Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00042 - 424 Pioneer Rd - New CommercialCITY 0F'HE`EX13URG BUILDING INSPECTiON SEQUENCE • � t Tyke of Inspections: For on-site construction, from time to time the building official, upon ratification from the permit holder or his agent, shat! make or cause to be made any necessary in,spections and shah either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein theS r.aa�CT. me fails to comply with this rode. 1. LAYOUT: Lotcorners staked, sefor building W p rior to-.'�xcavafion: 2. FaC�TING; Commonly made after poles ar piers are sit or trencqes r basement areas are excavated. Forms and horizontal rein#orci g tied 'n place, vertical reinforcing cut and on ;o`��it��r_#led i� plaee� 3. FOUNDATION INSPECTION: -! The foundation)ns-pection`' shall included excavations for thickened nabs intended dor the' ��u�pt f bea(ing walls, partitions, structural* supports, or equipment and soeci�,f --� � _ nt�s a��nroo foundations. ASI forms and �..- reinforcinrr st€� , etc. � �b place. - ,��� 4. PLUMBING, MECHANICA -AN Et-,ECTF�J:QAL: RoughinsDer��r�- Smmbn1f �a�e prior to covering or �con,�eaiment, before fixtures are set, an'd,p'rior to framing inspection. 5, TRUSS INSPECTION:F4 Inspections of trusses. i 6. FRAME INSPFCrTION: •`,° �. Commonly mare after the roof, all framing, firestooping, raftsto in and PP 9 bracing are in place and after the olurnbing, mechanical and electrical _ rough inspections are approved. (1:1ectrical Enspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commbnly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and. fasteners are taped and finished. � 8. FINAL P�UMBING AND HEATING INSPECTION: AIS systems in place, fixtures sed, ready for occupancy 9. SIDEWALK INSPEQTIONS: After dorms are set, .prior to placing concrete. 10. FINAL INSPECTION: Commonly made after*. buildinq is completed and read far occupancy Y P Y 11. OCCUPANCY PERMIT: Issued when, on lino! inspection, 12. OTHER INSPECTIONS: building is read to - QCcu Py. In addition to the galled in. eclions a ve fh rdin'gbuy department m,a,y ks or re uire.any�� i �ser laws en�c�reed p -�e,,�he building department,,ections to ascertain com�liancompliance. with thi'� c �� d_an�c�- � 0- - *tINSPECn, -AIAD� The permit balder or his agent shelf post the, inspection record on the lob site in an accessible and conspicuous place to allow the building official to make the required entries. The retard shah be maintained by the permit holder unfii the final insr)ection has been made and approved_ have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be mads. Electrical: 624-3767 Building.- X59 -302D ex 326 or 313 Plumbing: 359-3020 ex 326 or 313 or 359-3034 7 Signature Dater M