Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00049 - American Family Entertainment Center - TheaterCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building official, upon notification from the permit holder or his went, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed car shall notify the aPrmit holder or his agent wherein the same fails to comply with this rode. 1, LAYOUT-. Lot corners staked, staking in place for budding, prior to excavation: 2. FOOTING: Commonly mace after pales or piers are set or trenches or basement arias ars excavated. Firms and horizontal reinforcing tied in place, vertical reinforcing cut ,and on job site or tied in place. 3. FOUNDATION INSPECTION-, The foundation inSDer_--,*tion shadl included excavations for thickened slabs intended. for the support of bearing wal#s, partitions, structural supports, or eauipmen# and sQeciai requirements for wand foundations. All forms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or congealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: Insoections of trusses 6. FRAME INSPECTIONE Commonly made after the roof, all framing, firestor)ping, draftstopping and bracing are in, place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/0,R WALLBOARD INSPECTION. f ;Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. H. FINAL PLUMBING AND HEATING INSPECTION- 0 -- --"-'All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: ----•- After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: in addition to the called inspections above, the building department may maks or require any other inspections to ascertain compliance with this code and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shall post the inSIDection record an the fob site in an accessible and conspicuous place to allow the building official to make the requ + red entries_ The record shall be maintained by the permit holder until the final inspection has been made and approved. have read the above and will comply in my requests dor inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 524-3767 Building: 359-3Q20 ex 326 or 313 Plumbing; 359-3020 enc X26 or 3-13 or 359-3034 Signature: ��- �/ �` Date: � � _ . �