Loading...
HomeMy WebLinkAboutCOMCHECK - 03-00033 - Dr Kent Archibald PA - AdditionEnvelope Compliance Certificate 2000 IECC COMcheck-EZ Soffivare Version 2.4 Release 2a 'Data filename: CAProgram F1*1es\Check\COMcheck-EZ\#l,cck Section I : Proi ect Information Project Name: Designer/Contractor: Document Author: Dr. Kent M. Archbald Addition Byron Blakeley! Harris Construction Kent M. Archibald Section 2: General Information Building Location (far weather data): Climate Zone: Heating Degree Days (base,65 degrees F): Coaling Degree Days phase 65 degrees F): Buildin WIM Ivledica3. and Clinical Ca -re PrQJect Description (check o�: ) New Constniction /Addition Rexburg.1daho 16 $693 143 Perna Number Checked By/Date Floor Area 1112 Alienation � Unconditioned Shell (File Affidavit) Section 3: Requirements Checklist Air Leakage, Component Cerfification, and Vapor Retarder Requirements i. All joints and penetrations are sulked, Basketed, weather-stnppcd, or otherwise sealed. 2. Windows, doors-,." and skylights certified as meeting leakage requirements. 3. Component R -values & U -factors labeled as certified. 4. Vapor retarder installed_ Climate -Specific Requirements Component NamefDcSC!jPtIOn Roof 1: All -Wood JoistlRafterlTruss Exterior Wali 1: Solid Concrete or Masonry > 8Tt Furring. Wood Window I -P Metal Frame with Therms Break, Double Pane with Low -E Tinted, SHGC 0.30 Door 1: Solid Door 2: Aix Lock En#ry Basement Wall 1; Solid Concrete or Masonry > g•, Furring: Woad, Wall Ht 7. 0, depth B.G. 5.0 Floor 1: Heated Slab-On-Gradc-, Horizontal 2 ft. Gross Cavite Cont. Proposed Budget Area R -Value R -Value U -Factor U -Factor 1112 4_0 38.0 O.OZ� 0.047 1316 0.0 26.0, 0.035 0.0(7 100 0,250 0.520 1 0,500 0.112 21 --- __-0,250 0.112 878 0.0 0.0 0.465 0.091 105 --- 13.0 NO�_ (a) Budget U -factors are used far sollware baselinecalculatims ONLY and are not code requirements. Envelope PASSES: Design 10°/Q better than code Section 4: Comphance Statement The proposed envelope design. represented in this doctinient is consistent with the building plans, specifications and offer calculations submitted with tMs permit application. The, proposed envelope system has been designed to meet the 2000 IECC requirements in COMcheck-EZ Versioti 2.4 Release Za., Principal Envelope Designer -Name Signature Da fighting Compliance Certificate 2000 ICC COMeheck-EZ Software Version 2.4 Release 2a Data filename: CAProgram F11es\Chcck\COMcheck-EZ\# I . cck Sectl'on 1: Project Information Prqject Nees: Desi'gner/Contiractor: Document Atithor. Section 2.* General Information Building Use Description by: Building T Medical and Clinical dare Dr. Kent M. Archibald Addition Byron Blakeley/ Harris Construction Keit M. Archibald Whole Building Type Permit Number CheckedBy/Date Floor Area 1112 Project Desenption (check off): New Construction 'Addition � Alteration `Unconditioned Shell (File Affidavit) Section 3*0 Requirements Checklist slag. Dept. Use Inferior Lighting 1. Total actual watts must be less than or equal to total allowed watts Allowed Watts Actual Watts Complles(Y/N) 1775 4 YES Exter'lor Ligrhting 2. Efficacy greater than 45 luniens/W Exceptions - Specialized s -i. iz1*911fing highlighfing features of historic, buildin - signagel, l, safety or security lighting - low -voltage n lighting. Controls, Sand W ring 3. Independent .tr l for each space (switch/occupancy sensor). Areas that must be continuously lighted. 4. Master switcht enW. to hotel/inotel guest room. F wit � or iiin each space to provideunilight reduction capability. Exceptions: OnIN7 one luminaire p ace: A occupam -sensing device controls the ares.. The area is a corridore bra festroom, or lobby; Areas that must be continuously . h t l a trono time switch on exterior lights. -Exceptions: Areas requiring lighting :un daylight hours 7. Tandem w 1r one -lamp and three -lamp ballasted lufnina-ires. s: lighted; � Electrom'c high -frequency ballasts; luminaires nn not osame switch Section 4-,*, Compliance Statement The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this perliu't application. The proposed lighting system has been designed to meet the.2000 IECC requirements in COMeheck--EZ version 2.4 Release. Via. Principal i, hn Designer -Name Signature �104 khs._ Oiffr-lj Da Lighting Application Worksheet 2000 IECC COMcheck-EZ Software Version 2.4 Release 2a Section 1: Allowed Lighting Power Calculation 0 Buildill, Medical and Clinical Care Section 2. Actual Lighting Power Calculation B C Total Floor Allowed Area