SPECIAL INSPECTION
Project Name: Rexburg Deseret Industries
Inspection Date; january .1, 2004
Inspectori, JOel Martineau,
Type of work: Masonry Inspection
Forsgren inspected the masonry wall between B 1 and half way to F 1. The upper 4 feet of
walk had. not been grouted. On JanuaryI 5t a blizzard brought winds up to S mph to the
Rexburg area., and scaffolding and tenting that surrounded the wall was damaged. An
�mp�vyee of Mickelson says $1 Q, 000 of scaffolding was bent and ruined when it toppled.
Forsgren observed that much of the upper section of wall from eight to twelve feet height wzXl have fo be removed due to extensive �rack�ng of mortar 'Dints a�ad d
ofmany of the blocks which occuraredwh �n the scaf�'o�d�n� struck the „ri_rrrntiTtar��OcatI0I1
4f the wall. Lower gall, which was grouped
signs of damage, but blocks dislocated by tw
grout Pourneed to be repaired.
with exceptionally strong groui shaved no
o separate blowouts during the 12-31-03
Forsgren found that much of the work performed in the afternoon .of 12-31-03 was t
f damaged by high winds.
Technician.- Joel Mart-
ineau
Special Inspector: Jeff M. Snyder
�A;2.� r tom:-�•� �,.-.
A COMPANY OF ENGINEERS AND REXBURS, ID 834401 ''(208) 356.9201 / FAX (208) 356 0206
EXL F? ' BOISE WYOMING WE T EE LT LAKE CITY / SA CRA MENTO
www.forsgron.com
rJ
fRS�RE1V'
ASSOCIATES � INCU
A COMPANY OF ENGINEERS AND SCIENTISTS
Project Name: Rexburg Deser
11asPection Bate: 12-31 _M
SPECIAL INSpECTION
et Industries
a
Inspector: Joel mart-
ineau
Type of work: Masonry inspection aid Groin Pour
Forsorren inspected the placement of masonry block and reinforc�n
exte�.ox wall of Deseret Industries from 13.1 to about 10 feet no g steed in the wept
Of four to eight feed. north of F- 1, from a height
Forsgren witnessed the grouting of the masonry columns
slun�.p were tested. Bath rnartar cylinders andgroutprisms
and beaxn.s. Tempera,�ure a.rid
1ns�de the ��nting is about SD deg. F.The, were made. The temperature
c�ontinuo�xs heating. rnasvnry �va.�i under construction is under
For,grol found the mark inspected to be In compliance
specifications, except that two blacks thatwere cut for with the approved plans and
low-hft grouting. The blocks vill be repaired by theC�e doysruptured during the
vntzactor.
Technician: Joel Martineau
Special Inspeciar; Jeff M. Snyder
A GRr1PARV6?'J►�&C,
WWF{ fOrSgrOf7. CSM
q
F -R REN
ASSOCIATES/ INCw
COMPANY OF ENGINEERS AND SCIEAMSTS
SPECIAL INSPECTION
Project Name: Rexburg Deseret Industries
Inspection Date: 12-24-03
Inspector: Joel Martineau
Type of work: Masonry Ins 4b
pection and Grout Pour
Forsgren inspected the placement of masonry block and reinforelng steel at the
exterior wall o�'L�eseret Industries from A-1 to A-4 from a height f s��teen to twenty.nQ�two feet and. from A- 1running southward far �Y feed to the first
sixteen to twenty-two feet. y from a h ight of
Forsgren witnessed the grouting of the masonry Columns and beams. Tem �r
slump were tested �(61 deg. F. and 7-112 inches, respecivel , The contractor�afi re and.
gall0lis of water before further pumpmghookplace. The �) added ten
rune cubic yard batch was truck.
by Walters at its Rexburg plank under picket 10566. Mix #516 was used.
aI�- temperature was 23 deg. F. at the beginning of the pour, and above 3� deg.A.mbient
end ofthe pour. The entire noz�th walX from A►1-A-4 and fro�a A-1 towar F. by the
arzd heated within one hour of the grout pouar. This will continue until ds B- 1 was Tented
morning. tomorrow
F°rsgren found the work inspected to be in compliance with thea r0
oved f
specifications, except that high -lift procedure was, used ��six f ep of �va.an sand
at once rather khan the usua.e., l four}. � was grouped
Technician: Joel Martineau
Special Inspector: Jeff M. Snyder
;'' 'M burg DE700 Const\760 oMoly\763 M.a on �12-24-03 masc)
P F ENGINEER'S AND SCIENTISTSe cticr'45am.do.
PEXBURG / BOISE 350 NOR2n.d EA S TI REXBURGI ID 8344 } (208) 356,9201 FAX
(208) 356-0206
E CITY / SA CRA MENTO
www.or ren.com
R REM
ASSOCIATES /INCE
COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name.- Rexburg Deseret Industries
Inspection Date/Ti'me,,-' 12-23-.03 at 1300
Inspector: Joel Martmoeau
Type of work: Masonry InsPectivn and Grout P
our
Forsgren inspected the placement of masonry block and reinforcing steed at the north
extenar wall of Deseret Industries from A. I to A-4 from a height of twelve to eighteen
feet and from A-1 running southward towards $_ i to the first Boar, ftom a height of
twelve to sixteen feet.
Forsgren witnessed the grouting and vibrating of the masonry c.oluxnns and beams.
Temperature and slump were tested (G0 deg. F. and 9-1/2 inches, respectively). The six
CY batch was truck -mixed b� Walters a� its Vailey Concrete facility in Idaho Falls under
Invoice 0458Q. Aggregate of minus 318 inch screen and 7 -bag mix were used, aeon with
5 ounces per Cy of Polvheed. Ambient aar temperature was 29 deg. F. and ei htgallons
of v�a�er vvas added to t�h.e mix �� die site.�
No samples were taken.
Forsgren found the work inspected to be in compliance with the approvedplans andspecifications.
Technician: Jaen Martineau
Special Inspector: Jeff M. Snyder
COMPANY IES k
REXBURG, 0 83440 (208) 356.9201 FAX(208)356.020.6
EXB f113 1 WYOMING/ w ' , T EF LT CITY CRA MENTO
www. for r n. orn
FOR- REN
ASSOCIATES/ INC.
i
"'- A COMPANY OFENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name,* Rexburg Deseret Industries
Inspection Date: 12-23-03
Inspector: Joel .Martineau
Type of work: Masonry inspection and Grout Pour
Forsgren inspected the placement of masonry block and reinforcing steel at the north
0
exterior wall of Deseret Industries from A- 1 to A-4 francs a height of eight to twelve feet
and from A-�, �tn.� StH]t�'3war� fnr fh;�+---. ,.
twelve feet'.
�.
