CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For cin -site construction, from time to time the building offieial, upon
notification from the permit holder or his agent, shad make or cause to be made any necessary
inspections and Shall GNlther a0prove that porfion of the construction as completed or shall notify
the permit hold; or his agent wherein the same flails to comply with this cede.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after pales or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tiedin place.,
vertical reinforcing cut and on job site or tied in place.
'3. FOUNDATION INSPECTION:
The foundation inspection -shall included excavations for thickened slabs
intended for the support of bearing wars, partitions, structural supports, or
equipment and special requirements for wood foundations. All farms and
reinforcing steel, etc., shall bein place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prier to covering or concealment,
before fixtures are set, and prior to, framing inspecfion.
�. TRUSS INSPECTION:
Inspections of trusses,
fi.FRAME INSPECTION:
Commonlymade after the roof, all framing, firestopping, draftstopping and ��
bracingare inplace and after theplumbing,mechanical and electri l
ca
rough inspections ars approved. (Electrical inspection performed through
State of Idaho Electrical Bureau).
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place., fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS&
In addition to the called inspections above, the building department may
It
make or �equire any other inspections to ascertain compliance with this
code and other laws enforced by the building depar-tment.
INSPECTION CARD
The permit holder or his agent shah post the inspection record on the job site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shall be maintained by the permit holder antil the final inspection his been made and approved.
I have read the above and will comply in my requests forinspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 356-483D Building" 355-302D ex 341 or 313
Plumbing: 359-30Z�'1'11) ex 341 or 3� 3 ar 359-303�
Signature -9.
Date:— I / r%�'lLjfr(7
e7j
TJ-Beam(TM) 6,06 Serial Number" 70021 14535
User: 1 1 0/1 12003 1:56`45 P
Page 1 Engine Verson. 1.6.44
EASEMENT FLOOR BEAM
GEORGETOWNIRIVERWQQD 7
3 PCs of 'I 314" x 11 7/$" 1.9E Microllam@ LVL
THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
Film
s ,
Product Diagram ram i : r ceptUaL
LOADS:
Analysis -is for a. Header (Flush E Member. Tributary Load VVIdth_
Primary Load Group - Residential'- Living r (psf), 40.0 Live at 100 % duration, 1 . Dead
SUPPORTS:
Input Bearing Vertical Reactions (Ibs) [feta iI Other
Width Length Live/ dead/Upflf To i
I Stud wall 3.50" 3.50'" 2880 / 10021 / 3882Al'Blocking in 1 Ply 1 3/4" x 11 7/8" 1.9E Microl[arnO .LVL
Stud wall 3.50fl 3.50"` 288011002 3882 Al' Blocking 1 Ply 1 3/4" x 11 7/8" 1.9E 'I roll m LVL
-See TJ SPEClFIER'S 1 BUILDERS GUIDE for detail(): Al, Blocking
oEstGw CONTROLS:
Maximum Design
Control
Control
Location
Shear (lbs) 380 -3260
11845
Passed
(28°/0)
Rt. end Span I under Floor loading
Moment (F# -Lbs) 14857 14$87
26772
Passed
(56%)
MID Span I under
Hoar loading
Live Load Qefl (in) 0.372
0.392
Passed
(U505)
MID Span 1 under
Floor loading
Total Load Defi# {ire} 0.501
0.783
Passe!
(L1375)
MID Sian 1 under
Floor faading
-deflection Criteria- STAN DARD(LL:Lf480,TL:L1240).
-Sracing(Lu): All compression edges (top and
bottom) must
be braced at 2'
8" o/c unless detailed
otherwise. Prader attachment and positioning of
lateral braying is required to achieve member
stability.
ADDITIONAL TES:
-IMPORTANT! The analysis presented is output from software developed by Trus Joist LTJ). TJ warrants the i inof -its products by th's softwarew-111
be accomplished in accordance with TJ product design criteria and code accepted design vaiues. The specific product application, input design loads,
and stated dimensions h ave been provided by the oft r user. This output has not been reviewed by a TJ Associate.
