Loading...
HomeMy WebLinkAboutRECEIPT & DOCS - 03-00034 - BYUI - Storage BuildingBuilding Permit Valuation Fees City of Rexburg (208)359-3020 12 North Center Street Rexburg, Idaho 83440 Value of Construction: Finished Sq Footage Unfinished Sq Footage Garage Square Footage Construction Value Factor Rate Chart: Mechanical Valuation Owner: B ho ...... 'Construk i T . Building Name: r Residential Address: 525 S Center........::. Basement t Cate:6/18/2003Apartments Build'ing Permit Number Per Fees 20'000 30.00 $45030 Const, Type 0.00 A Residential or 1 0.00 200 000 Sq Ft Cost -- $0.0Apartments 99,999, 999 3230.00 0.5% Ft Cost$0 .00 Commercial 0 0 So Ft Cost $0.001 F' rl i n Begin 0 501 t01 253001 509001 100}001 500,001 1,000,001 = sol Plumbing Permit Rate Chart: Residential Non Commercial Number of Fixtures 01 Sprinkler Feer $18,00 Rate Per Fixture $8.00 Base Fee $30.00 Rate ha :nr merci l Cost of Florin: Rate Chart: Water & Sewer Permit Begin 0 20,001 100,1001 2001001 Total Square Fat Cost $0.0 End Case Plus Per 500 23.50 0-00 100 TO 23.50 3.05 100 251000 69.25 14.00 1000 50j000 391.75 10.10 1,000 1001000 643.75 7M 1 000 500)000 993.75 5.60 1 000 110001000 3233.7,E 4.75 1 000 9919993999 5608.75 3.65 1 000 Number Total Building Permit Fee: Plan heck Fee: Fixture Fee.- 01 Sprinkler Fee: Base Fee - Total Plumbing Kermit Fee: Garage 70mrnercia- I 70�0 0 $0,00 $0.00 Fees 0.00 0.00 9766 0.00 0-0 0.00 0.00 0.00 $97.6$ $9.17 End Bae Plus Per Fees 20'000 30.00 3.0% 1 0.00 100,000 630.00 2.0% 1 0.00 200 000 2230.00 1.0% 1 0,00 99,999, 999 3230.00 0.5% 1 0.00 Water Line Size Inches Meter Parts** i 0. $125.00 $182.00 *Total Meter r Farts 1,00 $195.00 $182.00 Deter Box $70.00 Fling & Lid $32.00 2. 00 si;327,79$49.62 CUTIS Stop $27,00 3.00 $1..868..00 Setter $53.00 4.00 $21618.50 Hookup Fees Water Rate Digging Permit fees Minlm.um & All Homes $11100.00 Minimum & All Horner Apts (# of Students) $270.00 Apt {# of Students) Apts (Family Housing) $425.00 Apts (Family Housing) Water Front Footage $10.00 Sewer Front Footage Total Water &Sewer permit Fees Total Plumbing Permit Fee: Number of Bldgs Total Water Deter and Parts: Sewer Rate Students $575.00 $437.50 0 $1 C). 30 0M 60,7 L JUN 1 8 2003 Units Tdtal All Fees: Cyst Sq F# 01-322.11 1;322.1 1-322.14 $0.00 01-322.14 $0.00 $0.00 $0.00 $0.00 .0 0.0 0. . 00 $0.00 $107.42 -346.20 4-346.30 3-347.30 34-346-30 3-347.30 34-346-30 3-34'.30 34-346.42 3-347,42 F d - r City of 1Zexburff MNMMMK�, — - Permits and Licenses BujJd1*jU_z Perinit l""`� r ! qw,,T��,s n2 --Arm the Bl - I• - MID ou sC1 tttt-4l t�► : T -din � t Ra calculated2) Plumb' p cmit for No incy n-COmm I– Plunib 4�,:Pc=it for Commercial -- cost. of plumbMgy calculation 4) �NTatc�r and Sewcr pest - calculated F -5) �Vatc-rV,,aAtrandPaj--ts-� a I �.. F d the I thc� wat r (If F �6 L, L cat) r Busin CC � a.� B C LO rq F I rh EL n iz PL ------- aamn-,-Tualt .. i S Chy '� ' � �4 ' ��d•' ! �"� ! -.. � _ -fir � ,. ,[`�'�, ""` ''�0"% fay d - Ey�� 9• Service for Ga •- 1. 4� _ (53ajbag,e .Cip (�arbagxt, � coi� Ft l a o "fir C -ri l i-Purcbasc a far HE Service torNNTaterajad Sewer I�MUp Comact Cjt37 `water and St.. 1 �T { d 03 ri Q F 0 IR a BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building official, upon notification from the permit holder or his agent, shad make or cause to be made any necessary inspections and shatl either approve that portion of the construction as completed or shad notify the permit holder or his agent wherein the same falls to comply with this cede. 1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation: 2. FOOTING.- Common�y made after poles or piers ars sir or trenches car basement areas are excavated. Farms and horizontal reinforcing tied in place, vertical reinforcing cut and on jab site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shad included excavations for thickened slabs intended dor the support of bearing walls, partitions, structural supports, or equipment and sPecial reauirements for wood foundations. All forms and reinforcing steel, etc., shall be �n place. 4. PLUM-BING, MECHANICAL AND ELECTRICAL: Rou-ghinspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5_ TRUSS INSPECTION.9 Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (.E-lectrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly mads after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION- All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10., FINAL INSPECTION: Commonly made after the building is completed and ready -for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the celled 'inspections above, the building department may maks or require any other inspections to ascertain compliance with this cede and ether laws enforced by the building department. INSPECTION CARD The permit holder or his agent shall post the inspection record on the jab site in an accessible and conspicuous place to allow the building official to make the required entries. The record shad be maintained by the permit holder until the final inspection has been made and approved. have read the above and will comply in my requests for inspections bv giving 24 HOUR NOTICE prior for inspections to be made. Electrical. X24-3757 Building. 359-3020 ex 326 or 313 Plurnbing: 359-3020 ex 326 or 313 or 3.59-3034 Signature. Date: FlN !11l�lsv