Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00060 - Sunrise Village Apartments - RemodelCITY OF REX13URG BUILDING INSPr-CTIn�V SEQUENCE Type of inspections: For on-site construction, from time to time the building official, upon notification from the permit holder or his agent; shall make or cause fa be made any necessary inspections and shah either approve that portion of the construction as completed or shall notif the permit holder or his agent wherein the same fails to comply with this rode. 1. LAYOUT: Lot corners staked, staking ire place for building, prior to excavation: 2- FOOTING: Commonly made after poles or piers are set or trenches or basement areas are excavated. Foams and horizontal reinforcing tied in puce, vertical reinforcing cut and on fob site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened slabs intended for the support of bearing wads, partitions, structural supports, or equipment and special requirements for woad foundations. All forms and reinforcing steel, etc., shall be in place. 4. PLUMr BING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: inspections of trusses. 6. FLAME INSPECTION: Commonly made after the roof, all framing, firestopping., draftstopping and bracing are in place and after the plumbing, mechanical and eiectrical rough inspections are approved. (Electrical, inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any piaster is applied, or before wallboard joints and fS ars taped and finished. 80, FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures sit, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: 11. Commonly made after the buildingis completed and ready for accupan�y. . OCCUPANCY PERMIT: issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS. In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shah post the inspection record an the fob site in an acc�ssible and conspicuousplace to allow the building official to make the required entries. The record shall be maintained by the permit holder until the final ins I pection has been made and approved. wcompyin my requests for inspections by giving 24 HOUR NOTICE'prior for inspections to be made. Electrical: 356-4830 Plumbing. 359-3a20 ex 341 or 313 or 359- 303� Signature: Building: 359-3020 ex 341 or 313 Da e