HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00062 - 333 Bare St - New Triplex Units 3, 4, & 5�-7'"10
�-,i', i �. ��f _ a9 - .�.,,i•.,�. - i{ .+�'� rv.' �'-.,�� w w � y # }y �. h. 4+� �•.. � � •e�'.. �. i. ,, ' J+r=� n .,-a.s . t*t--r - _.- T,�--�' ,a-� - �„
Ar
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building of1P f�cNal, upon
notification from the permit holder or his agent, shah make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this rode.
� . LAYOUT: Loi corners staked, staking in piaci for building, prior to excavation:
2. FOOTING: Commonly made after pokes ❑l- piers ars set or trenches or basement
areas are excavated. Farms and horizontal reinforcing tied to place,
vertical reinfar�ing cut and an job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shadl be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
41
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPE�TIQN:
Inspections of trusses.
fi. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after she plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTIONS
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners'are
taped and finished.
8. FINAL PLUMBING ANS HEATING INSPECTION:
ASI systems in place, fixtures sit, ready for occupancy
9. SIDEWALK INSPECTIONS:
After farms are sed, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building
11 OCCUPANCY PERMIT. is completed and ready for occupancy .
.
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPEGTIONS:
In addition to the called inspections above, the building department may
take or require any other inspections to ascertain compliance with th,s
code and other laws. enforced by the building department.
INSPECTION BARD
The permit holder or his agent shall posh the inspec#�€�n record on the job site in an accessible
and conspicuous place to allow the budding official to make the required entries. The record
shah be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by gilding 24 HOUR
NOTICE prior dor inspections to he made.
Electrical.- 356-4830
Plumbing: 359-3020 x,.. ---or ,or359-3a34
-jeV
Signaturel
Building: 359-3020 ex 341 or 313
Date:
� �F