BUILDING INSPECTION SEQUENCE
Type of Insoections., dor on-site construction, from dime to time the building official, upon
I�otlfilCatiQtl frnm fhp nPrmit hnlripr nr hie ��,�n+ --- - -
���, .i, �R rra�E r � rdn� car �d�5� F� oe mace any necessary
inspections and sham either approve that portion of the construction as completed or shall notify
tha _
s.-•.� � �v�uc� v� � ,� �.yC[ IL �, lere,r] the same raFis to campy with this rode.
1. LAYOUT: Lai corners staked, si�krng in place for building, prior to excavation:
2. FOOTING: Commonly made after doles or piers are sit or trenches or basement
meas are excavated. Farms and horizontal reinforcing tied in place,
vertical reinforcing cut and on jai site or died in place.
3. FOUNDATION INSPECTION:
The foundation insnection shall included excavations for thickened slabs
intended for the support of bearing wails, partitions, structural supports, or
equipment and sDecial requirements for wood foundations. All forms and
r&nfarcinQ steed, etc., aha!l be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5.r TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved, (Electrical inspection performed through
Stateof Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied„ or before wallboard joints and fasteners are
taped and finished.
S. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After dorms are sit, prior to placing concrete.
1Q. FINAL INSPECTION: '. r
Commonly made after the building is completed and ready for occupancy.
11, OPERMIT:
Issued when, on final insoection, building is ready to occupy.
12. CINSPECTIONS-
In addition to the called inspections above, the building department.may
maks or require any other inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post the inSDection record on the job site in an accessible
and cansgicuous place to allow the bLAding official to make the required entries. The record
sail be maintained by the hermit holder until the final inspection has been made and approved.
1 have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.