HomeMy WebLinkAboutT2M DAILY FIELD REPORTS - 03-00028 - BYUI Rick Building - New Building02 Page 1 of 1 P.O. Box143 Rexburg, ID 83440 Daily Field Project: Thomas E. Ricks Building Location: Rexburg, ID Client*. 'BYU Idaho Project No.: 03-0003 Equipment Jerome Bowen Double J Concrete Work Force: Double J Concrete 1 Volvo L90c Loader 1 CAT 320 Track hoe 3 End Dump Trucks. 1 Case 95xT Bobcat 1 Supervisor 5 Foremen 19 Laborers Z Foremen 3 Truck Drivers 2 Operators 2 Laborers Report DaW,Uh 8/25/03 Weather: Hot Temperature: HI:,8r LO: 47° Day of the Week: Monday 1Q.5 Hours 10.5 Hours 10.5 Hours 10,.5 Hours K911imM 11.0 Hours 11.0 Hours 11.0 Hours 10. 5 Hours 10.5 Hours 10.5 Hours 10.5 Hours Jacobsen's I Supervisor 1D.0 Hours special Inspector observations: Contractor hours: Jerome Bowen 7:00 am to 5:3D pm Double J Concrete 6:0U am to 5:00 pm Jacobsen"s 7.0a am to 5:4Q pm Jerome Bowen. Section X300: Contractor continued excavating waterline trench on the South side of building and cleaning site. Double J Concrete: Section 3300%. Contractor placed reinforcement steel and set forms for stem walls and columns. Columns are on grid lines M.0/4.0, L.0/3.3, F.0/3-.0.rE.0/3-0r E.0/3.3 and E-5/3.3. The walls are at grid fines N.0/3.0 to ].5/3.0, J.5/2.0 to J.5/3.0, ].5/2.0 to M.0/2.0, M.0/1-0 to P-.0/1.0 and P.0/1.0 to P.0/3.0. Contractor also placed 45 cubic yards of concrete i 1 nto spot footings at grid lines E.5/3.3, C-0/3-31 C.5/3.0, D.0/3.0 and D.0/3.3. I performed concrete control tests and cast one set of four cylinders. The slump is 3 1/2" and the air content is 7.0%. dear Fabrication: Contractor continued wedding stem and condensate lines along the east side of building. Special Inspector: Clayton Maher Reviewed By: Bret McGowan P.0- BoA43 Rexburg., ID 83440 Daily Field Report Project: Thomas E. Ricks Building Date: 8/27/03 Location: Rexburg, ID Weather. Clear Client: BYU Idaho Project No.: 03-0003 Equipment: Jerome Bowen double J Concrete Work Force: Double I Concrete Jerome Bowen Jacobsen'rs 1 Volvo L90c Loader 1 CAT 320 Track. hoe 3 End Dump Trucks 1 Case 95xT Bobcat I Supervisor 5 Foremen 19 Laborers z Foremen 3 Truck Drivers 2 Operators Z Laborers 1 Su NiSf3r Page 1 of 2 Temperature: HI: 80') LO: 59° Day of the Week: Wednesday Special' Inspector observations: Contractor hours. Jerome Bowen Double J Concrete Jacobsen"s Jerome, Bowen: Section 2300.,, Contractor continued excavating waterline trench on cleaning site, 10.5 Hours 10-.5 Hours 10.5 Hours 10.5 Hours 11-.0 Hours 11.0 Hours 11.0 Hours 11.0 Hours 10.5 Hours 10.5 Hours 10. 5 Hou rs 10.5 Hours 10-.0 Hours 7:00 am to 5:30 pm 6:00 am to 5:00 pm 7:00 am to 5:00 pm the South side of building and Section 2300: Contractor backfilled waterline trenchon south side of building. I performed in place field density tests by nuclear method, All bests exceeded project specification of 95% of ASTM D1557. Section 2510.: Contractor placed 1201-inear feed of C].51 ductile Iran wafer line from 1,00-' west of southeast comer of building to 220" west of southeast corner. Special Inspector: Clayton Maher Reviewed By: Bret McGowan P.O. Boxl,43 RrjD11UjU � 10 OUNU D i1v Field Re Special Inspector observations: Double J Concrete: Page 2 of 2 Section 3300: Contractor placed 75 cubic yards of concrete into wails at grid lines M.0/4.0, L.0/3.3, FsO/101EO/101 E.0/3.3 and E.5/3.3. The walls are at grid lines N.0/3.0 to J.5/3.0, 7.5/2.0 to J.5/3.0, 1.5/2.0 to M.0/2.0, M.0/1.0 to P.0/1.0 and P.0/1.0 to P.0/3.0. I performed concrete control tests and cast two sets of four concrete test cylinders. The slump on the first test is 73/4 " and the air content is 5.0%. The slump on the second testis 7 Mzf" and the air content is 5,.2%e Section 3300: Contractor placed 18 cubic yards of concrete into columns at gridlines M.0/4.0, L.0/3.31 F.0/3.00, F.0/3.3, E.0/3.0 E.0(3.3 and E.5/3.3. I performed concrete control tests and cast one set of four concrete test cylinders. The slump is 4"" and the air content is 3.2%,. Special Inspector. QAyton Daher Revj,wwed BY: Bret McGowan D ail WML _ _Jf -2 P.O. Box143 .kexburg, ID 83440 M 4, MM AM I Jerome Bowen Section 2300: Contractor continued backfiffing and compacting waterline trench on the South side of building. Section. 2300: Contractor continued backfilling inside building at grid Eines J.0/1.0 to K.0/1.0 •ti.....,.t, i -:? n r^ v nn n nar-i.ru matarial is nit n with oversize material. I established a I vuly *vim 9 rolling pattern and performed visual inspections. Contractor started badcMing inside building, at gridlines K.0/3.0 to K.0/8.0 through M-.013.0 to vi.o/8.0- Double J Concrete: Section 3300: Contractor placed steel reinforcement and set forms into walls at gridlines N.0/3.0 to 1.5/3.0,15/2.0 to, J.5/3.0, 7.5/2.0 to K.012 -.O and C.0/2.2 to D.0/2.2. WinslovVs Waterproofing: Section 3300: Contractor placed waterproofing on gridlines G.0/4.7 to K.0/4.7, K.0/4.7 to K.0/8.0 And K.0/8.0 to M.0/8.0. Bear Fabrication: Contractor continued fry up and welding on beam and condensate lines east of building. Special Inspector: Clayton Maher Reviewed By: Bret McGowan P.O. Box143 Spedal Inspector observations. Page 2 of 2 Jerome Bowen: Section 2300: Contractor continued backfill'ing and campa4fting waterline trench on the South side of building, Section 2300: Contractor continued bacIdiffing inside building at gridlines K.0/3,.O to K.0/8.0 through M-0/3-0 to M.0/8.0- Double j Concrete: Section 3300: Contractor removed forms. Section 3300: Contractor placed steel reinforcement into walls at gridlines H.0/3.0 to J.5/3.0, J.5/2.0 to J.5/3.0, J.5/2.0 to K.0/2.0 and c.0/2.2 to D.0/2.2. Window's Waterproofing: Section 3300: Contractor placed waterproofing on gridlines N.0/3.3 to N.0/7.0. Bear Fabrication: Contractor continued fit up and welding an Stearn and condensate cines east of building. Special Inspector: Clayton Maher Reviewed By: Bret'McGowan P.O. Box143 Rexburg, ID 83440 Special Inspector observations: Page 2 of 2 G.h Jerome Bowen: Section 2300: Contractor continued backfilling inside building at gridlines K.0/3.0 to K.0/8.0 through M.0/3.0 to M.0/8.0. Double J Concrete: Section 3300. Contractor placed 77 cubic yards of concrete into walls at gridlines H.0/3.0 to J.5/3.% j.5/2,0 to 3.5/3.0.1.5/2.0 to K,,0/2,,O and c.012.2 to D.0/2.2. I perfb concrete control tests and cast 2 sets of concrete fest cylinders. The slump on the first test is 7 '12." and the air content is 5.70/a. The slump an the second test is 8"' and the air content is 520/o., Contractor placed 8 yards of concrete into aviumns at gridlines M.0/10., M.5/3.Q, K.5/3.0 and grade beam K.5/2.0 to K.5/3.0. The SIuC11p 15 7 1I4" and the air content is S.2%. Special Inspector: Clayton Maher Reviewed By: Bret McGowan P.O. BoX143 Rexburg, ID 83441 .jkrj .71T&OT71[ ML 0 0 0 1 Spedal Inspector abservaUons: Page Z of 2 a Jerome Bowen: Section 2300: Contractor started backfilling inside building at gridlines M.0/3.0 to M.0/7.0 through N.0/3.0 to N.0/7.0. Double I Concrete: Section 3300: Contractor removed forms. Section 3300: Contractor placed steel reinforcement into walls at gridlines at A.7/1.6 to A.7/1.6, A.7/1,.6 to A.7/2.2 and A.7/2.2 to 8.0/2.2 Winslow's Waterproofing: Section 3300: Contractor placed waterproofing on gridlines M.0/1-0 to R10/1-0-1 Bear Fabrication. Contractor continued welding on steam and condensate lines east of building. Special Inspector: Ciavton Maher Reviewed By: Bret McGowan P.O. Box,143 Rexburg, ID 83440 Daily