-�y 1�,GL Lu ,C lirst aaor, Irorn a height of eight to
Forsgren witnessed the grouting and vibrating of�he masonry columns and beams,
Temperature, and sump were tested ( 6I deg. F. and 14-314 inches, respectively).The si
CY batch was truck -mixed by Walters at its Valley Concrete facilityin Idaho
x
in�aoice X4544. Aggregate of minus 3f$ inch screen and 7 -ba �x Falls under
air temperature vas 15 deg. F. and den gallons of water was added to were used. Amb"le
�
the mix at the �.
Three grout prisms were east and placed i nan insulated area at the, site for retrieval in 48
hours.
Forsgren found the work inspected to be in compliance with the ap roved Tans and
specifications. (Special note: masonry walk from coordinates A-4 to E-4,groutedheight of the load-bearing plaies an December 1 S, �0�3 ai ].50Qis havinto the
roofing panels placedupon it today. As of 1 100, panels between E-4,E-3��e steel
'been paced. �'he curing time for the w�1 zsa roaches fvedays.,
to B -4,B-3 had
approaching ..which 2s Iess time
than Forsgren has recomme�.ded for steel placement}.
IL
" w4
Technician: Joel Martineau
Special Inspector. JeffM. Snyder
. ° eXbUz D1\700 ConsTMO OMplyN763 Mascry � 1 -2 3-03 rn as onry COMPANY F ENGINEERS DSCIENTISTS0 �r t �" T
EXB R ., ID 8344 / (208) 356.9201 Z FAX (208) 356,0206
REXBURG BOISE I / WENATCHELT LAKE CITSACRAMENTO
FORSGREN
ASSOCIATES / INCM
COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project dame: Rexburg Deseret Industries
Inspection Date: 12-22-03
Inspector: Joel Martineau
Type of work,-, Masonry Inspection and Grout Pour
Forsgren m"spected the placement of masonry black and reinforcing steel at the north
extenmor wall of Deseret Industries from A- 1 to A-4 from a height of four to eight feet and
from A- 1
feet.. ningung southward for thirty feet to the first door, from a height of four to eight
Fors9ren witnessed the grouting and 'vibrating of the walls. Tempera�uure and slump were
tested (57 deg. F. and 9- 1 f2 znches, respectively). The load, consistina of three and nne-
Y • w
quarCer eubic yards of grout, was mixed bY Walters at its ValkIrry, {Concrete facilityiln
Idaho Falls under invoice Q4485. Aggregate of minus 318 inch screen and 7 -bag mix
were used. Ambient air temperature, was 31 deg. F. and five gallons of water was added
to the mix at the site.
Forsgren found the work inspected to be in compliance with the approved plans and
specifications with one exception:
Thsecond doorway east of coordinate A-4 is reinforced -as a Masonry Column Z (MC-_:
2), but only MC- I reinforcement is specified, The extra rebars done per cell) were
probablyfoundati-onstarted with the stem wall in themasonry walls.
Technician: Joel Martineau
Special Inspector: Jeff M. Snyder
# OMPA F INEERSP*86�etEft�i,�"�oPOMMM'Th8PEASTIREXBUP(3, ID 83440 2'08) 356.9201 IFAX 208 .020
REXBURG/ B01SE1 WYOMING WENATCHEEI SALT LAKE CITY1 SACRAMENTO
www. forsgren,o
FOR REN
ASSOCIATINCE
ENGINEERS AND ITIS T
SPECIALD14SPECTION
Project Name: Rexburg Deseret Industry
Inspection Date: 12-19-03 �a 1 00
inspector: Joel Martineau
Type of work: Masonry
Can behalf of the owner, the following building components were inSDected b For-sgrenAssoc�.ates, enc.y
Masonry Wall was b 'It up from a height of 2D feet to 22 feet (fmal height)from D.....4A�4 �nnd the requzred s ctural elements vvere p�.aced in the maso �,, load �o
grout (3 cubic yards was batched at Walters concrete at about0950� a��. A of
0958 ung 1017 into the wa�.�. The ticket indicated the fo�I and pumped frown
The opera%r of the gout pump indicated khat some r� owing: Ticked 10528 , Mix 516.
temPeratum of the gout mix as delivered ft
om thetruck��er vvas added an site. Thi
was 55 deg. F.
The work was. inspected and found to be in compliance with thea raved dans an
Tecifications. PP p d
FORSGREN ASSOCIATES, INC.
Inspector: Joel S. Martineau
Special Inspector: Jeff M. S,
11
: ,Mkexburg M700 Const\760 Cara I \7"
COMPANY OF ENGINEERS f - RE=XE31JRG, ID 83440 1 3569201 J/ FAX (2081356,0206
REX BOISE WYOMING / THE ,SALT LAKE CITY MT
F -OR. REN
ASSOCLoq T.ES � INCO
- ACOMPANY OFENGINEERS AND SCIEN
WgCIALINSPECTION
ProjectNanie: RexburgD seret Industry
Inspection Date: 12-18
03
Inspector: JOel Martineau
Type of work: Masonry
On behalf of Fors gren Associn+es, Inc, the fallowing building components w
inspected. P we
MaSoLnry Wall from E-4 project
lng East towards E-3, from a height �f I6 ft. to(the finished height)and topped 19�-4"
by two metal plates fabricated. from angle iron and steed
dowels which protrude downward into the black ap�gs. The maso contractor difficulty installing the meta]. places. Some, crackin was observed alvn�ihe actor had
ITl/i'taI' loint after 'FSC n1atPc txn��-� ,.,y,,,..�.a _-- � - _ ._-- � upPcrmast
also wi�esse�ihe grouting of the, wall. The wall w�dn( pnor s�e ollting. The Forsgren Inspector
grout Pour, n��d and heated following the
Masonry Wall from D-4 to F-4, at the finished building heiLyht of 22 ft ass
previOUSIY-grouted wall that was 2� feet in height, was inspected and the
e�.hIed oraInpsectr�r, who also witnessed the grouting. The wa�I was a�ered ,
before. and after the gout was ouxed into the wall. It is worth not' nth concrete blanket
noting that the group. load
ME out prior to reaching the joint at the north end of the r�10
�„tir a+ n_e .,�, ��. � _ � .
volas vvilt need to be filled during the nexi grout pour. � V .� �� �-�, �u `�i� ���na2n��g
Masonry Wall from the, expansion j oint at C-.4, northward to the build*n
was inspected prior to grout'ng. The required structural corrxponents had b ever at A-4
before grout was poured. A 4 -ft, vibrator was used duringthe cont' 1'�aced xr�uous pour.
Forsgrein monitored one grout Load from falters Concrete, mix #5 16, tcorTect mix and temperature. Thegxout ternperaiure was 53 de . F. Te #IQ481 fog
Of the dented areas was ri,Pno„r�a .,�..� � _--- -, . � mpeiratures InsIde
- -- al�� lc�una to be at least 40- degrees duu�ing grouting
activities, Samples of 2rout and mortar were not taken as part of the ins ec�i
p on.
The work was inspected and found to be �n carz�.piiance u��ththeaprspecifications. p1wis and
FORSGREN ASSOCIATES, INC.
Inspector.- Joel S. Martineau
SPee'al ffispector: Jeff M. Snyder
A C�M�'���'I���°.�j��L�}ip}��'NVP4'_�Pf 2nd EAST/ FiFX6URG, 1!7 83440 / (208) 358.9201 / FAX (208) 356.0206
REXBURG / BOISE / WyplVlIFVG / WFNA7CF{E,E/SALT LAKE CITY/ SACRAMENTO
www.forsgren.com
FOR R IE N
ASSOCIATES /INC�
4
A COMPANY OF ENGINEERS AND SClENT/STSPEciAL IXspjEC TIO0
N
Project Name: Rexburg Deseret Ind try
Inspection Date: 12-18-.03 @1500
Inspector: Joel Marti,,�,,
Type of work: Masonry
The f0110wi-ng masonry work is vr%&
erilied by F
Masonry Wall ftom D-4 to F.,4, at thifa fps
the final two feet �3 ro�ays} of height farlengrthfedbuilding hexght of 22 ftwas rouped for
been�rora�ed earlier in the day(See reDO
of 12 masonry blacks. This--airea had
pQri for gTout at X93 0 this game davl.nod
MasorLry
way bw'lt up ftorn a height of 1 G feet to
bearing plates and oder structural elements �� feet From D-4 to A-4 and
grout was dispatched from Walters Conc�eie a� �, p�ace� �` the masa
wall specified above an about 1500 and ou� wall. A load °�
d vibrated. The wall from A-4 to abau� �ft4was Paced in the
tended, � south of C-4 was
The work was performed an compliance with the approved plans ani specifications.
FORSGREN ASSOCIATES, INCIP
Inspector: joel S. Marlmeau
Special 111SPector.- Jeff M. Snyder
10
{
A COMPANY OF ENGINEERS AND SC'ENTISTS-3,5�WV9?n)� EASTI F?EXBUPG:, ID 83440 / (208) 3,56-9201 / FAX (208) 356,0206
REXBURG IBOISE WYOMIIVG / WENATCHEEISALT LAKE /T
y/ SACRAMENTO
www.forsgren.com
FOR R N
ASSOCLAT / INCn
A COMPANY OF ENGINEERS AND SC1FNrlsrs
SPECIAL INSPECTION
_
Pr%ect Name: Rexbuxg Deseret Industry
Inspection Date: 12-17-03
Inspector: Joel Martineau
Type of work: Masonry
On behalf of Forsgren Associates, Inc. theIfallowng budding components wereinspected-,
Masons walk from. E-4 expansion j oint proj�c�ing eastward about V2the distance f(7 E. -I
1,,$
and �opp�n� ane doorway, was built up from a height of 12 ft, to 1 � fit. The Forsgren
Inspector also witnessed the grouting of the wall. Tie wall was tented and heated duan
and after the grout pour.
Masonry walk from L1-4 to F-4 was built up from 24 ft. to the finished build
inheight 22 ft, Thi walk way covered wi�th concrete �lan��e� after the mortar set. This se - �f
should be grouted t omorrow, tion
Masonry wall was built from eight to twelve feet in height and grfluted firom the
expansion joint at C-4., northward to the blding corner at A-4. The wall was inspected
ul
Prior to grouting, and the required structural components Were placed beforeout was
loured. A 4 -ft. vibrator was used during grouting. gr
Forsgren monitored one grout Toad ft1111,m �Ti�alters Concrete, nux #516, ticket 410452 correci mix, slump, and temperature. Three grout p�sms mere cast se for
repc�ri of this date}. Mortar was tested for temperature which wa � � �ou� prism
s s 5�3 deg, F. as batched.
The work was inspected and found to be in compliance with the approved plans and
specffl cations with the follow�ng exception:- � Expansion join# at C-4 is beingreinforced a I
Masonry Column- I even though the drawings (note # 19 of sheet) re uest MC -2 �
reinforcement. When it was discussed with Kelly, who represents Pete Mickelsoia
site, he said that an omission with
when the concrete sierra walk waspoured in at the'
�
area; no rebar was found by the masonry con�tractor as they bulli u �h,� � eX this
joint . Rehadintim"A ed -+o inform Tommy Burdette with J� p �ans�an
The masonry contractor did pit reinforcing steel from
1W
LLe expansion joint, as an NSC - 1.
.al10WeY' ',tlY[rrt."Kw...
FORSGREN ASSOCIATES, INC.
Inspector: Joel S. Mart-
ineau
Special Inspector: Jeff M. Snyd
i.cobsen of the p blem but forgot.0
that level upwards on either gide of
r
_,L� MPMM----.
2nd EAST/REXBURG. 1D $3440 I (208) ;3,56.,9201 f FAX(2D8) 356.(1206
RFXBURG /BOISE/ WYOMING I WENATCHEE / SALT LAKE CITY/ SAC�gqMENTC]
www. forsgren. cQm
F R S C REN
ASSOCLokTEs iNc,
A COMPANY OF E1VGlAfEFRS AND SCIENTISTS
SPECIAL INSPECTION
Project Name: Rexburg Deseret industry
Inspection Date: 12-16-03
Inspector; Jaen Martineau
T
ype of work: Concrete
On behalf ofFarsgren Associates, Inc. the following buildingcoinspected: mpanents were
The Forsgren Ins ....ec or witnessed the drill
Ing, cleaning with cora
appl1����°� �f �po�Y� a.��d the uzserii�n 0f all -thread bolts 3.nta e dr sed air, the
hales at columns G-2 and G-3. The bolt heads were tapped horliti�lled S -inch deep
ensure t�iat they were properly seated. This work was euired Y with a hammer to
correctly to support the steel columns. � �o JQCate the �,nl�-v
_ Forsgren monitored temperature at the location and found it to b .30, deg. F. The column
pads were covered with concrete blankets after the work was completed.
The work was inspected and found to be in compliance wi�ki
specifications. the approved pans azid
FORSGREN ASSOCIATES, INC.