-Not all products are read ply available. Check with your supplier or TJ technical representative for product availability.
-THIS ANALYSIS FOR T US JOIST PRODUCTS ONLY! PRODUCT SUBSTITUTION VOIDS THIS ANALYSIS,
-AfJowable StressDesign methodology was used for Building Code UBC analyzing the TJ Distribution product listed above-
-Note- See TJ SPE I FIEF ' / BUILDER'S GUIDES for multiple ply connection-
PROJECT
onn tion_
PROJECT INFORMATION:
Copyright 0K 2003 by Trus Joist, a Weyerhaeuser Business
Microllamg is a registered trademark Q f T.'c s joist.
OPERATOR INFORMATION:
RYAN t EI KLE
BMC WEST
202 WEST MAIN
REXBURG, IDAHO 83440
Phone.- 208- -9292
Fax - 008-356-3299
MEIKLE@BMCVVEST.COM
f4ZJ
e 7J
W
A Wwrh.aftigcr Buy-r€j 5
TJ -B a (T ) 6,06 Serial Num6er 70D2114535
User` 1 101112003 1:56.45 P
Page 2 Engine Version- 1.6.44
BASEMENT FLOOR BEAM
GEORGETOWNIRIVERWOOD
3 Pcs of 1 3/4" x 11 718" 1.9E Microllam@ LVL
THIS PRODUCT MEETS OR. EXCEEDS THE SET DESIGN
CONTROLS FOR THE APPLICATION AND LOADS LISTED
Load roup: Primary Load Group
Loading on all
Design Shear (Its)
Max Shear ( lbs
spans, L LSF =0. 90 Dead
1
981
Member. Re -action (Its
Support Reaction (1
Moment Ft -Lbs
PIPET INFORMATION:
981
1 002
Copyright U,2003 by Trus Joist, a Weyerhaeuser Business
Microll m. is a re i,5tered tradEne_az-k of Trus Joist.
Only
-841
-981
981
1-002
3842
OPERATOR INFORMATION:
RYAN MFIKLE
EMC ''LST
2021NEST MAIN
REXBURG, IDAHO 83440
Phone, 20$-356-9292
Fax :008-356-3299
MEIKLE@BMCWEST.COM
I T`x
Max. Vertical Rear ion Total
(Ibs) 3882
3882
Max. Vertical Reactiori Live
(ibs) 2880
2880
Required Bearing Length in
1.50(w)
1. ( )
Max. Untraced Length (in)
32
Loading n all spans, LDF
= 1.00 Diad T
Floor
Design Shear (lbs)
3260
-3260
MaxShear (lbs)
3801
-3801
Member Reaction (lbs)
3801
3801
Support Reaction (lbs)
38B2
3882
Moment (Ft -Lbs)
148
Live fle tion (in)
0.372
'dotal Deflection (in)
0.501
Loading on all
Design Shear (Its)
Max Shear ( lbs
spans, L LSF =0. 90 Dead
1
981
Member. Re -action (Its
Support Reaction (1
Moment Ft -Lbs
PIPET INFORMATION:
981
1 002
Copyright U,2003 by Trus Joist, a Weyerhaeuser Business
Microll m. is a re i,5tered tradEne_az-k of Trus Joist.
Only
-841
-981
981
1-002
3842
OPERATOR INFORMATION:
RYAN MFIKLE
EMC ''LST
2021NEST MAIN
REXBURG, IDAHO 83440
Phone, 20$-356-9292
Fax :008-356-3299
MEIKLE@BMCWEST.COM
k.
z
13
0
i
IL
' •1
a
y Y.
d
i
i
I
t
o
0
AL
t
8
k
w
n
lYI
'.r
AL
t
8
a
n
� r
t�
t PF
t '
9
Aj
•4�
4
1.
r
3
r
j
t
a