Field Report Specie! Inspector observations: Page 2 of 2 Jerome Bowen: Section 2300: Contractor canUnued backfilling inside building at gridlines M,0/3.0 to M-0/7.0 through N.0/3.D bD N.0/7-01. Double 3 Concrete: Section 3300: Section 3300. Contractor placed 80 cubic yards of concrete into walls at gridlines A.7,11,6 to A.7/1.6, A.7/1.6 to A.7/2.2 and A.7/2.2- to R.0/2.2. Concrete euntrai bests were perfo ed and 3 sets of 4 test cylinders were cast. The slump on the first test is 7"' and the air content is 5.0%. The sump on the second test is 7 1/2"' and the air content is 6.0%. The slump an the third test is T'f and the air content is 5.2°l0. Bear Fabrication: Contractor finished welding on steam and condensate lines east of building. Clearwater Environmental perforrmed UT on welds for tie in on steam and condensate lines. Special Inspector: Cla Aon Maher Revi By: Bret McGowan P.O. Box143 Rexburg, ID 83440 Daily Field Report project: Thomas E. Ricks Building Date: 9/13/03 Location: RexburgID Weather: Clear., Client- BYU Idaho Temperature: HI: 76° LO: 60° Project No.: 03-0003 Day of the Week,* Saturday Equipment: Work Force: Double J Concrete 3 Finishers 3.0 Hours Special Inspector observations: Contractor hours: Double J Concrete 6,,009 am to 9:00 am Double 3; Section 33011. contractor placed 8 Cubic yards of concrete over waterfine in entrance way of parking lot, I performed concrete control tests and Gast one set of test cylinders. The slump is 3 3/4" and the air content is 4.9% Special Inspectoraw, n Maher Reviewed By: Bret McGowan P.O., Box143 Daily Field Resort Special Inspector observations: Jerome Bowen: Section 2300: Contractor continued backfilling through N.0/3.0 to N.0/7.0.o inside building at gridlines M.0/3.0 to M.0/7.0 Double J Concrete; Section 3300: Section 330D: Contractor pieced reinforcing steel in wars at gridlines A.0/13.0 to A.0/4.0 at elevation 4-' to 8', Bear Fabrication: Contractor installed supports dor steam and condensate lines. After reviewing the. UT report and x-rays, the weids tested on 9-1Z-03 were rejected. Special Inspmtvr. Clayton Maher Reviewed By: Bret McGowan P.O. Box143 Rexburg, 1D 83440 i.ly Field Repo;r.t AL WMIL AL W'%� &-'r ilia] I rp Jerome Bowen: Section 2300,: Contractor continued backfilling inside building at gridlines K.0/3.0 to K.0/8.0 through M.0/3.0 to K-0/8.0 and M.0/3.0 to M.0/7.0 through N.0/3.0 to N,.0/7,,.O,. Double J Concrete: Section 3300: Section 3300: Contractor placed reinforcing steel in wars at gridlines A.013.0 to A.0/4.0 at elevation 4' to 8'. Bear Fabrication: Con ctor installed supports for steam and condensate lines. Danco: Section 5000: Contractor placed structural steel columns at gn-dlines D.0/2.2 to D.0/3.0 through G.0/2.2 to G.0/3.0. Note. Bear Fabrication: Contractor cut out the welds rejected on 9-15-[]3 on the Steam. and Condensate lines. I observed the new welds as they were placed. All welds exceeded minimum specifications as per AWS DLI. Spacial Inspector: Clayton Maher Reviewed By: Bret McCowan P.O. Box143 Rexburg, ID 83440 Special Inspector observations: Page 2 of 2 Jerome Bowen: Section 2300: Contractor continued backfilling inside building at gridlines K.0/3.0 to K.0/8-0 through M.0/3.0 to M.0J8.0 and M.0/3-0 to M.0/7.0 through N.0/3-0 to N.0/7.0. Double J Concrete.a Section 330Q: Contractor placed 66 cubic yards of concrete at gridlines A.0/3.0 to A.0/4.0 at elevation 4' to 8'. Concrete control testi were performed and 2 sets of 4 test cylinders were cast. The slump an the first test is 73/4"" and the air content isftes Me slump on the second test is 8"" and the air content is 4.5%*1 Bear Fabrication: Contractor installed supports dor steam and condensate Eines. Danco: Section 5000: Contractor placed structural steel beams at gridlines D.0/2.2 to,D.,0/3.0 through G.0/2.2 to G.0/3.0. Spedal Inspector: Cln Maher Reviewed By: Bret McGowan P.0- Box143 Rexburg, ID 8.3440 e o rt, Dailv Field R p Special Inspector observations: Page Z of 2 Jerome Bowen: Seffon 2300'., Contractor continued backf��tng inside building at gri slim K.0/3.0 to K.0/8.0 through M.0/3.0 to M.0/8.0 and M.0/3.0 to M,0/7.0 through N.0/3.0 to N.0/7.0. Contractor placed 11 cubic yams sof concrete into thrust blocks for steam and condensate dines. Double I Concrete: SectJon 3303: Contractor removed forms at gnadlines A.0/3.0 to A.0/4.0 at elevation 4' t0 8'. Danco: Section 5000: Contractor placed structural steel beams at gridlines D.0/3,60 to D.014.7 .. _ _� r nin -7 .i crnrt<rt nlarinn Aerkino at aridl1f125 D.0/3.3 t0 D.0/4.7 rj rn ".Ula.0 LU -U/ - U" through G.0/3-3 to G.014.7. Special Insp-ector: ala Ston Maher Reviewed BY: Bret McGowan RO- Box -143 Rexburg, ID 83440 Daily Field Report Special Inspector observations: Page 2 of 2 Jerome Bowen: Section 23(}Q: Contractor continued placing 3/4" a99�'+�9ate fill material and graded in parking lot.. Double 3 Concrete: Section 330D: Contractor placed steel reinforcement and yet forms into Columns at gridlines C.0/3.O. C.0/3.3 and C.5/3.0. Danco: Section 5000m. Contractor continued to weld decking at gridlines D.0/3.3 to D.0/4.7 through G.0/3.3 to G.0/4.7 and started welding Nelson studs. Special Inspector: Cn Maher Reviewed By; Brei McGowan P-0- Box143 Rexburg, I D 83440 Daily Field Report Special inspector observations: Page 2 of 2 Jerome Bowen. Sedion 23:00: Contractor continued w grade and compact in parking lot and started to place fid{ and compact in approach. Double J Concrete: Section 33-00: Contractor placed steel C.0/3.0, C.0/3.3 and C,.5/3..O. Ranco: reinforcement and set formsinto columns at gridlines Section 5000: Contractor finished welding Nelson studs. I performed weld inspecCion on puddle welds and Nelson studs at gridlines D.0/3.3 to D.0/4.7 through G.0/3.0 to G.0/4.7., The puddle welds passed and I failed 42 Nelson scuds. Spec'iai Inspector: ClaAon Maher, Reviewed By: Bret McGowan .12 P1Q1 UgAl "Ir, Rexburg, ID 83 1 D ily Fiel,d Report Special Inspector observations. Jerome Bowen: Section 2300: Contractor continued to compact in parking lot and approach. Double I Concrete: Section 33D0: Contractor placed steel reinforcement and set forms. Ranco: Section 5000: Contractor replaced failed Nelsen studs. I observed corrections made to deficient stud. A11 studs were found to meed minimum requirements. Special Inspector,. C1 Maher Reviewed By,a Bret McGowan P.O. Box143 Rexburg, ID 83440 Special Inspector observations: Jerome Bowen: Section 2300*. Contractor continued to compact in parking lot and approach. Page 2 of 2 Double ) Concrete: Section 3300: Contractor placed 60 cubic yards of light weight concrete in slab on deck at grid lines D.0/3.3 Co D.0/4.7 through G.0/3.3 to G.0/4.7. Special Inspector: Cla an Maher Reviewed By; Bret McGowan MMEAl' e n Daily Field Report Special Inspector observat!9 ions: Page 2 of 2 Jerome Bowen: Section 2300.