Inspector: Joel S . Mariinea.0
Special Inspector. Jeff M. Si
A co �p,�'r56'�G��hs�,s�-�-i�aE���,��,�, ID 53440 / (208) 356.920 1 /FAX (2Los) 356. 0208
AEXBURG I BOISE / WYOMING/ WEIIIATCNEEI SALT LAKE CITY/ SACRAMENTO
www.forsgrign.com
R REN
ASS O-CIAT / iric,
A COMPANY OF ENGINEERS aNp SClFnrTIS TS
SPECIAL INSPECTION
Project Name. Rexburg Deseret Industry
Inspection Date: I �- � 6-
Inspector.- Joel
Martineau
Type of work: masonry
On behalf of Fors9ren Associates
, Inc. the
inspected:
following building components were
Masonry Wall from A-4 to C-4, four to eight feet abase finished buildingbetween doorways; alsoMasor�y �a�i from D-4 t� C-4, firom T2 � slab (areas
Masonry �a11 from E�4 to its terminus about V2the d'stance to E -3,°I6 fee- ; aisa,eight to twelve feet in. height. Re nfarcemen�ts were xns ecte from a height of
the pouring of grout into the walls was witnessed. A four -foot d �n reference to puns, aid
dor the ma�anry columns. portable vibrator was used
Forsgren monitored one ro t load amVzng at the job site at 1305 for ca
ternperafiure. Temperatuxe inside of the tended areas was measured �d found� �`�least �Q degrees.�o be at
The work was inspected and found to be in eomplianceWiththea r
0
specif cations. approved plans and
FORSGREN ASSOCIATES, INC,
Inspector: Joel S. Martineau
S'Pecial Inspector: teff' M. Si
A 66'JPX0k5?'g#dfl *L16A g") J *J; I § 6W19U!�R9�r 2nd Fasri RFxeuR0, ifl 83440 1 (2as) 356.920 r o FAx (zoa
REXBLlRG / BDISE! WYOMING./ V�IF,�,qTGyrEF /SALT LAKE Cl TYI SAGF�AMEIVTp '� 356-0206
www.forsgren.com
R EN
ASSOCLAT�s � INCm
A COMPANY OF ENGINEERS AND sClENTlSTs
P�d2�Cf Narn�. ri ,
SPECIALINSpr�CTION
J -exeurg DesPret Industries
inspection Date: 12-15-03
InsPector Joel Maxtineau
Type of word: Masonry jnsp,�,�,tjo, and Grout Pour
Forsgren 1nspected the ��acerx�e
� nt of masonry bl-
exterjojr�
�1 of T7A�A,.,.� z. _
Forsgren s
cure inside
.�..,0k--'1GL lnausbriesfrom. A_4 to c.�
k and rezrnfOrcing steel for the vie
R, at a he�g�t of four feet. est
ampl�d the mortar L .0
bezng used for thethe testedwall area. above wall section and
T+nrnrr....__ r _
PlacedS,amples to
round 1 th
specifzca e work inspected to be in cc�mp.t2�ons except for the high ��ft lance with -the apPro�ved p1��aridissue.
Technician: Jaen M
art,neau
Speca1 Inspector; ,Teff T4. S11df-ft� Y
4'
COMPANYF ENGINEERS
1Tn EA STIREXRUpG,
REXL30RG /BOISE/ WYOMING / WENATCHEE/ SALT LA KF
k
ID 83440 / 56.920 FAX (208) 356.. 0206
CITY PT
FOR R N
mh�� ASSOCLATES INCM
GEMEMOM�' A COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name: Rexburg Deseret Industries
inspection Date: 12-12-0-3
Inspector: Joel Martineau
Type of work: Masonry Inspection and Grout Pour
Forsgren inspected the placement of masonry block and reinforcing steel for the west
exterior wall of Deseret Industries from D-4 to F-4 expansion joint from a heihtgof
thirteen to twenty fejt.
Forsgren witnessed the grout ing and vibrating of the walls, and noted that it was Wa�
Concrete Truck W-87, dellove��.ng 5, 75 CY of grout, mix #516 ; picket number 103 54, �exs1415. Ambient a.�r temperature was 3I deg. F. Thi grout �temperatur� was 6 0 deg. at
F.
7`'a speed construction in cold weather, the masonry contractor installed more than
inch- high lift, an order to incorpnr�xte pialesfor structural steel. Reinforced mr�sonQ �Sblock wall vas �iurlt upfrom a height of 20 rows {about 13-I/3 t �
(3 rQws, from finished masonry height] or 20-213fthighfor �� �o a height of 31 ra��1sg�•r�uting, reinforcing bars were dropped i�tta e "� rise of 7 ft. Prror to
ells. Nave were visible above the top of
the blocks. Afte� grouting, additional reinforcing hors were inserted to match the
of the top bond heath block row @ 3�'rows height. Two plates were disloc height
the ilseTltion and were pushed bask into their positions. aced during
Tutting and heat was applied immediately after all insertions were made in the
?7T
.t (rexnfo�ced Plastid was drrxped from the east side �i�terior o the buitaing)- wall.fist level scaffolding and over the tai and capped rebars han z � over
feet on the other side. Thee propane, heaters were used during� �g d�w� at least eaght
ro.�e up to the top ofthe wall aid exited aver the ath�er side o the r��gh�: Heated air
inspector was at the pro e�8.-f he tenting. The Mason7y
�'' p �'..j�'om 04 Flt f to ensure that the testing was still in
place �r�d that heaters were warking. The setup was still functional, 40
artd the
temperature was 31 degrees. The following morning at 11 :30 ani the Masonry ��nhien� dxp
observed that` t�l�e tenting dad been pulled down end the heaters were nnw slrulnspec�or�
An2biOnt:r temp. was 3,�degrievs, and it was snowing. The temperature �
that time and snow was melting on the sidewalks. p ature was rising at
PrOject
IaYnlasonrY in weather
without tiontheArch
* q ,itect. (Insphoned 'tect ver�6, that
yewpermiss7on was" I-
'` �,,h _
K:1JR1A11LRexburg DI17 0 Con st\760 COMPV063 Masonry\12-1-03fnasen
A COMPANY OF ENGWEERS AND SCIENTISTS 350 NORTH2ndEASTIREXBURG, /D 834401"(208) 356-9201 IFAX(208) 356.0206
REXBURG IBOISEIWYOMING ,/ WENATCHEEISALTLAKE CITYI SACRAMENTO
w for, , r n. coin
R EN
ASSOCIATINCIE
COMPANYF ENGINEERS AND SCIENTlSTS
SPECIAL INSPECTION
Project Name; Rexburg Deseret Industry
Inspection Date: 12/12/03
Inspector: Joel Martineau
Type of work: Pressure Test of Water M
ain and Hydrant by Zollinger
Forsgren witnessed the pressure test of the wader main by Zollinger on the Deseret
Industries site.
At 091Z the Zine had already been pressured up b,y Bud Frew and Brett. Sorensen to 230
PSI, as dio'splayed on �h�eir pressure rne�er. The needle was not moving downward.,
At 1130, observed the pressure meter aftertwOho urs. Needle had not moped downward.
Forsgren observed the disconnecting of the meter and hoses and �Ih.at the needle drap�aed
to zero pressure. Apparently, the wader system has no measu�abie beaks in it.
Technician.:Joelll�artineau
Special Inspector: Jeff M. Snyder
,.
