Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00046 - Porters Store - RemodelR_ CITY OF REX13URG BUILDING INSPECTION SEQUENCE Type of Inspections: For ciconstruction, from time to tn-siteime the building official, upon notification from the permit holder or his agent, �h�11 mike or cause to be made any necessary inspections and shall either approve that portionof the construction as completed or shad notify the permit holder or his agent wherein the same fails to cam lwith this code,.Y 1. LAYOUT- Lot corners staked, staking in place for buiidinpriorexcavation- 2. FOOTING: Commonly mads ager pales or piers are set or trenches or basemennutareas are excavated, Forms and horizon#al reinforcing tied in pla, vertical reinforcing cut and an fob site or tied in place. 3• FOUNDATION INSPECTI+O►N: The foundation inspection, shad included excavations for thickened slabs intended for the support of bearing w s, Partitions, structural supports, or equipment and special requirements for wood foundations. All forms and rainfnr " + 1 41 4. v�� �y a t;C, tac;., 5ndri Qe in piace. PLUMBING, MECHANICAL AND ELECTRICAL Rough inspection: Commonly made prior to capering or concealment, before fixtures are set, and prior to framina insaection_ TRUSS INSPECTIUN: Inspections of trusses. S. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mecinanical and elecfrical rough inspections are approved. (Elec#riga! inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OAR WALLBOARD INSPECTION: Commonly made after ani lathing and/or wallboard interior is in place, but before any piaster is applied, or before wallboard joints and f asteners ars taped and finished. 8. FINAL PLUMBING AND HEAT NG INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTION'S: After forms are set, prior to placing concrete. 1a. FINAL INSPECTION.- Commonly made after the building is completed and ready for occupancy. 11- OCCUPANCY PERMIT: Issued when, on final inspection, building is ready tooccupy, 12- OTHER INSPECTIONS: In addition to the cabled inspections above, the build -Ing department may make or require any other inspec�ians to ascertain compliance with thi's code and other laws enforced by the building department. INSPECTION CARD The permit harder or his agent shall posh the inspection record on the jot) site in an accessible and conspicuous place to allow the building official to make the required entries. The record' shall be maintained by the permit holder until the final inspection has, been made and approved. I have read the above an.d will Comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical; 356-483p BuEing: 359-3D20 ex 341 or 313 Plumbing: 359-3020 ex 34131 "13ar 359-3D34 Signature:ate: P CITY OF REX13URG BUILDING INSPECTION SEQUENCE Type of Inspections: For ciconstruction, from time to tn-siteime the building official, upon notification from the permit holder or his agent, �h�11 mike or cause to be made any necessary inspections and shall either approve that portionof the construction as completed or shad notify the permit holder or his agent wherein the same fails to cam lwith this code,.Y 1. LAYOUT- Lot corners staked, staking in place for buiidinpriorexcavation- 2. FOOTING: Commonly mads ager pales or piers are set or trenches or basemennutareas are excavated, Forms and horizon#al reinforcing tied in pla, vertical reinforcing cut and an fob site or tied in place. 3• FOUNDATION INSPECTI+O►N: The foundation inspection, shad included excavations for thickened slabs intended for the support of bearing w s, Partitions, structural supports, or equipment and special requirements for wood foundations. All forms and rainfnr " + 1 41 4. v�� �y a t;C, tac;., 5ndri Qe in piace. PLUMBING, MECHANICAL AND ELECTRICAL Rough inspection: Commonly made prior to capering or concealment, before fixtures are set, and prior to framina insaection_ TRUSS INSPECTIUN: Inspections of trusses. S. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mecinanical and elecfrical rough inspections are approved. (Elec#riga! inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OAR WALLBOARD INSPECTION: Commonly made after ani lathing and/or wallboard interior is in place, but before any piaster is applied, or before wallboard joints and f asteners ars taped and finished. 8. FINAL PLUMBING AND HEAT NG INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTION'S: After forms are set, prior to placing concrete. 1a. FINAL INSPECTION.- Commonly made after the building is completed and ready for occupancy. 11- OCCUPANCY PERMIT: Issued when, on final inspection, building is ready tooccupy, 12- OTHER INSPECTIONS: In addition to the cabled inspections above, the build -Ing department may make or require any other inspec�ians to ascertain compliance with thi's code and other laws enforced by the building department. INSPECTION CARD The permit harder or his agent shall posh the inspection record on the jot) site in an accessible and conspicuous place to allow the building official to make the required entries. The record' shall be maintained by the permit holder until the final inspection has, been made and approved. I have read the above an.d will Comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical; 356-483p BuEing: 359-3D20 ex 341 or 313 Plumbing: 359-3020 ex 34131 "13ar 359-3D34 Signature:ate: P