- Contractor began filling inside building at grid lines A.4/2.Z to C.0/2.2 through A.0/3.3 to C.0/3.3. Backfill material is pig run w�h oversize material. I estahlished a rolling pattem and performed visual inspections. Double 3 Concrete: Section 3300: Contractor placed 77 cubic yards of concrete for stem walls at gridlnes I -0/10 to K.0/1,0, K.0/1.0 to K.0/2.0, 3.5/2.0 to K.0/2.0 and 3.5/2.0 to x.5/3.3. Concrete control bests were performed and two sets of four concrete test cylinders were cast. The stump on the fiat test is 6 3/4"" and the air content is 5.t1%. The slump an the second test is 7 1I`2" and the air content is 4.5%. Danco: Section 5000: Contractor placed decking at gridlines D.0/2.2 to H.,0/2.2 through D.013-3 to H.0/3.3. Special Inspector ClIaAon Maher Reviewed By: Bret McGowan P.0- Box143 Rexburg, ID 83440 Dailv Folel Report Special Inspector observations: Conb-actor hours: Jerome Bowen Double 3 Concrete Jacobsen"s H K Contractors Page 2 of 2 N 7:00 am to 5:30 pm 6:00 am to 5:00 prn 7:00 am to 5:00 pm 7:00 am to 9:00 pm Jerome Bowen; Section 23+D0: Contractor Continued filling inside building at grid lines A,,0/2.2 bD C.0/2.2 through A.0/3.3 to co/3.3. Backfill material is fit run with oversize materiai, I established a rolling pattern and per -formed visual inspections. Double I Concrete: Section 33D0: Contractor placed 33 cubic yards of concrete into walls at gridlines B.0133 to B.0J4.0 and A.5/3.3 to BA/3.3 at elevation 0' to S'. I performed one concrete control test and cast one set of four concrete test cylinders. The stump is 811 and the air -content is 5.4%. H K: Section 2741: Contractor continued to place asphalt at entry ways. I established a robing pattern. I monitored placement and verified roiling patterns. Asphalt temperatures ranged from. 265c'to Z95°, Special Inspector: Clan Maher Reviewed By: Bret McGowan Page 1 of 1 P.O. Box143 Rexburg, ID 83440 Daily Field Report Project: Thomas E. Ricks Building Date: I0J03/03 Locations. Rexburg, ID Weather. Clear Client: BYU Idaho Temperature: HI: 75° LO: 57° Project No.: 03-0003 Equipment.0 Jerome Bowen Double J Concrete Work Force. Double 3 Concrete Jerome Bowen Jacobsen's bay of the Week: Friday 1 Volvo L90c Loader 1 CAT 320 Track hoe 3 End Dump Trucks 1 Case 95xT Bobcat 1 New Holland LS 180 Bobcat 1 Supervisor 5 Foremen 13 Laborers 2 Foremen 3 Trick Drivers 2 Operators 2 Laborers supervisor 10.5 Hours am �a 5:3� 10.5 Hours 10.5 Hours 10.5 Hours 7.00 11-.0 Hours 11.0 Hours 11.0 Hours 11.0 Hours 10.5 Hours 10.5 Hours 10.5 Hours 10.5 Hours 10.0 Hours SpecialInspector observations* Contractor hours: 3e�ome Bowen 7:00 am �a 5:3� pm Double J Concrete 6:00 am to 5,w.00 pm Ja+coasen`s 7.00 am to 5:00 prn Jerome Bowen: lection z300; Contractor Continued fitting inside building at grid lines A,0,12.2 to C.0/2.2 through A.0/3.3 to C.0/3.3. Backfii1 material is pig run with oversize material. I established a riling pattem and performed visual inspections, Double I Concrete: Section 3300: Contractor stripped forms. Contractor',aced 60 cubic yards of clean concrete into slab on deck at gridlines D.0/2.2 to D.0/3.3 through H.0/2-.2 to N.013.3. Special Inspector: Gayton Maher Reviewed By: Brei McGowan P.O. Rexburg, ID 83440 Damily Field -Report Special Inspector observations. Page 2 of 2 / W Jerome Bowen Section 2300*. Contractor Continued filling inside building at grid lines A.0/2.2 to CPO/2.2 through A,0/3.3 to C.0/3,3. Backfill maienal is pit run with oversize material. I established a robing pattern and performed visual inspections. Double J Concrete: Section 33U0: Contractor place 22 cubic yards of concrete for fan pads in mechanical room at gridlines H.0/1.0 to K,,O/I,.O through H.0/3.0 to K.0/3,01. Special Inspe�:orClayton Maher Reviewed By: Brei McGowan Rexburg, I D 83440 Speeial Inspector observations: Page 2 of 2 Jerome Bowen: Section 2300; Contractor Continued filling inside building at grid lines A.0/2.2 to C.012.2 through A.0/3.3 to C.0/3.3. Backfill material is pit run with oversize material. I established a rolling Nittem and performed visual inspectiflns. Double J Concrete: Section 33D0: Contractor placed 17 cubic yards of concrete into wads at gridlines B.0/3.3 to 8.0/4.0 and A.5/3.3 to B.0/3,3 at elevation Wto 2W. I perfbrmed concrete control test and cast one set of concrete test cylinders. The slump is 7 1/2" and the air content is 5.7 %1Y Danco: Section 5000: Contractor placed and welded ledger beams at gridlines D.0/4.7 to G.0/4.7 and G.033 to G.0/43. Specaai Inspec#or: Slayton. Maher Reviewed By: Bret McGowan P.O. BOX143 Rexburg, ID 83440 Spedal Inspectvr observabions. Page 2 of 2 1 0 lD Jerome Bowen: Section 2300: Contractor Continued filling inside building at grid lines A.0/2.2 to C.0/2.2 through A,0I3.3 to C.0/3.3. Backfill material is pit gun with oversize material. r established a roiling pattern and performed visual -inspections. Double J Concrete: Section 3300: Contractor swiped forms. Danco: Section 5000:- Contractor placed and welded decking and Nelson studs at gridlines D.0/4.7 to G,0/4.7 and G.03.3 to G,.0/4.7. I performed welding inspections on ledger beams and Nelson studs. 42 Nelson studs were rejected throughout gridlines D-0/4.7 to G.0/4J and G.03.3 to. G.0/4.7. Special Inspector: Clayton Maher Reviewed Sy: Bret McGowan P.O. Box143 Rexburg, ID 83440 1� Page 2 of 2 Jerome Bowen: Section 2300: Contractor Continued filling inside building at grid fines A.0/2.2 to C.0/2.2 through A.0/3-3 to 0.0/3.3. Backfill material is pit run with oversize maienal. I established a rolling pattern, and performed visual inspections. Double I Concrete: Section 3300: Contractor stripped forms.. Danco: Section 531LO: Contractor made corrections to deficient studs found on 10-1.0-Q3, Note: I observed corrections made to deficient studs found an 1D -1.Q -U3. All studs were found to meet minimum requirements. Special Inspector; Clayton_ Maher Reviewed By. Bret McGowan Daily Field Report l 0 Page 2 of 2 lerome Bowen.It Section 23D0: Contractor placed bedding sand at gridlines M.0/1.0 to M.013.0 through P.(]/1.0 to P.of3.o. Double I Concrete: Section 3300: Contractor Placed 55 cubic yards of light weight concrete for slab on deck at gridlines D.0/3.0 to Q.0/4.7 through G.0/3.D to G.0/4.7, second -floor. Contractor also placed 22 cubic yards of concrete into will on gridlines A.013.3 to B.0/3.3 and A,7/3.0 to B.0/3.0, elevation 8` to 1b`. I performed a concrete cnntrol test and test one set of 4 concrete fest cylinders. The slump is 5 1l2" and the air content is 5.6%0 Special Inspector: ClaAon Maher Revi.....By. fret McGowan P.O. BoA43 Rexburg, ID 83440 Double .3 Concrete: Section 330U: Contractor continued to place reinforcement steel into walls for the eievatvr on A line,, Contractor placed 66 cubic yards of iight weight concrete with Nowa mesh into second floor slab on deck at grid lines D.0/2.2 t4 D.0/3.3 through H.0/2.2 to H..0/3.3. Danco: Section 5310: Contractor placed Steel Beams at grid lines K.0/5.8 to K,0/8..O through M.0/5.8 to M.0/8.0 for second floor. )1D Special Inspector: Clayton Maher Reriewed By. Bret McGowan P.O. Box143 Rexburq, ID 83449 DailYFieid Report Double 3 Cancrete: section 3300: Contractor placed 24 cubic yards of concrete into elevator walls at A-line. ties broke at the bottom of the fomes just as contractor was finishing place men�, 14 cubic yards of concrete discharged from fomes intobottom -othe elevator shaft Aroximately * Contractor ordered an extra 16 cubic yards of concrete and finished placement. The bottom of the elevator shaft was over excavated byapproxim.isbottom of shaft for fill,atety 5 feetCDntractor left the concrete in Danco: Section 53100- Contractor placed Steel Columns at grid lines K.0/5.8 to K.0/8.oM.0/5.8 to M-0/8.0 for Roof., Contractor Placed Steel Beams at grid lines M.,o/5.8 to to N,0/7A., MwO/7.4 through N.O/S.8 dpedal inspector lavton Whe h ReViewed By: Bret M Nwa. P-0. BoA43 Rexburg, ID 83440 Page 2 of 2 Daily Field Report Double J Concrete: Corr..,., zqnn. r,..,�..,+..