CITY OF REx%drBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the per -mit holder or his agent wherein the same fails to comply with this code.
1 . LAYOUT: Lot corers staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or drenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
1h
intended for the support of fearing wall$, partitions, structural supports, or
equipment and specialt requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL ANLL ELECTRICAL.
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
Stade of Idaho Electrical Bureau)
7, BATH AND/OR WALLBOARD INSPECTION:
Commonly made after all bathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
typed and finished.
8. FINAL PLUMBING AND HEATING INSPECTION.
All systems in place, fixtures set, ready dor occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prier to placing concrete.
10.. FINAL INSPECTION:
Commonly made after the building is complete and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the cabled inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other haws enforced by the building department.,
INSPECTION CARD
The hermit holder or his agent shad dost the inspection record on the fob site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shall be maintained by the permit holder until the final inspection his been made and approved.
have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: �56-4830 Building: 359-3020 ex 341 or 313
Plumbing: 9-3020 enc 341 or 313 or 359-3034
Signature: Date:��