HomeMy WebLinkAboutDOCS - 03-00055 - Stonebrook - Residential Spaco
6
0
c
lmqft
0
1.
a
rA
Mari 18 t
20G3 9,'58AM
CITY OF REXBURG
BUILDING INSPECTION SEQUENCL
� - 1561
P, 2
Type of Inspections-- dor on-site construotionx from fime to fime the building official, upon
notification from the permit holder or his agent, shall maks or cause to be mado any nec�s��ry
InsDections and shy{1 eltMer approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
I . LAYOUT, Lot coniers staked, stakirig ari place fo.r building, p0or to oxCavation"
2.. FOOTING- G()mmonly made after poles or piers are set or trenchos or basernent
areAara excavated.,FForms and ho�IZOhtal�
reinforcing lied in plare,
VBCfiCaf re1nfarCingLI
�t and DIS job SL�te or died in plaoe,.
36. FOUNDATION INSPECTION:
The foundation inspection shall Included excavations for thicKened slabs
intendod for the support of bearing walls, partitions, Structural supports, or
equipment and special requirements far wood foundations,,. All corms and
reinforcing steel, etc., shall be in place.
4. PLUMBING.MECHANICAL AND ELECTRICAL
Rough Inspection -e Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection..
5. TRUSS INSPECTION:
Inspections of trusses,,
5, FRAME INSPECTION:
Commonly matle after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7 LATH AND/QR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interlw is in place, but
before any plaster is applied. or before wallboard joints and fasteners are
taped 'and finished'.
8-i FINAL_ PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, rowdy for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete..
10 FINAL INSPECTIONk
Commonly made after the building is completed and ready for occupancy .
i I OCCUPANCY PERMIT:
Issued when, on final Inspection, building is ready to occupy..
12„ OTHER fNSPECTIONS:
In addItion to, the called -inspections above, the building departm-ent may
male or require any other Inspections to ascertain compEEanco with this
code and other laws enforced by the building department..
INSPECTION CARD
The permIt holder or hJS agent sha1l post the inapection record onthe �o� si�� iCI ah accessible
end �vt��pic�o�s place to allc)w tie bu��ding Official to make the re uired cntrie& The record
shall bis mnlntained by the permit holder ontil the final inspeclion ha8 been mads and approved,
1 have,read the above and will comply in my requests fqr Intipections by IvIng 24 HOUH
NOTICE prior for InspecUons to be made.
Electrical- 624-3767
Plumbing; 359-3020 e
A
Signature'.,
0
nt
r 373 or 359-8034
so 3 d NvTiDwims
Building' X59-3020 0x X26 or 313
D ate:_���
0
cooz/06/co
F R
1 � F
`Id � �� i Vii! YfJJ� � ti ■ � � ■■ ■!, ,F
6t Lm,?Ast 4r
Belt L.4kiia;
4 _�' �.. .�
1� � 1 yy j � a ■yy � �•■■■ k �,1� 1 1
'.265-17753
� � . � � �iik�+Y �ii'k FY ��57 k� ,� .''4■�,�� ■iLL ��� 1,_ i
.2 5 _ �pk"moi
i
Y ■A
1� IL'i l
IF
• Yr Yl ii � Mr■i • � 9r
41:�� 4�G� �' k�•�he il�� tias�
FAX RANSMISSION
per
rix: OFMIN=*
TO 3v
> R
V
PACxho-
J,LL�.
covert� shot)
C I o lq E161. T I
.l 1•f y14. •Y X11
■� .Y iF' � +rte., � �-' ��y7
4 OF
u
NV31DWIMS
11
i
mm
�
y Y�2I�dr5.F17
,fJh+L'1r�,'�, i'' 1 e•i J
X1. ig
P 'e.,
cooz/oc./E0
I