- --'-- io MAUI --��-•�����. ua�I N,au�, Yv CU DIC yarns of concrete into slab on grade at grid lines M.0/2.5 to M-0/3.0 through P.0/2.5 to P.0/3.0 and K.6/1..O to K.6/3.0 through M,,0/1.0 to M.0/3.0. Jerome Bowen: Section 2300: Contractor excavated Steam and Condensate line trench along South side of building. I SPecial InsPector: Clayton.Maher Reviewed 8y. Bret McGowan Dail' Special Inspector observations: R. . Box143 Rexburg,' ID 83440 Page 2 of 2 Double J Concrete: Section 3300: Contractor placed reinforcing steel and set forms at grid lines H.0/1.0 to H.0/2.2, H.0/1.0 to K.0/1.0 and K.0/1.0 to K.0/2-0 at elevation 11to 18` above floor elevation, and at stairs at grid lines M-2/7.4 to N.0/7.4 at elevation 10 -'to 18'r. Mickelson"s: Section 4810: Contractor set scaffolding and placed CMU walls at grid lines 13.3/2.2 to 6.3/2.5, 8.0/2.5 to 13.3/2.5 and B.0/2.2 to B.3/2.2 at elevation 4"' to Wabove floor elevation. dear Fabrication: Contractor placed and welded steam and condensate lines an the south side of building. Note: Section 512D: 1 performed High Strength Boit inspection with a torque wrench an ASTM A X25 Bolts on all bolts West of the Match line. All bolts met minimum required torque as per RCSC specifications, special Inspector: Clavton Maher Reviewed Oyu, Brei McGowan - RO. Box143 , Rexburg, ID 83440 Daily Field Report Page 2 of 2 Double J Concrete: Section 3300: Contractor continued to place reinforcing steed and yet firms at grid lines H.O/1.Q to H.0/2.2, H,.O/I:.O to K.4/1.D and K.0/1.0 to K.0/2,0 at elevation 11' to 18'r above floor elevation and at stairs at grid lines M,,2/7,.4 to N.0/7.4 at elevation 10" to 18-f. I Section 330D: Contractor placed 21 cubic yards of concrete into stab on grade at grid lines G.0/4.0 to G -0/4.7K.014.0 trough to K.014.7. I observed placement of concrete. Temperature of concrete was 68DF. and the air temperature was 31° F. Mickelson's: Section 481U: Contractor placed 5 cubic yards walls at grid lines B.3/2.2 to B.3/2.5, B.0/2.5 to 13.3/2.5 and 13.0/2.2 to B,5/2.2 at elevation 4'to 8'above floor elevation, Bear Fabrication: Contractor continued to place and weld steam and condensate lines on the south side of building,, Jerome Bowen: Section 2300: Contractor continued to place til matenal inside building at grid lines A,0/1..6 to A-0/2.5 through A.7/1.6 to A.7/2-5. Fid! material is Pit --Run and is. foo granular to test for compaction. I observed placement and compaction of material. Material was placed in 5" lifts and adequately compacted with a mechanical hand Compactor,. Special Inspector: Clavron Maher Reviewed 8y: Bret McGowan P-0. BOX143 Rexburg, ID F el d.� R rt I e o zopeuai inSpettor Observations: Page 2 of 2 Double .I Concrete; Section 33,00: Contractor continued to place reinforcing steed and set dorms at grid lines H I -to to K-0/2.2., H.0/1.0 to K.0/1.0 and K.0/1.0 to K.0/2 -.O at elevation 11` to jg,above fc�rr elevation, and at stairs at grid lines M.2/7,4 to N.0/7:4 at elevation 1D' to 18'. Section 3300: Contractor placed 21 cubic yards of concrete into slab on grade at grid' lines G.0/4.p to GwO/4s7 trough:K.0/4.0 to K.0/4.7. I observed placement of concrete. Temperature of concrete was G8° F. and the air temperature was 310 F. Mickelson's. Section 4810: Contractor placed 7.5 cubic yards walls at grid lines E1.3/2.2 to B.3/2.5, B.0/Z,5 to 6.3/2,5 and 13.0/2-2 to B.5/2.2 at elevation 8'above Floor elevation to top of wall. Bear Fabrication'. Contractor continued to place and weld steam and condensate lines on the south side of buinng. Jerome Bowen: Section Z300: Contractor continued to place fill material inside building at grid lines A.u/l,,6 to A.0/2,.5 through A.7/1.6 to A.7/2.5- Fri! material is Pit -Run and is too granular to test for compaction. I observed placement and compaction of material. Material was placed in 6" lifts and adequately compacted with a mechanical hand compactor. SPed"al Inspecutar: Clayton Maher Reviewed By: Bret McGowan P.O. Box143 Rexburg, 183440 Daily Field Report Page 2 of 2 Double I Concrete: Section,3300: Contractor continued to piaci reinforcing steed and set farms at grid lines H.0/1.0 to H-0/2.2. H.0/1.0 to K.0/1.0 and K.011.0 to K.0/2.0 at elevation 11' to I8' above floor elevation, and at stairs at grid dines M.2/7.4 to N.0/7.4 at elevation 10' to f.8'. Mickelson'rs: Section 4810: Contractor cleaned up area and removed scaffold. Contractor was to leave tents and heat an for 48 hours,. Heat and tents were removed in less than 24 hours. Double J covered CMU prisms with blankets in the afternoon. Bear Fabrication: Contractor continued to place and weld s#eann and condensate fines an the south side of building, The spacing for the steam and condensate lines are wrong. It is over 1 1l2' and is only supposed to be 4-"q COntractor will correc#.defi�n�y �anday. Jerome Bowen: Smt'ion 23D0: Contractor had to correct elevations in sham line trench south of the buildin fvCfearances tom pipe to subgrade.� Speeial inspector: ClaAon Maher Reviewed By: Bret McGowan Poo* BOX143 Rexburg, ID 83440 Da F 0 __ - lnnff-_� i I y ield Rer)ort �I+�� Inspector observations,a Special Double J Concrete: DI'-LLIun 5JUL) Uorruactar played 58 cubic yards of concrete into wars at grid Unes H . 0/1. 0 to H-0/2-2, H-0/1.0 to K.0/1.0 and K.0/1.0 to K-012.0 at elevation 11" to 18' above floor elevation, and at stairs at gr -id fines M.2/7.4 to N.0/7.4 at elevation 10-F to 18'. I performed concrete cvnt-o! testis and cast 2 sets of S tests cylinders. Contractor requested a 3 day compression test to confirm concrete strengths. Contractor wants to load wall early. The slump ars the first test is 7112-" and the air content is 5.00/a. The slump on the second test is 7" and the air content is 4.7%. Jerome Bowen: Section 2300: Contractor placed and compacted sand for under slabs at grid lines A.0/1.6 to A.0/3.0 through A.7/1.6 to A.7/3.0. Danco: Section 5310: Contractor continued to place and weld steel decking at gridlines K.0/4.0 to K.0/8.0 through M.0/4.0 to M.0/8.0 and M.0/4-0- to M.0/6.0 through N.0/4.0 to N.0/6.0. Special Inspector -8 Clavto aher Reviewed By: Brei McGowan P.O. Box,143 Rexburg, ID 83440 Daily Field Report � Z 1 -8 -71' � �-- E I jj -j -! i � I 9 . � I Double 1 Concrete: Page 2 of 2 Section 3300: Contractor placed 58 cubic yards of concrete into walls at grid lines H.0/1.0 to H.0/2.2, H.0/L0 to K.0/1.0 and K.0/1.a to K.0/2-.0 at elevation 11" to 18'above floor elevation, and at stairs at grid lines. M.2/7.4 to N,0/7A at elevation 10' to 18'. 1 performed concrete contra tests and cast 2 segs of 5 tests cylinders. Contractor requested a 3 day compression test to confirm concrete strengths. Contractor wants to load waft early. The slump on the first test is 71/2"' and the air content is 5.0%. The slump on the second test is 7r, and the air content is 4.7%.. Jerome Bowen: Section 2300: Contractor placed and compacted sand for under slabs at grid lines A.0/1.6 bD A.0/3.0 through A,.7/1.6 to A.7/3.0. Danco: Section 5310: Contractor welded Nelson studs to deck at gridlines -K.0/4.0 to K.0/8.0 through M.0/4.0 to M.0/8.0 and M.0/4.0 to M.0/6.0 through N.0/4.0 to N.0/6.0. Special Inspector: Clayton Maher Reviewed By: Bret M �Gov�ran i y P.O. Box143 Rexburg, ID 83440 Daily Field Re Special Inspector observations= ort Page 2 of 2 IV Double J Concrete: Section 3300: Contractor started preparing area in mechanical room for slab on grade at gird dines A.0/1.6 to A-0/3.0through A.7{1.6 to A.713.0. Jerome Bowen: Section 2300: Contractor placed and vibrated Gilsulate around seam and condensate lines on the youth side of the building. Dance: Sedion 5310: Contractor continued to weld Nelson studs to deck at gridlines K.0/4.0 to K.0/8.0 through M.0/4.0 to M.0/8.0 and M.0J4.0 to M.0/6.0 though K.0/4.0 to N-0/6.0. I performed visual weld inspect -ions on puddle webs an the deck and fillet welds on the ledger beams. All these rnreids appeared to meet AWS D 1. 