HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00059 - Leonard's Insurance - New BuildingCITY OF REXBURG
BUILDING INSPECT -ION SEQUENCEType of Inspec#ions: For on-site construction, from time to time the building official, upon
na�ificatian from the permit holder or his agent, siall make or cause to be made any necessary
inspections and shall either approve that portion of the const�ucti�n as cc�mp��te� or shall notifi
the permit holder or his agent wherein the same fails to comply with this code. �
� . LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING; Commonly made after pales or piers are sed or trenches or basement
areas are excava#ed. Foams and horizontal reinforcing tied in place,
vertical reinforcing cut and on jab site or tied in place.
3. FOUNDATION INSPECTION. -6
4.
5.0
6.
Thi foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, par-titions, structural supports, or
equipment and special requirements for woad foundations. All forms artd
rein#arcing steed, etc., snail be in place.
PLUMBING3 MECHANICAL AND ELECTRICAL:
Rough inspection.- Commonly made prior to cowering or concealment,
before fixtures are set, and prior to framina inso�ectir�n_
`TRUSS lN��ECI JUN:
."� �;3 - Inspections of trusses.
FRAME INSPECTION:
Uomm4nly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
0
Commonly made after all lathing and/or wallboard interior is in place. but
before any plaster is applied, or before wallboard Joints and fasteners are
taped and finished,
FINAL PLUMBING AND HEATING INSPECTION.
Aid systems in place, fixtures set, ready for orcupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placin� concrete.
10- FINAL INSPECTION:
�
Commonly made after the building is campteted and ready for occupancy ,
OCCUPANCY PERMIT:
Issued when, an final inspection, building is ready to occupy.
12. OTHER INSPECTIONS: �
..,_Jn addition to the �alled inspections above,the buildinq de
artment m
nv
'-`•4 made or require any other inspections to ascertain compliance with this
.cede and other laws enforced by the building department.
The permit holder or his -agent shad
INSPECTION CARD
and conspicuous place to allow the building official to record , on the job site in a� accessible
shatl be maintained by the permit holder until the final inspection required sbeen nm de and tries. The ���a��
I have read the above and will comply in my requests for inspectionsby givin 24 HOUR roved°
NOTICE prior dor inspections to be made. �
Electrical: 35G-4830 Building.. 359.3,020 ex 34
Plumbing: 359-3020 ex 341 or 313 or 359-3034 1 or 313
Signature.
Lc!demonifDate