A COMPANY OF ENGINEERS AND SCIENTISTS 350 NORTH 2nd EAST REXBURG, ID 83440 ! (208) 356.9201 /FAX (208) 356. 0206
RCI
EX8RG /BOISE / WYOMING / WENA7'CHEE /SALT LAKE CITYI SACRAMENTO
www.forsgron.com
d
,F R REN
ASSOCIAT iNco
A COMPANY OF ENGlNEFRS AND SCIENTISTS
SPECIAL INSPECTION
Project Name: Rexburg Deseret Industries
inspection Date: 12- 11 3 @ 1515
Inspectvr; Joel Marineau
Type of work: Masonry Inspectian and Grout Pour
Forsgren inspected the placement of masonry block and reinforcing steel for the west
extPr;or wa.I of Deseret industries fromE-4
sixteen to twenty feet.
to F-4 expansion joint from a height of
Forsgren witnessed the grouting and vibrating of the walks, and noted that it was Truck
W-80, delivering 5.5 CY of grout, mix #516: ticket numb 10312, batched at I444.
Forsgren found the work inspected to be
specifications, plans in compliance with�h the ap�ro�ed and
Technician: Joel Martineau
special Inspector: Jeff M. Snyder
KWWRexburg DIV70o
O rlst' 760 cpm p ly\76 3 Mason r\ 12-1 l -0 mason"
A COMPANY OF ENGINEERS A ry inspectiong 15 15 _
ND SCIENUSTS 350 NOR TH 2nd EAS TI REX3VF?(3, ID 83440 / (208) 356.9201 / FAX (208),356.0206
EXB ' / BOISE / WYOMING r/ WENATCHEEI SALT LAKE CITY1
SACRAMENTO
www.forsgren.com
MMMENEEPP
FOR R N
ASSOCLATES / INC.
i
A COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name: Rexburg Deseret Industries
Inspection Date: 12-11-03 @ 1000
Inspector: Joel Martineau
Type of work: MasonryInspectimori and Grout Pour
Forsgren inspected the placement of masoxuy blo'kx..' a�.d reir�#'varcing steel for the west
exterior wall of Deseret Industries from H-� to �-� expa,.�sr+�n joint �� a height of sixteen
feet and E-4 to E-3 at a height of eight fejt.
Forsgren witnessed the graung andvzbrating of the wars, and noted that it was Truck
W-63, deliverin� � CY of grout of mix number 516. Ambient air temp. a� time. o#`
delivery was 29 deg, F.
Forsgren found the work inspected to be in compliance with the approved plans and
specifications,
Technician: Jori Martineau
Special Inspector: Jeff M. Snyder
' RNkARc .bur IWOri Consf,,760 COMPIyN763 MaSOMYM41-03mason , iris ti
A COMPANY OF ENGINEERS ANDSCIENTISTS 350
i Y Y ! r r r r' S 1 L� 1 + ' ./ ,J 3440 r f iJ S.r '356,9201 1 � X (208)356.0206
REXBURG IBOtSEIWYOMING I WENATCHEE I'SALT LAKE CITY/ SACRAMENTO
N
F RS REN
ASSOCIAT
COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name; Rexburg Deseret Industries
Inspection Date: 12-10-03
Inspector: Joel Martineau
Type of work: Masonry Inspection and grout Pour
Forsgren inspected the placement of masonry block and reinforcing steel for the tivesi
exterior wall of Deseret Industries from H....4 to just south of B-4 at a door -way for the
third lift,, 8 to 12 feed in height, and between doors, B-4 to A-4, the first four -foot lift.
Fors9ren witnessed the grouting and vibrating of the walls, and tested the grout for
temperature and slump. Forsgren took both mortar and grout samples for compressive
strength testing.
Forsgren found the work inspected to be in compliance with the approved plans and
pec
sificat�ons.
Technician: Joel Martineau
Special Inspector. Jeff M. Snyder
:'i Rexburg D 700Or 060 Cornp]yM3 Masonry\12-10-03 rn Rs onry insp ectlOn IOAM.doc
COMPANY OF ENGINEERS AND SCIENTISTS350 NORTH 2nd EASTI EASTREXB Rr ID 83440 .9201 FAX 0 .0206
BOISE WYOMING F T HEE /FACT LAKE CITY1 SACRAMENTO
www.forsgren.com
FOR REN
ASSOCLAT INCS
A COMPANY OF ENGINEERS AN,C,G SCIENTISTS
SPECIAL INSPECTION
Project Name.- Rexburg Deseret Industries
Inspection Date; 1.2-08-03
Inspector: Joel Martineau
Type of work: Masonry Inspection and Grout Pour
Forsgren inspected the placement of masonry black and reinforcingsteel forextezior Industrieswa11 of Deseret Indus�es from F-4 to C-4 from four to ei � the, West
masonry between doors,., C-4 to A-4 at a height of 4 feet. � feet Hugh and
Forsgren witnessed the, grouting and vibratinof the grouliemperaizre and
strength tee%ng.
sumlor
p. Forsg�en took both mom and grout samples for pm r ssi�e
In addition., six cancrefip-mav�n� ___ _
although three, were
u=•���� wcrc r�aae ror tes�uz�,
damaged and co�.Id nc�� be used.
Forsgren found the work inspected to be in compliance #,h the a rovespe��fieatIons�� d plans and
Technician: joel9Mar�neau
Special Inspector. Jeff LM. Snyder
e
r
P
4-
K -UR)AFM
exh ra fg D1�7 GG ConsC%760 Corn P I y�7 3 Masonry\ 12a08 - 3 rn
COMPANY OF ENGINEERS AND SCIENTISTS 350NC)PTPtlon
EASTI REXBURG, ID 6344 (208) 3,56 201 �{ FAX , 208 , `. 020,5
REXBURG IBOISE YOKING TEE SALT LAKE CITY1
, orsgren,nom
FOR REN
ASSOCIAT INCm
COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name.- Rexburg Deseret Industries
Ir.spection Date: 12105103
Inspector: Joel Martffieau
Type of work: Concrete Inspection and Samplm'g
Forsgren inspected the placement of reuLfoxczng feel for the Deseret 1ndustries sig -inch
concrete slab floor placed between grid coordinates C-2, C-4, D-.2. and D-4.
Forsgren obseryed the placement of 60 cubic yards of concrete at the above loca��on.
Forsgren monitored I load amvmg at the fob site for correct Max and proper sump.
Forsgren performed I au entramment test and performed 1 sump test., Forsgren cast 1 set
of 4 cylinders.
Fongren found the'work inspected to be in compliance with the approved plans and
specifiicatons.