Watts (ft2) (watts/ffl Allowed Watts X 1112 1.6 1779 Total Allowed Watts = 1779 A B C D E F Fixture Fixture Description I Lamps/ # of Fixture ID Lamp Description 1 Wattgg�_Per Limp /.Ballast Fixture Fu=tures Watt. Q a E� 1 48" T12 40W 1 Electronic 4 12 160 EYenipt Exemption-, Special Medical/DentaUResearch 2 Incandescent 75W 1 19 100 exempt Exemption: Special Medical/Dental./Research Taal Actual watts — U Section 3; Compliance Calculation If the Total Allowed Watts minus the Total Actual bfl'dtts is greater than or equal to zero, the building complies. Total Allowed Watts = 17 7 9 Total Actual Watts = 0 Project Compliance 1779 Lighting PASSES: Desig n 100%betterthan code Mechani"cal Compliance Certificate 2000 IECC COMched--EZ Software Version 2.4.Release 2a Data filename: CAProgram Fi1cstChcck\COMcheck-EZ\41.cck Section 1: Project Information Project Name Designer/Contractor'. Docw-nentAuthor. Dr. Kent M. Archibald Addition Byron Blakeievl Harris Construction Kent M. Archibald Section 2.* General Information Builcling Location (far weather data); Climate Zone: Heating Degree Days (base 65 degrees F}: Cooling Degree Days (base 65 degrees F)- Rexburg, Idaho 16 8693 143 Permit Number Checked By/Date Project Description (checko,e}: New Construction ��Additivn � Alteration � Unconditioned Shell (Filc.Afflidavit) Section 3: Mechaniv ical Systems List Quantitv S-vstem Type_ &Description 1 HVAC System Z: Heating: Duct furnace, Gas I Cooling-. Packaged Tenninai Unit, Capacity 7000 Stu/h, Air -Cooled Condenser 1 Single Zone 1 Water Heating I : Senice Water Heater w1 Heat Trace Tape Installed Section 4: Requirements Checklist Bldg. Dept. Use j Requirements Specific To: HVAC System 2 1. Equipment minimum efficiency: J Duct Furnace (Gas). 78% Et Ca, Maximmn rapacity, 75% Et (q� Minimum Capacit� l � 2. Newly purchased cooling equipment insets the catling efficiency requirements I J Requirements Specific To: Water Hewing I [ l j 1.. Head maps in ideUoudet fittings [ � � 2_ 1.12 -in_ insulation on 8 ft of inlet/outlet piping if no integral heat gaps [ ] � 3. Automatic on/off control required for systems using heat trace tape � Generic Requirements: Must be met by all systems to which the requirement is applicable [ � � 1. Load calculations per I997 ASFRAE Fundamentals [ ] � 2. dant equipment and system capacitor no greater than needed to meet loads � - Exception: Standby equipment automatically off when primary system is operating [ - Exception: Multiple units controlled to sequence operation as a function of Ioad 3. Minimum one temperattiTe control device per system 4. Minimum one huim'dity control device per installed hunu*dificati,on/dehurWdificatiolI system 5. Thermostatic controls has 5 deg. F deadband _ Exception: Therniastats requiring manual char►geover between heating and cooling G_ Automatic Controls: Setback to SS deg. F (heat) and 85 deg., F (cool); 7 -day clvck, 2 -hour occupant override; 10-hou-r backup Exception: Continuously operating zones - Exception: 2 kid demand or fess. submit cakulations 7. Automatic shut-off dampers an ex-haust systems and supply systems with M*rf'lotiv X3;400 cfm 8. Outside -air source for ventilation; system capable of reducing OSA to required minimum 9. R-5 supply and return air duct insulation in unconditioned spaces R -S supply and return sir duel insulation outside the building RI -8 insulation between ducts and the building exterior when ducts are part of a building assembly - E�cepti�n_ Ducts located v��ithin equipment - Exception-, Ducts with interior and ex-kerior temperature difference not exceeding 15 deg. F. 10. Ducts sealed - longitudinal seams on rigid duct; transverse sums on all ducts- UL 1 S 1A or 181B tapes and mastics 11. Mechanical fasteners and sealants used to connect ducts and air- distribution equipment 12. Operation and maintenance manual provided to building owner 13. Balancing devices provided in accordance with fMC 603.15 1.4. Newly purchased serclice water heating equipment meets the efficiency requirement 15. Water heater temperature controls: 110 deg. F for dwelling units or 90 deg. F for other occupancies Section 5: Compliance Statement The proposed mecharucai design represented in this document i's consistent with the building plans, specifications and other calculations submitted witli this peanut application. The proposed mechanrt.cal systems have been designed #.o meet the x[}40 IEC requirements in COMcheck-FZ Version 2.4 Release 2a. Principal Mechanical Des prier -Noels Signature Da