HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00060 - Sunrise Village Apartments - RemodelCITY OF REX13URG
BUILDING INSPr-CTIn�V SEQUENCE
Type of inspections: For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent; shall make or cause fa be made any necessary
inspections and shah either approve that portion of the construction as completed or shall notif
the permit holder or his agent wherein the same fails to comply with this rode.
1. LAYOUT: Lot corners staked, staking ire place for building, prior to excavation:
2- FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Foams and horizontal reinforcing tied in puce,
vertical reinforcing cut and on fob site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing wads, partitions, structural supports, or
equipment and special requirements for woad foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMr BING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
inspections of trusses.
6. FLAME INSPECTION:
Commonly made after the roof, all framing, firestopping., draftstopping and
bracing are in place and after the plumbing, mechanical and eiectrical
rough inspections are approved. (Electrical, inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any piaster is applied, or before wallboard joints and fS ars
taped and finished.
80, FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures sit, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
11.
Commonly made after the buildingis completed and ready for accupan�y. .
OCCUPANCY PERMIT:
issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS.
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shah post the inspection record an the fob site in an acc�ssible
and conspicuousplace to allow the building official to make the required entries. The record
shall be maintained by the permit holder until the final ins
I pection has been made and approved.
wcompyin my requests for inspections by giving 24 HOUR
NOTICE'prior for inspections to be made.
Electrical: 356-4830
Plumbing. 359-3a20 ex 341 or 313 or 359- 303�
Signature:
Building: 359-3020 ex 341 or 313
Da e