HomeMy WebLinkAboutCOMCHECK - 03-00033 - Dr Kent Archibald PA - AdditionEnvelope Compliance Certificate
2000 IECC
COMcheck-EZ Soffivare Version 2.4 Release 2a
'Data filename: CAProgram F1*1es\Check\COMcheck-EZ\#l,cck
Section I : Proi ect Information
Project Name:
Designer/Contractor:
Document Author:
Dr. Kent M. Archbald Addition
Byron Blakeley! Harris Construction
Kent M. Archibald
Section 2: General Information
Building Location (far weather data):
Climate Zone:
Heating Degree Days (base,65 degrees F):
Coaling Degree Days phase 65 degrees F):
Buildin
WIM
Ivledica3. and Clinical Ca -re
PrQJect Description (check o�:
)
New Constniction /Addition
Rexburg.1daho
16
$693
143
Perna Number
Checked By/Date
Floor Area
1112
Alienation � Unconditioned Shell (File Affidavit)
Section 3: Requirements Checklist
Air Leakage, Component Cerfification, and Vapor Retarder Requirements
i. All joints and penetrations are sulked, Basketed, weather-stnppcd, or otherwise sealed.
2. Windows, doors-,." and skylights certified as meeting leakage requirements.
3. Component R -values & U -factors labeled as certified.
4. Vapor retarder installed_
Climate -Specific Requirements
Component NamefDcSC!jPtIOn
Roof 1: All -Wood JoistlRafterlTruss
Exterior Wali 1: Solid Concrete or Masonry > 8Tt
Furring. Wood
Window I -P
Metal Frame with Therms Break, Double Pane with Low -E
Tinted, SHGC 0.30
Door 1: Solid
Door 2: Aix Lock En#ry
Basement Wall 1; Solid Concrete or Masonry > g•,
Furring: Woad, Wall Ht 7. 0, depth B.G. 5.0
Floor 1: Heated Slab-On-Gradc-, Horizontal 2 ft.
Gross Cavite Cont. Proposed Budget
Area R -Value R -Value U -Factor U -Factor
1112 4_0 38.0 O.OZ� 0.047
1316 0.0 26.0, 0.035 0.0(7
100
0,250
0.520
1
0,500
0.112
21 ---
__-0,250
0.112
878 0.0 0.0 0.465 0.091
105 --- 13.0 NO�_
(a) Budget U -factors are used far sollware baselinecalculatims ONLY and are not code requirements.
Envelope PASSES: Design 10°/Q better than code
Section 4: Comphance Statement
The proposed envelope design. represented in this doctinient is consistent with the building plans, specifications
and offer calculations submitted with tMs permit application. The, proposed envelope system has been designed to
meet the 2000 IECC requirements in COMcheck-EZ Versioti 2.4 Release Za.,
Principal Envelope Designer -Name
Signature Da
fighting Compliance Certificate
2000 ICC
COMeheck-EZ Software Version 2.4 Release 2a
Data filename: CAProgram F11es\Chcck\COMcheck-EZ\# I . cck
Sectl'on 1: Project Information
Prqject Nees:
Desi'gner/Contiractor:
Document Atithor.
Section 2.* General Information
Building Use Description by:
Building T
Medical and Clinical dare
Dr. Kent M. Archibald Addition
Byron Blakeley/ Harris Construction
Keit M. Archibald
Whole Building Type
Permit Number
CheckedBy/Date
Floor Area
1112
Project Desenption (check off):
New Construction 'Addition � Alteration `Unconditioned Shell (File Affidavit)
Section 3*0 Requirements Checklist
slag.
Dept.
Use
Inferior Lighting
1. Total actual watts must be less than or equal to total allowed watts
Allowed Watts Actual Watts Complles(Y/N)
1775 4 YES
Exter'lor Ligrhting
2. Efficacy greater than 45 luniens/W
Exceptions -
Specialized
s -i. iz1*911fing highlighfing features of historic, buildin - signagel, l, safety or security
lighting -
low -voltage n lighting.
Controls, Sand W ring
3. Independent .tr l for each space (switch/occupancy sensor).
Areas that must be continuously lighted.
4. Master switcht enW. to hotel/inotel guest room.
F wit �
or iiin each space to provideunilight reduction capability.
Exceptions:
OnIN7 one luminaire p ace: A occupam -sensing device controls the ares..
The area is a corridore bra festroom, or lobby; Areas that must be continuously
. h t l a trono time switch on exterior lights.
-Exceptions: Areas requiring lighting :un daylight hours
7. Tandem w 1r one -lamp and three -lamp ballasted lufnina-ires.
s:
lighted;
� Electrom'c high -frequency ballasts; luminaires nn not osame switch
Section 4-,*, Compliance Statement
The proposed lighting design represented in this document is consistent with the building plans, specifications and
other calculations submitted with this perliu't application. The proposed lighting system has been designed to meet
the.2000 IECC requirements in COMeheck--EZ version 2.4 Release. Via.
Principal i, hn Designer -Name
Signature
�104
khs._
Oiffr-lj
Da
Lighting Application Worksheet
2000 IECC
COMcheck-EZ Software Version 2.4 Release 2a
Section 1: Allowed Lighting Power Calculation
0
Buildill,
Medical and Clinical Care
Section 2. Actual Lighting Power Calculation
B C
Total
Floor Allowed
Area Watts
(ft2) (watts/ffl
Allowed
Watts
X
1112 1.6 1779
Total Allowed Watts = 1779
A
B
C
D
E
F
Fixture
Fixture Description
I
Lamps/
# of
Fixture
ID
Lamp Description 1
Wattgg�_Per Limp /.Ballast
Fixture
Fu=tures
Watt.
Q a E�
1
48" T12 40W 1 Electronic
4
12
160
EYenipt
Exemption-, Special
Medical/DentaUResearch
2
Incandescent 75W
1
19
100
exempt
Exemption: Special
Medical/Dental./Research
Taal Actual
watts —
U
Section 3; Compliance Calculation
If the Total Allowed Watts minus the Total Actual bfl'dtts is greater than or equal to zero, the building complies.
Total Allowed Watts = 17 7 9
Total Actual Watts = 0
Project Compliance 1779
Lighting PASSES: Desig
n 100%betterthan code
Mechani"cal Compliance Certificate
2000 IECC
COMched--EZ Software Version 2.4.Release 2a
Data filename: CAProgram Fi1cstChcck\COMcheck-EZ\41.cck
Section 1: Project Information
Project Name
Designer/Contractor'.
Docw-nentAuthor.
Dr. Kent M. Archibald Addition
Byron Blakeievl Harris Construction
Kent M. Archibald
Section 2.* General Information
Builcling Location (far weather data);
Climate Zone:
Heating Degree Days (base 65 degrees F}:
Cooling Degree Days (base 65 degrees F)-
Rexburg,
Idaho
16
8693
143
Permit Number
Checked By/Date
Project Description (checko,e}:
New Construction ��Additivn � Alteration � Unconditioned Shell (Filc.Afflidavit)
Section 3: Mechaniv
ical Systems List
Quantitv S-vstem Type_ &Description
1 HVAC System Z: Heating: Duct furnace, Gas I Cooling-. Packaged Tenninai Unit, Capacity 7000 Stu/h,
Air -Cooled Condenser 1 Single Zone
1 Water Heating I : Senice Water Heater w1 Heat Trace Tape Installed
Section 4: Requirements Checklist
Bldg.
Dept.
Use
j Requirements Specific To: HVAC System 2
1. Equipment minimum efficiency:
J Duct Furnace (Gas). 78% Et Ca, Maximmn rapacity, 75% Et (q� Minimum Capacit�
l � 2. Newly purchased cooling equipment insets the catling efficiency requirements
I
J Requirements Specific To: Water Hewing I
[ l j 1.. Head maps in ideUoudet fittings
[ � � 2_ 1.12 -in_ insulation on 8 ft of inlet/outlet piping if no integral heat gaps
[ ] � 3. Automatic on/off control required for systems using heat trace tape
�
Generic Requirements: Must be met by all systems to which the requirement is applicable
[ � � 1. Load calculations per I997 ASFRAE Fundamentals
[ ] � 2. dant equipment and system capacitor no greater than needed to meet loads
� - Exception: Standby equipment automatically off when primary system is operating
[ - Exception: Multiple units controlled to sequence operation as a function of Ioad
3. Minimum one temperattiTe control device per system
4. Minimum one huim'dity control device per installed hunu*dificati,on/dehurWdificatiolI system
5. Thermostatic controls has 5 deg. F deadband
_ Exception: Therniastats requiring manual char►geover between heating and cooling
G_ Automatic Controls: Setback to SS deg. F (heat) and 85 deg., F (cool); 7 -day clvck,
2 -hour occupant override; 10-hou-r backup
Exception: Continuously operating zones
- Exception: 2 kid demand or fess. submit cakulations
7. Automatic shut-off dampers an ex-haust systems and supply systems with M*rf'lotiv X3;400 cfm
8. Outside -air source for ventilation; system capable of reducing OSA to required minimum
9. R-5 supply and return air duct insulation in unconditioned spaces
R -S supply and return sir duel insulation outside the building
RI -8 insulation between ducts and the building exterior when ducts are part of a building assembly
- E�cepti�n_ Ducts located v��ithin equipment
-
Exception-, Ducts with interior and ex-kerior temperature difference not exceeding 15 deg. F.
10. Ducts sealed - longitudinal seams on rigid duct; transverse sums on all ducts-
UL
1 S 1A or 181B tapes and mastics
11. Mechanical fasteners and sealants used to connect ducts and air- distribution equipment
12. Operation and maintenance manual provided to building owner
13. Balancing devices provided in accordance with fMC 603.15
1.4. Newly purchased serclice water heating equipment meets the efficiency requirement
15. Water heater temperature controls: 110 deg. F for dwelling units or 90 deg. F
for other occupancies
Section 5: Compliance Statement
The proposed mecharucai design represented in this document i's consistent with the building plans, specifications
and other calculations submitted witli this peanut application. The proposed mechanrt.cal systems have been
designed #.o meet the x[}40 IEC requirements in COMcheck-FZ Version 2.4 Release 2a.
Principal Mechanical Des prier -Noels
Signature
Da