Technician: Joel Martineau
Special Inspectors Jeff M. Snyder
A COMPANY OF ENGINEERS AND SCIEN TIS TS 350 NORTH 2nd EA STIREX13UPG, ID 83440 208 356.9201
REXBURG I 601SE1
www.forsgren'.corn
FAX 8 356-0206
EL��EE
FO REN
ASSOCIAT
ew�
P A C0MPA1VYnFJ=A1r-.1MPPJ00 Amn C%V%1CAM1L%-r0
SPECIAL INSPECTION
Project Name: Rexburg Deseret Indusries
Inspection Date: 12-04-43
Inspector: Joel Martineau
hype of word: Masonry Inspiecton and Grout Pour
Forsgren inspected the placement of rnasgnry black and reuiforc�ng �ee� fog the west'
exterior wail of Deseret Industries frim F-4 to C-4 at a height of four feet and part of the
Distribution Center frnnt Prt,-anep h�+�����r u_i .,,,a Y ,
�.�........�}�+r.5 vv� rx Vvril 1t -i Jam! Cl.L it Eil d.fN71IT AT
Also, the placemen
industries budding.
� of masonry wall and reinforcing steel from A-1 to B-1 of the Deseret
Forsgren witnessed the grouting and vibrating of the walls. The 7.5 CY load of grout
arrived at 11.20, Ticket 10022, Truck W-51, Mix.*'516.
Forsgre-n found the work inspected to be in co Hance with the approved plans and
specifications.
Technician: Joel Martineau
Special Inspector, -.b teff M. Snider
AND SCIENTISTS , 0 NORTH d E T EX E
_ f�4J f �, xID 83440 (208) 356.9201 1c:,X 0208) 356'.0206
URG BOISE WYOMING E T
forsgren-com
F -OR
ASS
OCILAA.TES / INCO
.a cOMPA ►ur of ENG rNEFPs ANfl scIFuTIS rs
SPECIAL INSPECTION
Project Name: Rexburg Deseret Industries
Inspection Date. -,o 12-04-03
Inspector: Joel Maft"neal
Type of work; Masonry Inspection and Grout Pour
Forsgren inVecte'd the placement of masonry block and reinforcing steel for the west
exterior ural of Deseret Industries from F-4 to doorway near C-4 at a height of four fejt
and part of the Distribution Center franc entrance, between H - I aid J- 1 at a height of
about 14,feet. A, the placement ref m�asoruy wall and reu�fax�i�g steed from A- � to B-1
of the Deseret Industries building.
Forsgren witnessed the grouting and vibrating of the walls. The 7.5 CY load of grout
arrived a�c 112 0, Ticket 10022, Truck W-5 1, Mix 5 16.
FOrsgren found the work inspected to be in eampfiance with the approved lans aid
specifications.
Technician: Joel Martineau
Speciat Inspector: Jeff M. Snyder
A COf"NY OF ENGINEERS AND SCIENTISTS 350 NORTH 2nd EASTI REX13URG, ID 83440 / (208) 356.9201
#XJDUPC. 1E WM' /{ T
CHEE / SALT LAKE CITYI SA6RA'
www.fo,rsgren.com
JX ) 3 E0206
FOR R FJ
ASSOCIAT INC=
A GOMPA NY DF ENGINEERS AND SCIENTIS TS
SPECIAL INSPECTION
Project Name: Rexburg Deseret industries
lWection Date; 12-03-03
Inspectar: Joel Martineau.
Type of work: Masonry Inspection Priorto Grout Pour
Forsgren inspected the placement ofmasonry block and reinforcing steel for exterior wall
an the svuth wall of the D 14-guribution Center from10buildng coordinates J-1 to J-4, built u
to a height of �v�nty-tvvo few. Farsgrer� also inspected the placement of masonry block�
and reinforcing steel from G-4 to a doorway south of C-4, at a height of fear feet.
Forsgiren witnessed the grouting. of
completed at about 1234. bath ()f the aforementioned. walls, which was
Forsgren found the work inspected to be in compliancewith the approved plans and
specifications.
Technician: Joel Martineau
Special Inspector: teff M. Snyder
A COM PANX QFi-4#jP1JVjr D SCIENTISTS 350 NORTH 2nd EASTI RE `RG S34401 08 356,
I�
TE SALT LAKE CITY1SACRAMENTO
WWW forrin. o
FAX (208) 356. o
FRS R N
ASSOCLAT INCm
A COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name: Rexburg Deseret Industries
Inspection Date: 12-02-03
Inspector: JoelMartineau
Type of work. Masonry Inspection Prier to Grout PouT
Forsgren inspected the p1wement of ma.sonry block and reinforcmg steel for
on the na�h wall of the, Distribution Center from bu�din coordina#es _ ��t�'r�.or wall
the west wall, H-4 to J-4, buUt up to a height of twentY-two feet.� � to H-4, and
c�.touts and steel bearing pates for �e layerplacement of The wall features 17
steed roofing.
F orsgren found the work inspected to be in cvmpliance with the �. rovespecYf�cat��n.�.PP � p�.ans �d
Technician: Joel Martineau
Special Inspector: Jeff M. Snyder
fie. y.g
ri
POMPA N F E1L=i=_'S A ND SCIEN-rIS TS 350
ID 83440 / (208) 3569201PPXBURG '90)SF / WYOMiNG / WENATCHEEI SAL L,1111111111iwjrr
1 T
www.forEgren.com
/FAX,106
F -OR REN'
-
ASSOCLOkTES / INCE
A COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name: Rexburg Des
cret Industries
Inspection Date: 12/02/03
Inspector: Joel Martineau
Type of work: Concrete Inspection and Sampling
Forsgren inspected the placement of reinforcing steed for asix-inch floor slab of the
Deseret Industries between coordinate corners A-4, A--2, C--4, and C-2, with rebar tied on
1T" censers.
Forsgren observed the placement of 120 cubic yards of concrete at the above location.
Forsgren monitored I load'
arrving at the job side for correct mix and proper slump.
Forsgren Performed J. air entrainment test and performed 1 sump test. Forsgren casks 1
set of 4 cylinders..
Forsgren found the work inspected to be
in comp�ia�.ce with the approved pians and
specifications.
Technician: Joel Martineau
Special Inspector: Jeff M. Snyder
0
COMPANYF ENGINEERS # D SCIENTISTS 350 NORTH 2ndEASTIREXBURG, I 834401(208) 356.9201 FAX (208) , . 0206
R XB / BFISE f WYOMING IN f WENATCHEE SALT LAKE CI
www. fors ren. o
4
F R REN
ASSOCIAT / INC=
A COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name: Rexburg Deseret Industries
Inspection Date:,12-01-03
Inspector: Joel Mart au
Type of work: Masonry Inspection/ Grow Four
Forsgren inspected the placement �a.sonry bock and. re�nfvrcing steel for exterior wail
an the west wa.0 of the dist��.bt���on area from building cvard�ates H-4 to J�4, bunt up to
a height of twenty feet and J-4 to J-- 1, built up to a he�g�t of sixteen. feet.
Forsgren observed the grout* and vibrating of masonry columns of the above-
mentioned walI. The grout was from Walters Concrete, Ticket X549, Mix. # 516�
delivered at 1125.
Forsaren found the work v�spec�ed to be ui cvmpiiance with the approved plans and
specifcati"vns.