1 specificaUions, I performed inspections on the Nelson Studs. 18 Nelson Studs were found to be deficient. I informed contractor of the deficient., studs. Special Inspector: Clavton Maher Reviewed By: Bret McGowan P.O. Box143 Rexburg, ID 83440 r" Lire lltm a. MW Special Inspector observations. Page 2 of 2 Double .] Concrete: Section 33D0: CoLntractor stated preparing area in mechanical room for slab on grade at gird lines A.0/L-6 to A.0/3.0 through A.7/1.6 to A.-7/3.0. Jerome Bowen: Section 230Q: Contractor played and vibrated Gi1sulate around sham and condensate [roes on the south side of the building. Danco: Section .5310,p Contractor installed ledger beams, decking and Nelson Studs at gridlines M.0/4.0 to M.0/7.4 through N.0/4.0 to N.0/7.4. Note: Contractor replaced deficient nelson Studs found on 11-12-a3. I performed inspections an the new studs. AIS study appeared to meet AIMS DIA specifications. Special Inspector: Clavton Maher ReV[ewed By: Bret McGowan Proiectm. Thames E. P.O. Box143 Rexburg, ID 83440 Daily Field Ricks Building Location: Rexburg.. ID Client: BYU Idaho Project No.: 03-0003 Equipment: Double .] concrete Work ForceftA Double J Concrete 91C Jacobseno's 1 Supervisor 3 Foremen 16 Laborers 1 Forema n 3 Welders 2 Laborers 1 Supervisor Page 1 of 1 Report Date: 11J19/03 Weather: Partly Cloudy/Windy Temperature: F4I: 54° LO: 30° Day of the Week: Wednesday Special Inspector observations: Contractor hours; Double J Concrete Jacobsen"s Danco 9.D Hours 9.D Hours 9.0 Hours 9.a Hours 7.5 Hours 7.5 Hou rs 7.5 Hours 10.0 Hours 7:30 am to 5:00 pm 7:00 am to 5:30 pm 7:00 am to 5:30 pm Double J Concrete: Section 3300: Contractor continued preparing walls at grid line A.7/2.2 to C-.0/2.2. Section 3300.',, Contractor placed 31 cubic yards of concrete for slab on grade at ridlines A.0/1.6 to A.0/3.0 through A.7/1.6 to A.7/3.0. Danco: Section 5310: I performed visual inspection on puddle welds .at gridlines M -0/4,,O to M=0/7.m4 through N.0/4.0 to N.0/7.4. All puddle welds appeared to meet specifications as per AWS D.1.1. I performed an inspection on Nelson Studs at gn*dl,ines M.0/4.0 tD M-.0/7.4 through N.0/4.0 tD N.0/7.4. There were (7). deficient studs. Contractor will correct deficiencies. Now-* Note: A Doubie J employee fell 16 feet off of second floor deck, today. Jacobsens suggested that all slab penetrations need to have handrails and not just covered. Special inspector: Clavton-Maher Reviewed By: Brei McGowan P.O. Box143 Rexburg, ID 83440 Daily Field Report Project: Thomas E. Ricks Building Date: 11/24/03 Location: Rexburg,, ID Client: BYU Idaho Project No.: 03-0003 Equipment#: Double J Concrete Work Force: Double ] Concrete Dano Jacobsen"s Page 1 of 1 Weather: Overcast Temperature: HI -.m 31° LOQ: 13° Day of the Weeks. Monday 1 New Holland LS 180 Bobcat 1 Supervisor 3 Foremen 16 Laborers I Foreman 3 Welders 2 Laborers Y Supervisor Special Inspec,#or Observations: Contractor hours: Double 3 Concrete Jacobsen"s Danco 9.0 Hours 9.D Hours 9.D Hours 9. a Hours 7.5 Hours i.5 Hours 7.5 Hours 10.0 Hours 7:30 am to 5r.00 pm 7:00 am to 5:30 pm 7:00 am to 5:30 pm Double J Concrete: Section 330D: Contractor continued preparing walls at grid dine A.712,2 to C-0/2.2 and at elevator shaft at K.6/3.7, Danco: Sedion 5310: Contractor continued fabricaUng walk frames for first floor walks. Contractor placed steel Beams at gridlines M.0/1.0 to M.-0/4.0 through P-011.0 to P-0/4.0, Nate; Contractor corrected deficient studs found on 11-20-034, Weld inspections were performed an corrected Nelson Studs as per AWS DJA, ;U Special Inspector: Clayton Maher Reviewed By. Brei McGowan P.O. Box143 Rexburg, ID 83440 vaily Field Report Project: Thomas E. Ricks Building Dates. 11/25/03 Location: Rexburg,, ID Weather: Overcast Client: BYU Idaho Temperature: HI: 27° LO*- 10° Project No.: 03-0003 Day of the Week: Tuesday Equipment: Double I Concrete Work Force; Double 3 Concrete Dance Jacobsen"s 1 New Holland LS 180 Bobcat 1 Supervisor 3 Foremen 16 Laborers 1 Foreman 31Nelders 2 Laborers I Supervisor Spedal,ln�-WOPector observations: Contractor hours: Double J Concrete Jacobsen's Danco 9.0 Hours 9.D Hours 5.a Hours 9.Q Hours 7.5 Hours 7.5 Hours 7.5 Hours 10.0 Hours 7:30 am to 5:0-0 pm 7:00 am to 5:30 pm 7,.,00 am to 5:30 pm Double J Concrete: Section 3300,*, Contractor continued preparing walls at grid line A.7/Z.2 to C.0/2.2 and at elevator shaft atK.f/3.7, Section 3300m. Contractor placed 31 cubic yards of light weight concrete for slab on deck at grid lines M.0/4.0 to M.0/7.0 through N.0/4.0 to N.0/7.0. Danrn: Section 5310: Contractor continued fabricating wall frames for First floor walls. Contractor placed steel Decking at gridlines M.0/1.0 to M,0/4.0 through P.0/1.0 to P.0/4o,&, Spedal Inspector; Gayton Maher .- Revriew�d By: Bret McGowan P.O. Box143 Rexburg, JD 83440 Daily Field Project: Thomas E. Ricks Building Location: Rexburg, ID Client: BYU Idaho Project No.: 03-0003 Equipment, Doable J Concrete Work Forte: Double J Concrete Banco jacobsen's Report Date: 11/26/03 Weathers, Overcast Temperature: HI: 29° LO: 19° Day of the Week: Wednesday 1 New Holland LS 180 Bobcat 1 Supervisor 3 Foremen 16 Laborers i Foreman 3Welders 2 Laborers IS Supervi Special inspector observations: Contractor hours,,, Double .I Concrete Jacobsen"'s Banco 9,0 Hours 9.a Hours 9.0 Hours 9.0 Hours 7.5 Hours 7.5 Hours 7.5 Hours 10.0 Hours 7:30 am to 5:00 pm 7:00 am to 5:30 pm 7:00 am to 5:30 pm Double 3 Concrete: Section 3300: Contractor continued placed 35 cubic yards of concrete into walls at grid line A.7/2.2 to C.0/2.2 and at elevator shaft at K.6/3,7. Concrete �on�ro� tests were performed and One set of fur concrete test cylinders were east. The slump is 5" a€�d the air co�ten� irs 4.0°/0. Danco: Section 5310: Contractor continued fabricating wall frames for first floor wads. Contractor continued to place steel Decking at gridli"nes M.0/1.0 to M.0/4.0 through P.0/1.0 to P.0/4.0. Speciall Inspector: C]aAo-n Maier RevW1LAwv,urd By: Bret McGowan Dail Spedal YE75peCtQw- observations: P.O. x143 Rexburg, ID 83440 Page 2 of 2 Double I Concrete: Section 3300: Contradnr set forms and placed imbeds on walls at grid line A.712-2 to C.0/2.Z. Contractor set forms for Mechanical pad at gridline B4O/2.2 to B.0/3.0 through C-0/2.2 to C.0/3.0. Dance: Section 5310: Contractor continued fabricating wall frames for first floor walls. I performed visual weld inspections on ledger beams and Nelson Studs at gridlines M.0/1.0 to M.0/4,0 through R-0/1,0 to P-0/4.0.1 16 Nelson Studs were found to; be deficient, Jerome Bowen: Section X53(3: Contractor continued to backfill and compact trench line at approximately 125" North of Southwest comer of Parking Lot to approximately 2251 North of Southwest corner of Paring lot. Note: Section 5310: Contractor corrected deficient studs dismvered during weld ins io I performed an inspection on the corrected Studs. All welds appeared to -meet minimum specifications as per AWS D. I - 1. Spedal Inspector: 051vton Mahe A Reviewed Bye. Bret McGowan FIELD OCc�FP\igTin�i PFPOPT BYU IDAhO REXBURG, DANO DAI-E.