Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00036 - 382 Oaktrail Dr. - Kartchner HomesCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections -L For on-site construction, from time to time the bu'llding official upon 3,. notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shah either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1 . LAYOUT: Lot corners staked, staking in place for building, prior to excavation: 2. FOOTING: Commonly made after �Qles or piers are set or trenches or basement ar�as are excavated. Farms and horizontal reinforcing tied in place, vertical reinforcing cut and on fob site or tied in place. ,FOUNDATION INSPECTION, 's The foundation inspection shall included exc vations for thickened subs intended for t hef supDo_rt of bearing walls, partitions, structural supports, or equipment and special reauirements for wood foundations. AIS forms and �. � ' �`,► �: reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL-, Rough insoection: Commonly made prior to covering or concealment, beforgEa. fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: Inspections of trusses. 6. FRAME INSPECTION: Commonly mads after the roof, all framing, firestopping, draftstonping and ----�-� bracing ire in place and after the DIUmbing, mechanical and electrical rough inspections ars approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: on H 10. commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard faints and fasteners are taped and finished_ FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may maks or require any other inspections to ascertain compliance with this rode and other laws enforced by the building department. INSPECTION CARD The permit hoiden or his agent shall posh the inspection record on the.. job site in an accessible and conspicuous place to allow the bV ing official to make the required entries. The record shall be maintained by the permit holder until the final inspection his been made and approved. I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 524-3757 Buildina: 359-302Q sex 32G or 313 Plumbing: 359-3020 ex 326 or 313 or 359-3034 tv ��) ig nature: ~� Date: i