Technician: Joel Martineau
Special Inspector: Jeff M. Snvd-;EN-.i
0
COMPANY F�
ENGINEERS3P � 1 AND SCIENTISTS350 N013TH 2nd EA STI.REXBURG
, I , (20B)356.9201 kf 1 Er
WYOMING./WENATCHEE1 SALT LAKE CITY d SACRAMENTO
www.forsgren.com
/FAX (208) 356.0206
i
F. R R N
ASSocLATES / INC.
A COMPANY DFENG INEFRSAND SCI,E'NTIS TS
SPECIAL INSPECTION
Project Name: Rexburg Deseret Industri,es
inspection Date: 11 -25-03
InsPector. Joel Maftineau
Type of work: Masonry Inspection/ grout Pour
Forsgren inspected the placement masonry block and reinforcing steel for exterior
on the east wall of the distribution area at H- I to J- 1, built up to a heiL:)rht of twelv�'���aver the topof an a en area su vrt�d by temporarye feet
posts -6
p PP �uvad framing and permanent steel
Fors.gren observed the grout -*ng and v�brati�g of masonry columns of the
mentioned wall. The group was frvrr� Walters Concrete, Truck #W above
delivered at 14�0. $ � Mix # 516,
Forsgren found the work ffispected to be incompliance with thea rovspec�fcat�vn�.approved pians and
Technician: Joel Martineau
Special Inspector.- Jeff M. Snyder
COMPANY OFENGINEERS AND SCIENTISTS 350 NORTH 2nd S
dT RL 1]I�(gr' � � yIf �q { f j,��j
SE WYOMING /
war. fdr sgro n. corn
FAX (208) 356-02-06
FOR GREN
ASSC)CLATEs /'iNc.
A C 0 MPA IV Y OF ENGINEERS AND S CIEN TIS TS
SPECIAL INSPECTION
Project # dame: Rexburg Deseret industries.
Inspection Date,* 1 1/25/03
IMpector: Joel Martineau
Tyke of work: Concrete Inspection and Sampling
Forsgren inspected the pla.,,ement of E j -
Of rebar set on 1 8" centers ba-�h
E 4 F I F-4 floorslab reinforcement, comistmg
1w rzx Blocks kept the rebar at le --,,+ inches
above the ba -se gra.as., 2
V VW1 ur&ce,
F`orsgren observed the placement and viobratmg of aT)Dr
concrete at the above Io�cat�onOXirnately 60 cubic yards of
En connection with the 9 am delivery of collcrete.
Farsgren mOnitored I
Forsgren performed I
of 4 cvli-nd
IV ers.
load
arriving at the jib site for correct mix and proper slunip.
air entrainment test and p'erformed I slump test. Fosgren cast I
set
Farsgren found the work inspected to be zr�specificatiolls. compliance with the approved plans and
w -P
Technic=* Joel Martineau
Special inspector: Jeff' M. Snyder
A COMPANY 0F ENGINEERS A 1VD SCIENTISTS 350 NORTH 2nd EASTI REXBURG
REXBURG / BOISF / WYOMING / WENA TCHEEI SA LT LAKE
fo rsgren. co m
0
ID 83440 / (20 (19)' 35 6.92 1
CITY I SACRA ' MENTO 0 /FAX (208) 356.0206
FOR REN
S O C .TES
rim/ INCO
A COMPANY OF ENGINEERS AND S CIEA(TISTS
SPECIAL INSPECTION
Project Name-, Rexburg Deseret Industries
Inspection Date: 1 1-2 1-03
Inspector: Joel Marineau
Type of work: Masonry Inspection/ Grout Pour
w
Forsgren inspected the placement masonry block and reinforcing steel for the exterior
wall from H-3 to H-1 on the north wall of the distributionwall of the Distr�l�uti�n
area and J- I to J-3, or the w�L.L
area, at a height of *,Drht to tWelVeL feet.
ell
Forsgrer� observed the grouting and vibrating to niasonry colunms of— the above-
mentioned wall. The grout was from Walters Concrete Mix 516,delivered IAA71
with an ambient airtemperature of 27 degrees
Farsgxen found the work inspected to be e
n COMPfiance with the approved plans and
specifications'. I
Technician: Joel Martineau
Special Inspector: JeffM. Snyder
A COMPANY OF ENGINEERS AND SCIENTISTs 350 NORTH 2nd EI RE ID 83440
92
SOYSJF'°3" l�WY-OM'IN(3,1�IWEAfATCMEEI SALT LAKE CITY/ SACRAMENTO
www.
for sgren, com
/ FAX (208) 356, 0206
000�
FOR REN
ASSOCIATES / JNc.
A CGMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTTON
Project Name: Rexburg Deseret Industries
Inspection Date: I 1- 1 9.03
41
Inspector.- Joel Martineau
Type of work: Masonry Inspection
Forsgrea inspected the placement masonry block and reinforcm
g steel for the exterior
wall from J-1 to, J-4 of the distribution area, to be grouted eight tv tweJve feet in height at
1217.
Forsgren observed the grouting and vibrating to mas
mentioned wall. U. -r onry eolunms of the above.
Fvrsgren found the work inspected #.o be in comp iance wit
specificatioTis., h the approved plans and
Technician: Joel Martineau
Special Inspector: Jeff M. Snyder
A COMPAN Y OF ENGINEERS AND SCIENTISTS 350 NORTH 2nd EAS T / REXBURG ID 33440,1 (208) 3,56-9201
REX13URG /BOISE/ WYOMING / WENA TCHEE / SALT L'AKF' CITY / SA CRA MENTO
Www- forsgren. com
�Z.Q7 0- '�
Y/ FAX (208) 356. 0206
FORS R N
ASSOCLAT /.INC.
A COMPANY OF ENGINEERS AND SC1Lc►UifS'TS
SPECIAL INSPECTION
project Name: Rexburg Deseret Jndustrj*es
Inspection Date: 11 - 18.03
Imp ector: Joel Martineau
Type of work: Masonry Inspection
Forsgren inspected the placement masvmry block and reuiforcing steel for the wall from.
H-3 to H-4 and H-4 to J-4 of the distribution area, 0-4 feet in height.
Forsgren observed the
mentioned wall, groutmog.and vibrating to masonry columns sof the above-
Forsgren found the work inspected to be in compiiance with the approved plans and
specifications.
Technician: Joel Martineau
Special fiaspecton Jeff M. Snyder
COMPANY OF ENGINEERS AND SCJENTISTS ,
50 NORTH 2nd EAST/ REXBURG,
wwwforsgren,com
f
r 1 -
CITY CRA MENTA .
F R REN
ASSOCIATES / INC.
COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL II•ISPECTION
Project Named- Rexburg Deseret Industries
Inspection Dade: 11 - 18-03
Inspector: Joel Martineau
Type of work: Concrete Inspecting and Sampling
Forsgren inspected the placement of reinforcing steel for the six-inch concrete floor slab
poured between corners C - I , E - I, E-4, aria C-4, reinforced with 44 reba�r �n twelve-inchcenters .