- P KOJ ff CT: F'KOJ ff- CT �. I N PR G PL T-�ip,- iS SUGG'L---STEDACTION 5- FE A!X.- �// atil-e OBSERVATION #.' e::5-6� JFkl -7 X .P -12 � �• �i k' P r yYf i�a J' Y �3 c UDG� I AND 501--1Lff C�IANGE,5.- D A CRIGNr I CR Al T DATE: nz- P.O. BOX143 Rexburg, ID 83440 1i D aily Field Report Special Inspector observations,, Double J Concrete: Section 3300: Contractor used a power trowel to finish concrete placed on 1 -Q? -tom. Contractor continued to clean up debris on the first fluor, Section 5310: Contractor placed and welded steel for stairs around elevator shaft at gridlines K-0/3.3 to K.0/4.0 through L.0/3-3 to L.0/4.0. I performed visual weld inspections on welds for ledger beams and steel joists at gridlines H.0/2.0 to H.0/3."ll dr 0 through P,-0/2.0 to P.0/3.0 and the stairs at K.0/3.3 to K.0/4.0 through L.0/3.3 to L.0/4.0,, All welds appeared tO meet AWS D 1. 1. I informed Dan, of Danco, that there are some bolts with rust on them in connections on the beams to columns on the second floor at gridlines H.0/2.0 to K-0/2.0 that need to be removed. Contractor started placing steel deck at gridlines K.0/4.0 to K.0/8.0 through M.0/4.0 to M.0/8.0 for second floor roof. Special Inspector: Clavton Maher Revhewa,ed By. Beet MC -Gowan P.O. Box143 Rexburg, ID 83440 DAll. - aily Field Special Inspector observations: Double 7 Concrete: _.._.. Page 2 of 2 �..�.�., JJVV• ��,ua�.L�,l N:dE;�u �1 euoIc yaras of concrete into stem walls at gridline L-0/2., c� I .f� 3.0 L.DJ3.0 to K.0/3.0 -and N�.0/7.a to N.Q/7.(�, Elevation approximately15' to 30' fc�ating. A concrete control test and one sit of four concrete test cylinders were cask. The�eis 8"and thy; air cantentis 4.7Ar'o, Contractor paced 3D euh� yards of �i ht w+�i ht con slump second floor slab on deck at rid lines N.� � � ���� for /'0 �� sec c� j8.0 tv N.oj7.4 through M.Oj8.� t� M.0/7.4, .0/4.0 to � M.0/4.0 through L.0/3.0 to M,,0/3,.O and ].0/3.3 to 3.0/3.0 through 3.0/3.0 to 3.x/3.3. Discharge times were around 90 minutes due to weather and conditions at the site. Concrete temperatures were low due to the time it took to discharge from the tucks, The contractor and Walt ers Concrete were notified. Concrete temper-atures were between 48 and 50 degrees. The specifications allow for 50 - 80 degrees so the concrete was allowed to be placed. Contractor allowed standing water on slabs on deck. until after placement., then doweled off the wafter and cowered late-. Danco: Section 5310: Contractor continued to weld ledger beams and steeljoists at gndlines H.0/2.0 to H.0(3.0 through P.0/2.0 to P,40/3.0* Contractor continued placing steel deck at gridlines H.0/2.0 to H.0/3.0 through P.0/2.0 to P.0/3.0. Special Inspectar: Clavton Maher Reviewed By: Bret McGowan Dail Special Inspector obsenratinns: P.O. BOX143 Rexburg, ID 83440 Page 2 of 2 Double ] Concrete: SectiOn 330Q: contractor continued to place reinforcement steel for skein yvalls a� gridline L0/2-0/7.0. ..5 to L.Q/3.0, L.QJ3.0 to 1.0/3.0 and M.0/7.0 tv N��evation approximately 15` to 30' above footing. I performed a visual inspection on reinforcement steel at 0/0 go/ a L.0/3.0 to K.0/3.0 and M.017.0 to NmO/7.0. Reinforcement steel met project plans and specifications. Danco: Section 5310: Contractor started to weld ledger beams and steel joists at gridlines H.0/2.0 to H.0/3.0 through P.0/2.0 to P.0/3.0. Contractor started placing steel deck at gridlines H.0/2.0 to H.0/3.0 through P,0/2.0 to P.0/3.0. Special Inspector: Reviewed By: awton Maher Bret McGowan Dail #IT - ! L. 3 ■ 'I em P.O. x Rexburg, ID 83 0 Page 2 of 2 Double J Concrete: Section 3300: Contractor continued to place reinforcement steel for stem wa11s at gridline L-0/2.5 to L.0/3.0, L.0/3.0 to K.0/3.0 and K.0/7.0 to N.0/7.U. Elevation approximately 15` to 30' above footing. Section 5310: Contractor started to place beams for second floor roof at gridlines H1.0/2.0 to H.0/3.0 through P.0/2.0 to P.0/3.0. I PerfOrMed visual weld inspection on puddle welds and welded Nelson Studs on second floor steel decking at grid lines H.0/1.0 to H.0/3.0 through K.0/1.0 to K.0/3.0. Notem 8 Nelson Studs were found to be defic"'[ent. The contractor replaced the deficient studs and I performed another visual inspection on the replaced muds. AIS weld appeared to meet AWS D 1. 1 specifications. Spedal Inspector: Clayton Maher Reviewed By: Bret McGowan Dail Special Inspector observations: Double I Concrete: P.O. B Rexburg, I Page 2 of 2 Section 33a0: Contractor placed 4 cubic yards of ovncrete for footings at the West half of Mechanical Room on the West side of the building. Contractor placed 30 cubic yards of concrete for tunnel roof from Mechanical Room to rid p,7'WaSn't iof concrete placement until time of Placement Double J was info if they didn't notify again at they will be removing concrete and wont be allowed to bid another BYU projW. Danco: Section 5310: Contractor continued fabricating wall frames for first floor walls. Contractor Started puddle welds and welding Nelson Studs on steel decking at grid lines H.0/1.0 to H.0/3.0 through K.0/1.0 to K.0/3.0. Contractor continued placing Second Floor Columns from gridlines M.0/2.0 to M.0/4.0 through P.0/2.0 to P.0/4.0. Spedal Inspector. Clavton„ Maher Revi..By:WBret M!gjowan P.O. BoA43 Rexburg, ID 8.3440 Daily Field Report Special Inspector observativns; Page 2 of 2 Double 3 Concrete: Seffion 3300: Contractor placed ZZ cubic yards of concrete for footings at the West hail of Mechanical Room on the West side of the building. i was informed that contractor was going to place fess than 10 cubic yards of concrete and finish the footings later in the week so concrete control tests were not perfo ed. After the placement I was informed that 22 cubic yards were actually placed. Contractor placed 30 Cubic yards of light weight concrete for slab on deck at grid lines R.0/1.0 to H.0/3,0 through K.011.0 to K.0/3.0 and M-0/1-0 to M.0/2.0 through P.0/1.0 to P.0/2.0. Dancoo. Section 5310: Contractor continued fabricating wall frames for first floor walls. Contractor Started puddle welds and welding Nelson Studs on steel decking at grid lines H--0/1.0 tO H-.0/3.0 through K.0/1.0 to K.0/3.13.. Contractor continued placing Second Floor Columns from gridlines M.4/2.0 to M.0/4.0 through P.0/2.0 to P.0/4.0. jerome Bowen: Section 2300: Contractor backfilled along stem wall along A.712.2to C.0/2-2,' Spedal Inspectorom 1 Maher Revi BY gg� Dpi Spedal Inspector vbsenrativnsc P.O. Box143 Rexburg, ID 83440 IZ Page 2 of 2 Double I Concrete: Sedion 33€]a: Contracbor continued to place reinforcement steel for footings for Mechanical Endosune at West end of Building,, Section 5310: Contractor continued fabricating wall frames for first floor walls. Contractor placed steed decking at grid lines H,,0/1.0 to H.0/3.0 through K.0/1.0 to K.0/3.0. I performed visual weld inspections on fillet welds for X bracing and wall frames west of the Match Line. All welds appeared bDexceed specifications as per AWS D.1.1. Jerome Bowen. Section 2630: Contractor excavated for Transfb er Pais on the Southeast corner of Building. SPelial InsPector. Clavton Marher ReVieWed By: Bret McGowan P.O.. Box143 Rexburg, ID 83440 Daily Field Resort Double 3 Concrete. Page 2 of 2 Section 3300: Contractor placed 52 cubic yards of light weight -concrete for slab on deck at gridlines M.0/2.0 to M.0/4.0 through P.0/2.0 P.0/4.0_ Contractor placed 25 cubic yards of concrete into wails at gridlines G.0/3.0 to G..0/4.S and G.0/4-.5 to K.0/4.5 at elevation 12' to 20'. Concrete control tests were performed and onc e set o� four test ycast The were caThe slump is 8.0"' and the air content is. 5.0%. Danco: Section 5310: Contractor continued fabricating wail frames for first floor wails. Contractor placed steel beams at grid lines H.0/1.0 to H.0/3.0 through K.0/1.0 to K.0/3.0. Jerome Ekywen: Section 2630: Contractor excavated sto li"ne trench and placed storm pipe from approximately 225 ' No of Southwest comer of Parking a ipro"ItaL "Y o of Southwest comer o Parking fot. Conh-ador placed and cnmpacted backfill into trench. Iteview►ec1 may: Bret McGowan P.O. Box143 %..exburg, ID 83 0 Page 1 of 1 Daily Field Report Project: Thomas E. Ricks Building Date: 5/29/03 Location: Rexburg., ID Weather. Clear/Breezyclient: BYU Idaho Temperature: 89° HI: 54° LO Project No.: 03-0003 Day of the Week: Thursday Equipment: Jerome Bowen 1 Hitachi Zaxis 20OLC 5.0 Hours 1 Cat 60A Smooth Drum Vibratory Roller 5.0 Hours 2 Mechanical Hand Compactors 5.0 Hours Superior Blasting 1 Ingersoll Rand LM 500C 12.0 Hours 'Mork Farce: Jerome Bowen I Supervisor 5.0 Hours I Operator 5.Q Hours 3 Laborers 5.D Hours Superior Blasting i Driller 1Z. 0 Hours .1W apeciai Anspectnr obsetvatiLons: Contractor fours; Jerome Bowen* 12:30 pm to 54,30 pm Superior Blasbrig.- 6:00 am to 6:00 pm Jerome Bowen: Section 230D.3. 15: Filled and compacted test fit at grid M,4 'to P. line 6 to 7. 8. Compaction tests were perfiormed and recorded. Because of oversize material in the pit --run material being used, a relative density curve is necessary to determine the pe -rcentarjel of compaction. A� this time al! areas testedwere PrOof-rolled and results documented. obtained a sample of pit -run material from area being filled and sent to Boise for testing. Superior Blasting: Section 2300.3,3: Drilled 62 byre hales on utility trenches from sta. 1f+25 to 12+50. Spedal Inspects-; Clavton Maher Reviewed By: Bret McGowan Project: Thomas E. Lacation: Rexburg, Client: BYU Idaho P.O.. Box143 -urg, ID 83440 -Aexb D aily Field Report Ricks Building Date: 5/30/03 ID Weather: Clear Temperature,,., 8811 HI: 51° LO Day of the Week: Friday Project No.: 03-00.03 Equipment. Jerome Bowen Work Force.8 Jerome Bowen Page 1 of 1 1 Hitachi Zaxis 20OLC 1 Cat 60xt Smooth Drum Vibratory Roller 2 Mechanical Hand Compactors 1 Supervisor 1 Operator 3 Laborers special InspeCtor observations: Contractor hours; 7:Q0 am to 11:00 arty 4.0 Hours 4.0 Hours 4.0 Hours 4.0 Hours 4.0 Hours 4.D Hours Section 230D.3.15; Filled and Compacted fest pit at grid M.4 to P, line G to 7.$, Compaction tests were Performed and recorded. At this time all areas tested were proof -rolled and results documented. Special Inspector: CbAon Maher Reviewed By: Bret McGowan P.O. BOX143 Rexburg, I D 83440 Daily Field Report Project: Thomas E. Ricks Building Location: Rexburg, ID Client: BYU Idaho Project No.: 03-0003 Equipment: Superior Basting Work force: SUrperior Blasting Jerome Bowen Page 1 of 1 Dates. 6/3/03 Weather: Partly Cloudy Temperature: 741) HI.- 38° LO Day of the Week: Tuesday 1 Ingersoll Rand LM 500C 10.5 Hour 1 Hitachi 20OLC track hoe 2.0 Hours 2 End Dump Trucks 2.0 Hours 1 Operator 10,5 Hours 1 Laborer 10_S Hours 1 Supervisor 2.0 Hours 10 pe rator Z.0 Hours Z Drivers 2. 0 Hou rs Special Inspector observations: Contractor hours; Superior Blasting Jerome 8owen Superior Blasting: Section 2300.3.3: Drilled 14 bore h sta.12+50. 6:00 am to 5:00 Prn 3:30 pm to 5:30 pm ales for 811 waterline for fire hydrant at approximately Jerome Bowen: Section 23D0.3.5: Started excavating footing trench for Thomas E. Ricks Bldg., at fired P, Zine i. Contractor excavated to top of bedrock, At,grid M, Zine i., contractor excavated to approximately 8' below existing grade without finding bedrock. Spedal inspector0 . Ckyton Maher Reviewed By: Brei McGowan Da'11 P.O. Box143 Rexburg, ID 834401 1 1 1 Superior Blasting.,0 Section 2300.3.3: Drilled 37 exploratory holes for footing trench.. See the results below. Grid line P-1; 0-'�-T rockf 51�-6.5'Fcinders, &Y-9" rock, W-10? cinders., 101+ rock. Gn*d line N-1; W-1 rock. Grid line M.-1; of -101 rte* Grid line M.4-1; Tcinders 6`401 rock. Grid line M-3-1- "10$r rock, Grid fine M.2-1; W-3 50''cinders., rock. Grid line M.1-1; 0.6' cinders, 61�9` rock. T -10-f rock, Grid line M-1.2; 0-'�4' rock 4'-10" rock. Gtid line M-11.8; 0.2" rock, i d Y-6-rockir cinders .i i N 'r VnU IenC PI -L, v -u- angers, W-10' rock. r:�� r.,o i ate. �, " ---. „ .,, -- , Page 2 of 3 - r� � � rs- " rock f iriders, � r�8-V cinders, rte, � F , , -' Grid line L.5-2; 0�-T rock, T,6'r cinders, 6�-T rock, T -9f cinders, 91 '.101 rock., Grid line K,8-2; 0,31 rock., 3-'-4F cinders, 41-5.r rock, 5'-6" cinders, rock rock% Grid IK.1-2; W- { rock 5�-T cinders,Grid l K-.; W-6 roc1-T ,frytiers, 71.8" rock,, -Y cinders T-101 TGrid line K-1,8; - rock, T-9" cinders,* 101 rock. ' Grid line K-1.3; 01-8'r rOC8�4' cinders, Grid line K-1; W-10"rock. Grid line J.6-1; W -9-F rock T,101 cinders, Grid line 1 -1; W-8 ,, 8r 101 d rs Grid line J 01 -jar rock; Grid line H,,- .; #-" rOCT-10" f ndem, Grid fline H-0)-�rock,rock-. Grid line ,-1; }vff rock8f-10` cinders. rn Grid line H-1; 0.7' rockTAW cinders, 10"+ rock, Grid line H-1.1; OF;7r rock, cinders, Grid fine H-1-8; 0.5-' rock 51;9` cinders,. T-10" mc. Grid line H-2; 0"T rock., 7"� , -r cinder - - 10' cinders. Grid line H-2.5;'r-1'roc � ��tiers, -1 mak}.FGrid ne H-3; 0'-S" rock, 5'f�&f cinders, 61-T rock, 71-fY cinders,, W40" rock. rias .; rock X756.5'-10" D Speciia# inspector: Clavton Maher Revriewed By: Bret EhtGvwan Da il P.O. Box143 jxexburg,, ID 83440 �a Page 3 of 3 5uperrvr Busking: Drilled 37 exploratory holes for footing trench. See continued results below, Grid line H-3.7; D'-5' rock, 5'-6' cinders, 5'-10' rock. Grid line H-4; 0`005" rock, 5'4' cinders, 7'-10' rick. grid dine H-4,3; (3'-3' rock, 3'-4' cinders, 4'-8' pock, $'-3' enders, Grid line H-4.5; D'-5` rock, 5'-6' cinders, 6'40#r rack. Grid line H-4.7; 0'-6' rock, 6'7' cinders, T-10" rank, Grid line H-5; W-5.5' rock, 5.5'�-6'dndersf 5'-10' rodc. 9'-10' rock. Special Inspextor. Clavton Maher Reviewed,113y: Bret McGowa n Daily Field Report Special inspector observations: Contractor hours, Superior Blasting 6:00amto6:00- pm Jerome Bowen 7:40 pm to 5:30 pm Jerome Gowen: Section 2300-3.15: In place field density test by nuclear method were performed. All tests mei or exCeeded project specifications. Section 2300.3.5: Contractor removed structural fill pit run material from test pit located at gridline M.4 to P, 6 -to 7.8 as recommended by AMEC., Superior Blasting; Section 2300,14: Contractor continued to drill bore holes as per project specifications. Special InspectorIt : ClaYton Maher ReviewBy. Brei McGowan Project: Thomas F. Ricks Location: Rexburg, ID Cl"Ient:: BYU Idaho Praject No.: 03-0003 Equipment; Jerome Bowen Work Force. Jerome Bowen Page 1 of 1 Daily Field Report Building Date: 6/12/03 Weather: Clear Temperature: 771) HI: 43° LO Day of the Weeks. Thursday 2 Hitachi 2-OOLC Track Hoes 2 End Dump Trucks 1 Volvo Loader 1 Foreman 6 Laborers 10.0 Hours 10.0 Hours 10.0 Hours 1Q.0 Hours 10.0 Hours Double J Concrete 1 Supervisor 10.0 Hours i foreman 10.,'0 Hours .oft_ _ _ � Laborers _ i o_n Hni Err, bpeciat inspector observations: Co ntractor hours; Jerome Bowen 7-.00 am to 5:3D pm Doubly I Concrete 7:00 am to 3:00 pm Jerome Bowenir Item 330E}.3.2: Contractor continued to clean off bedrock under footings. Doubly J Concrete: stern 3300.3.4: Contractor Finished prepping Panting area, item 3300.3,10s. Contractor placed 22 cubic yards of dean mix concrete at gridlines H-1 to H-2 and at M-1. Concrete eontrol tests were nod performed Note: The wrong Benchmark was used to determine elevations. After correcting elevations, approximately 11 cubic yards of concrete was removed from gridline H--1 to Hwy. Special Inspector: Reviewed By: Clavton Maher Bret McGowan P.O. Box143 Rexburg, ID 83440 Daily Field Report 5pecrai Inspector observations: Page 2 of 2 0% Idem 330D.3.4: Contractor sit elevations and prepped foaling meas at gridlines D-4.5 to K-4.5., K-4.5 to K-6.8, H-3 to H-4.5, R-1 to P-3, N-3 to M-5� M.43 to N-3 and M-1 to P-1. Note: At M-1.5, Bowen construction excavated footing down to elevation and didn't find bedrock. They over excavated approximately 20 feet and stopped. A meeting was scheduled with Project Engineers and AMEC to decide how to stabilize this area. Special Inspector: Oavton Maher Reviliv.