HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00029 - 111 N 2nd W - Storage GarageCITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspectionsw For on-site construction, from time to time the bu"Iding official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
insDections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this rode.
1 . LAYOUT: Lot corners staked, staking in place for building, prior to excavation;
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Foams and horizontal reinforcing tied in olace,
vertical reinforcing cit and on job site or tied in place..
3. FOUNDATION INSPECTION:
The foundation ins-nection shall included excavations for thickened slabs
intended for the seaport of hearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4, PLUMBING, MECHANICAL AND ELECTRICAL:
Rough insoectiom, Commonly made prior to cowering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
brae'ling are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard iol'nts and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION.-
Commonly
made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
in addition to the called inspections above, the building department may
maks or require any ether inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall past the inSDection record on the job site in an accessible
and conspicuous place to allow the bl,jilding official to make the required entries. The record
sham be maintained by the permit holder until the final insr)ection has been made and approved.
f have read the above and will comply in my requests for inspect'lons by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-37f7 Building-, 359-3020 ex 326 or 313
Plumbina;.W9-3020 ex 326 or 3'13 or
Signatur
Date: