building of #ficial, upon notification from the permit holder or his agent, shatl make or cause to be made any necessary inspections and shall either approve that portion of the construction as completLed or shall notify the permit harder or his agent wherein the same fails to comply with this code. 1 . LAYOUT.- Lit cornus staked, Making 'in place for building, prior to excavation: 2. FOOTING: Commonly made after pales or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cud and on jab site or tied in place. 3. FOUNDATION INSPECTION. foundation iThenspection shad included excavations dor -thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. All farms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection_ commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: in addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced by the building department. INSPECTION BARD The permit holder or his agent shall post the inspection. record on the jab site in an accessible and conspicuous place to allow the building official to makes the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. have read the above and will Damply in my requests for inspections by giving 24 HOUR 0 NOTICE prior for inspections to be mads. Electrical: 356-483D Plumbing: 359-3020 ex 341 or X13 or 359-3034 Signatur NEI Building: 359-3020 ex 341 or 313 Date:tj'rt)3