Forsgren observed the placement and laser grading of 50 cubic yards of concrete at the
above location. A concrete pumping truck was used for placement.
Forsgren monitored 1 load arriving at thejob site for correct min and proper slump,
P
Forsgren performed 1 air entra�nrnent test and performed I slump gest. Forsgren cans 1
set of 4 cylinders,
Forsgren found the work inspected to be in compliance wid,
th die approvedplansand
specifications.
Technician:- Joel Martineau
Special Inspector-, Jeff M. Snyder
A COMPANY F ENGINEERS AND SCIENTISTS 350 NOPTH 2nd ET RR 183440
REXB ? + I F 0 /WENA TCHEE LT LA KE CITY/ SA CPA MENTO
www.forsgren.corn
3 k
FOR_ R N
ASSOCIATES / INC.
COMPANY OF ENGINEERS AND SCIENTISTS
Project Name: Rexburg Des
Inspection Date.- 11/13/03
SPECIAL INSPECTION
eret Industry
Inspector: Joel Martineau
Type of work; Masonry Inspection and sampling
Forsgen inspected the concrete black masonry wail and reinforcement prior to the
placement of grout for wall 14-1- t I'll, H- 4, the first four -food lift.
Forsgren observed the placement and vibrating of about 2 cubi
above location, c yards of grout at the
Fors-gren monitored the one load arrivmg at th job site for correct mix, and properp,
slum
Forsgren performed. I slump test, checked the grout temperature,, and. east 1 sit of 3grout
prisms per the LTBC procedureFt�rsgren ansa filled three of sixCMUp��sms, ul�.Gh
were prepared on site about 24 hours earlier by the masonry �ontractvr, and represent the
required pre -construction samples. Also, three mortar samples were sampled, measured
for temperature,,, and cast, All. samples were cured at the site for 48 hours.
Forsgren found the work inspected to be in CoMpliance with the approved plans and
specifications., One item was discussed with the masonry con�rac�or- -the re'
Of the wall at H-4. as shown in G of She S.Q1 where the detail. shows u�fvrcemenr
It was noted that a change had been a�prr oved for theQ ev1 avvs 3 arebar rn. one e�i�.
my umn to use two rcbar at
the eorner,per ony Burdettand Kelly, the representative for the masonry contractor
Technician: Joel Martineau
Special Inspector: Jeff M. Sjr
0
COMPANY OF ENGINEERS AND SCIENTISTS 350 NORTH" 2nd EASTZ REXBURG, ID 83440 / """08 356.920
,10 6.0206
I T EE LT LA KE CITY'' SA CRAmENTO
FORS �G REN
ASSOCIAT INC�
km
A COMPANY OF ENGINEERS AND SCIENTISTS
SPECIAL INSPECTION
Project Name. Rexburg Deseret industry
Inspection Date: 11/12/03
Inspector: Joel Maft*neau
Type of work: Concrete Inspection and Sampling
Forsgreia inspected the rebar,�aed an 18 -inch centers prior to
concrete slab that is the, floor of the Distribution Center, 1 the p°uru�g of a four -inch
caordu�zates H- 1, H-4, J - I and J-4.Qcated between building plan
Forsgiren observed the placement of appr�axir�aafiely 60 cubic above lof concrete at the
Forsgren monitored one of the loads arrj.ving at thejob site forsump. correct mix, and proper
ForLsgren performed 1 air entrainment test and performed �of 4 cylinders.s�tiunp test. Forsgren cast 1 set
Forsgren found the work inspected to be iii compl�ance w%th thespecifications. approved plans and
Technician:. Joel Martineau
Special Inspector: Jeff M. Sn,
w
NORTH 2nd EAST/
�EXP / B0JSj= D + 0 d - 35 , 0 1 aT F4 J l
Jp f TCHEE SALT
LAKE CITY/ sA CRAMEN-ro (2 .)
www. fOrsgren. com
FOR REN
ASSOCLATES iNCO
A COMPA NY OF FIIIGINEFRS AND SCI,ElyTIS 7S
SPECIAL 11VSpECTION
Project Name: Rexburg Deseret Industry
Inspection— Date: 11110103
Inspector: Joel Martineau
Type of work: Concrete Inspection and Sampfing
Forsgren inspected the rebar, teed on 12" centers prior to the o
slab that zs the f��or o�Desere� Industries, located betwen buildingFunng of a 6- inch concrete
A-2, C- I and C-2. plan coordinates A- 1,
Forsgren observed the Placement of approximatel' �4 cubs
above location. �c yards of concrete at the
Forsgren monitored one of the Ioads arr2ving at the "ob site, sump. .l e for correct mix., and proper
Forsgren performed I au- entrainment test and performed I s
of 4 cylinders. 1 n.unp test. Farsgren cast I set
Forsgren found the work inspected to be in compliance
specifications. p wl�h the approved plans and
Technician: Joel Martineau
SPCCial Inspector: Jeff M. Sm
K.VRVA,Rcx-by1g M70(kig,67
A COMPANY OF Ei
ID ,r` 1) . 11 2 FA
T EE r/ SALT LAKE CITY/SA CRA MEN - . 0111 X(208)356-0206
www. forsgren, cow TO
T
0 R
ASSC)CLA,TES f INCE
A C OMPA NY DF ENGIAIEERSAND SCIENTISTS
SPECIAL INSPECTION
Project Name: Rexburg Deseret industry
Inspection Date: 11/11, 03
Inspector: Joel Martineau
Tyke of works Placement of Bolts and Pes at Frani Entrance to Distribution Area
Forsgren inspected the placement of two all -#bread bods at i 0�� and anoth
The dolts are located at the front en�ran�e to the distribution center(centereder, pair at 113�.
T and J 1) on -tag of the stem wall, which had been pouredpreviously.' between H..
had been missed as part of tl�e stem wall u�.st�.ilat�on. .Apparentl� the
out thoroughly with compressed air and e o was The four holes were blown
P X3' mixed and applied to the holes. The
4
ba Its were � i_nserted by twisting them and epoxy issued from each holeFina,lly, ugh nuts threaded onto tie fop afthe ba��s the bv� a� the bolt went in.
hammer to make sure they were bottomed out in the hoes. �s were taped down with a
placed at the same tune. �q'e plates were also
Forsgren found the word inspected to be �n compliance with. thea rovespecif�cations,.�P d pans and
Technician: Joel Martineau
Special Inspector: Jeff,M, snyi
A COMPA NY OF ENGINEERS AND SCiENTIS TS 350- NORTH 2n T e iEXB r�
REXBUF?G / BOISF/WYOMING / WENATCHEE1 SALT LAKE C17-YI SACRAMENTO -6206
�d 3 440 � JJ #.
t, form . o