HomeMy WebLinkAboutRECEIPT & DOCS - 03-00034 - BYUI - Storage BuildingBuilding Permit Valuation Fees
City of Rexburg (208)359-3020
12 North Center Street
Rexburg, Idaho 83440
Value of Construction:
Finished Sq Footage
Unfinished Sq Footage
Garage Square Footage
Construction Value Factor
Rate Chart:
Mechanical Valuation
Owner:
B ho ...... 'Construk
i T .
Building Name: r Residential
Address: 525 S Center........::. Basement
t
Cate:6/18/2003Apartments
Build'ing
Permit
Number
Per
Fees
20'000
30.00
$45030
Const, Type
0.00
A
Residential
or
1
0.00
200 000
Sq Ft
Cost --
$0.0Apartments
99,999, 999
3230.00
0.5%
Ft
Cost$0
.00
Commercial
0
0
So Ft
Cost
$0.001
F' rl i n
Begin
0
501
t01
253001
509001
100}001
500,001
1,000,001
= sol
Plumbing Permit
Rate Chart: Residential Non Commercial
Number of Fixtures 01
Sprinkler Feer $18,00
Rate Per Fixture $8.00
Base Fee $30.00
Rate ha :nr merci l
Cost of Florin:
Rate Chart:
Water & Sewer Permit
Begin
0
20,001
100,1001
2001001
Total Square Fat Cost $0.0
End Case Plus Per
500 23.50 0-00 100
TO 23.50 3.05 100
251000 69.25 14.00 1000
50j000 391.75 10.10 1,000
1001000 643.75 7M 1 000
500)000 993.75 5.60 1 000
110001000 3233.7,E 4.75 1 000
9919993999 5608.75 3.65 1 000
Number
Total Building Permit Fee:
Plan heck Fee:
Fixture Fee.-
01
Sprinkler Fee:
Base Fee -
Total Plumbing Kermit Fee:
Garage
70mrnercia- I
70�0 0
$0,00
$0.00
Fees
0.00
0.00
9766
0.00
0-0
0.00
0.00
0.00
$97.6$
$9.17
End
Bae
Plus
Per
Fees
20'000
30.00
3.0%
1
0.00
100,000
630.00
2.0%
1
0.00
200 000
2230.00
1.0%
1
0,00
99,999, 999
3230.00
0.5%
1
0.00
Water Line Size
Inches
Meter
Parts**
i
0.
$125.00
$182.00
*Total Meter r Farts
1,00
$195.00
$182.00
Deter Box $70.00
Fling & Lid $32.00
2. 00
si;327,79$49.62
CUTIS Stop $27,00
3.00
$1..868..00
Setter $53.00
4.00
$21618.50
Hookup Fees Water Rate
Digging Permit fees
Minlm.um
&
All
Homes $11100.00
Minimum
&
All
Horner
Apts (# of Students) $270.00
Apt {# of Students)
Apts (Family Housing) $425.00
Apts (Family Housing)
Water Front Footage $10.00
Sewer Front Footage
Total Water &Sewer permit Fees
Total Plumbing Permit Fee:
Number of
Bldgs
Total Water Deter and Parts:
Sewer Rate Students
$575.00
$437.50
0
$1 C). 30 0M 60,7
L
JUN 1 8 2003
Units
Tdtal All Fees:
Cyst Sq F#
01-322.11
1;322.1
1-322.14
$0.00 01-322.14
$0.00
$0.00
$0.00
$0.00
.0
0.0
0.
.
00
$0.00
$107.42
-346.20
4-346.30
3-347.30
34-346-30
3-347.30
34-346-30
3-34'.30
34-346.42
3-347,42
F
d -
r
City of 1Zexburff
MNMMMK�, — -
Permits and Licenses
BujJd1*jU_z Perinit
l""`� r !
qw,,T��,s n2 --Arm
the
Bl -
I•
- MID
ou sC1 tttt-4l t�► : T -din � t Ra
calculated2) Plumb' p cmit for No
incy
n-COmm I–
Plunib 4�,:Pc=it for Commercial -- cost. of plumbMgy calculation
4) �NTatc�r and Sewcr pest - calculated F
-5) �Vatc-rV,,aAtrandPaj--ts-� a I �.. F
d the I thc� wat
r (If F �6 L, L cat)
r
Busin
CC
� a.� B
C LO rq
F I rh EL n iz PL
------- aamn-,-Tualt
.. i
S
Chy
'� ' � �4 ' ��d•' ! �"� ! -.. � _ -fir � ,. ,[`�'�, ""` ''�0"%
fay d - Ey�� 9•
Service for Ga •- 1. 4� _
(53ajbag,e .Cip
(�arbagxt,
� coi� Ft
l a o "fir C
-ri l i-Purcbasc a far HE
Service torNNTaterajad Sewer
I�MUp
Comact Cjt37 `water and St..
1
�T
{
d
03
ri
Q
F
0 IR a
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shad make or cause to be made any necessary
inspections and shatl either approve that portion of the construction as completed or shad notify
the permit holder or his agent wherein the same falls to comply with this cede.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING.- Common�y made after poles or piers ars sir or trenches car basement
areas are excavated. Farms and horizontal reinforcing tied in place,
vertical reinforcing cut and on jab site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shad included excavations for thickened slabs
intended dor the support of bearing walls, partitions, structural supports, or
equipment and sPecial reauirements for wood foundations. All forms and
reinforcing steel, etc., shall be �n place.
4. PLUM-BING, MECHANICAL AND ELECTRICAL:
Rou-ghinspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5_ TRUSS INSPECTION.9
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (.E-lectrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly mads after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION-
All
systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10., FINAL INSPECTION:
Commonly made after the building is completed and ready -for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the celled 'inspections above, the building department may
maks or require any other inspections to ascertain compliance with this
cede and ether laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post the inspection record on the jab site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shad be maintained by the permit holder until the final inspection has been made and approved.
have read the above and will comply in my requests for inspections bv giving 24 HOUR
NOTICE
prior for inspections to be made.
Electrical. X24-3757 Building. 359-3020 ex 326 or 313
Plurnbing: 359-3020 ex 326 or 313 or 3.59-3034
Signature. Date:
FlN !11l�lsv