HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00038 - 425 W 5th S - RemodelBUILDING INSPECTION SEQUENCE
Type of inspections: For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that �nrfion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this jade.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after pates or biers are sed or trenches or basement
areas are excavated. Foams and horizontal reinforcing tied in place,
vertical reinforcing ctIt and on jab site or tied in place.
3. FOUNDATION INSPECTION:
The foundation 'inspectd,
ion shalt included excavations for thickened slabs
�n#ended �or the support of fearing walks, partitions, structural supports, or
equipment and soecial requirements for wood foundations. AIS farms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: commonly made prior to covering or concealment,
before fixtures are sit, and actor to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the rood, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and efectrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPE'CTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners ars
taped and finished.
II. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS: "�`�` '777)
After forms are "set, —prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the galled inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other taws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shatl post the inspection record an the jab site in an accessible
and conspicuous place to allow the bul Iding of#icial to make #he required entries. The recard
holdrshall be maintained by the permitholdr until the final inspection has been made and approved_
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspection-s—to-,be rade.
Electrical: 624- 7 Building: 359-3020 ex 326 0r 313
Plumbing: 325 D�p3A 3 or 359-3Q34 � 1
Sig oat e:d
i i Date.