-Wwed sy..Bret McGowan P 41F *JIL 5.0 P.O. Box143 Rexburg, ID 83440 Daily Field Report Project: Thomas E. Ricks Building Date: 6/18/03 Location: Rexburg, ID wParE..ws omM., rl,..,A., Page 1 of 1 Client,: BYU Idaho 0 � �"'r """'r Project No.: 03-0003 Tempiwature: 870 HI: 5111 LO Day of the Week: Wednesday Equipment. Jerome Bowen Werk Farce: Double J Concrete Jerome Bowen 3acobsen"s I Hftachi 20OLC Track Hoe 1Q.0 Hours i. Hitachi 20OLC Hoe Ram 10.0 Hours 2- end Dump Trucks 10,p Hours I Volvo Loader 10-.0 Hours 1 Supervisor 11.0 Hours I Foreman 11.0 Tours 7 Laborers 11.0 fours 1 Foreman 10.0 Hours 3 operators 10.0 Hours Z Drive, rs 10.0 Hours 7 Laborers 10.0 Hours 1 Supervisor 11.0 Hours 1 Foreman ].1.0 Hours Z Laborers 11.0 Hours Spedal llnq)ecbDr observations: Contractor hours.; Double i Concrete 6:00 am to 5:3p pm Jerome Bowen 7:00 am to 5:30 pm JacobseWs 6:0U am to 5.30 pm Jerome Bowen: Section 2300.3.5: Contractor continued removing excess material from building site. Section 33003,2: Contractor cvnfinued cleaningareas under footings. Double I Concrete: Section 3300.3.10; CvntracLvr placed 99 cubic yards of lean mix concrete at gridlines D-4.5 to K - 4.5r K-4.5 to K-6.8,, H-3 to H-4.5., P-1 to P-31 N-3 to N-5, M.4-3 to N-3 and M-1 top -1-0 Special inspectcw: Clavton Maher Reviewed By; Bret McQowan P-0- Box143 Rexburg, ID 8344-1. Daily Field Report Protect: Thomas E. Ricks Building Date: 6/19/03 LOCBt10n: RaYhnm ih 7' "' weather. Partiv C'Inuriv Client: BYU Idaho Project No.: 03-0003 Equipment; Jerome Bowen WorkForc Doable J Concrete Jerome Bowen Jacobsen's Page 1 of 1 Tem perature; 87 ° HI: 53° LO Day of the Week: Thursday 1 Hitachi200LC Track Hoe 1 Hitachi 20OLC floe Ram 2 End Dump Trud(s Z Volvo Loader 1 Supervisor 1 Foreman 5 Laborers 1 Forema n 3 Operators 2 Drivers 3 Laborers 1 Supervisor 1 Foreman 2 LLQ borers 10.0 Hours 10.Q Hours 10.0 Hours 10,.0 Hours 1a,5 Hours 10.5 Hours IO.S Hours 10.f% 0 Hours 10.0 Hours 10.0 Hours 10.0 Hours X0.5 Hours 1D. 5 Hours i 1 E r. Whl iYC atpmiai � v...r a �vu3 J r observations: Contractor hours; Jerome Bow�r� 7:0� am to 5:30 pm Double J Concrete 7.40 am to 5;3p prn Jacobsen"s 5:3U am to 5;30 pm Jerome Bowen; Section .2300: Contractor continued tO remove excess material from building site. Section 2260: Contractor continued deaning and excavating footin areas. Double I Concrete: Section 330D.3.10: Contractor placed 17 cubic yards of dean mix concrete at gridline 8-4.5 to D- 4.5. Nate: Contractor had to remove lean concrete from gridfines P -i and P-1..5 due �a ������t��g elevations wrong. SSpecial Inspector; Reuriewed By: Clavton Daher Bret McGowan P.O. Box143 Rexburg, ID 83440 Daily Field. Report Project: Thomas E. Ricks Building natps ai-)nim location: Rexburg, ID Client: BYU Idaho Project No.: 03-0003 Equipment: Demme Sowers Work Force: Jerome Bowen Double J Concrete Jacobsen`s Page 1 of 1 Weather: Partly Cloudy Temperature: 71° HI: 53° LO MY Of Me�Neek: Friday 1 Hitachi 20OLC Track Hoe i Hitachi 20OLC Hoe Ram 2 End Dump Trucks I'Volvo Loader 1 Water Truck 1 Foreman 3 operators 3 Drivers 1 Supervisor 1 Foreman 7 Laborers 1 Supervisor 1 Foreman 4 Laborers X0,0 Houma 10.0 Hours x.0.0 Hours 10.0 Hours 1(].Q Hours i0.0 Hours 10.0 Hours 10.0 Hours 1D. 0 Hou rs 10.0 Hours 10.0 Hours 7.0 Hours 7.o Hours 7 !1 Jnr rrc '5PeUal Inspector observations: contractor hours: Jerome Bowen' 7q-00 am to 5.30 pm Double J Concrete 7.-00 am to 5.30 pm Jacobsen"s 630 am to 1.3Q pm Jerome Bowen: Section 23003-5: Contractor continued to remove excess material from b i ing site. Section 2300.3.5: Contractor continued excavating footing areas. Double I Concrete: Item 3300.3.10: Contractor paced 44 cubic yards of dean mix concrete at gridline K-1,5 to M-1.5 HH -1 toK-�., HH -1 to H-2 and at M -1.5.I Spea� InspectormaiClavton Maher Revi�W�By: Bret McGDW3f1 P.O. Box143 Dal"ly Field Re ort Special Inspector Observations. Double J Concrete: Item 3300-3.3: Contrador staked out gridlines and elevations for footings. Superior Blasting: Page 2 of 2 Contractor drilled bore holes., 8 food on center per project plans and specifications. , at gridlines D-4.5 to K-4.5 and M--3 to H-4.5, as Mate: According to plans and specifications., bore holes were to be spaced at 4 feel on center. See change aider for recommendations approved by Leon Tanner vn G-2-3-03, Y Special inspector: Clavton Maher Revi%.-&MWwed Bye. Brei McGowan P.O. Box143 Rexburg, ID 83440 D aily Field Report Special Inspector observations: Jerome Bowen: Section 330U.3.2: Contractor continued deaning under footing areas. Section 2300.3.5: Contractor continued excavating fooling areas. Double J ConcreteL Item 3300: Contractor placed it cubic yards of lean mix concrete at grid to G-4.5, H-4 to G-4, K-4.5 to K-6.8,, N-3 to N-6, M.43 to n-3, P-1 to P-3, M-1.5. Page 2 of 2 1r.0 lines 6-4.5 to K-4.5, G-3 M-1 to P-1 and M-1 to Superior Blasting: Contractor cvnUnued to drill bore holes., S font ars center, at gridlines D-4,5 to K-4.5 and H-3 to H-4.5, as per project plans and specifications, War Bennet: Contractor placed dint bank for eleiftrical service under footings. Duct bank was to high in elevation and was removed and Bowen Construction excavated the area to a lower eieVation. Spedal Inspector. Clayton Maher Reviewed By: Brit McGowan P.O. BOX143 Daily Field Report W - - Nwauai inspector observations: Jerome Bowen: Section 3.300-3.2: Contractor continued cleaning under footing areas. Section 2300-15: Contractor continued excavating footing areas. Page 2 of 2 Ltf Double J Concrete: Item 3300.3.10: Contractor placed 12 1/2 cubic yards of grout at grid tines B-4..5 to K-4.5, G-3 to G-4.5, H-4 to G-4, K-4.5 to K-6.8, N-3 to N-6, M.4-3 to n-3. P-1 to P-3, M-1 to P-1 and M-1 to M- 1.5. Superior Blasting: Contractor continued to drill bore holes, g foot on center. Special Inspector: Clavton Maher Revil...ed BY. Bret McGowan P.O. Box143 Rexburg, ID 83440 Daily Field Report Project: Thomas E. Ricks Building Date: 6/26/03 Location: Rexburg, ID Weather: Partly Cloudy Client: BYU Idaho Temperatureo. 74° HI: 40° LO Project No.: 03-0003 Day of the Week: Thursday Equipment: Jerome Bowen Woric ForcE'.`. Jerome Bowen Double I Concrete Jacobsen's 1 Hitachi 20OLC Track Hoe 10.0 Hours 3 End Dump Trucks 10.0 Hours 1 Foreman 1a.0 Hours 1 operator 10.0 Hours 3 Drivers 10.0 Hours 3 Laborers 10.0 Hours 1 Supervisor 10.D Hours I Foreman 10.a Hours 7 Laborers 10.0 Hours 1 Supervisor 1o.5 Hours 1 Foreman 1U.5 Hours 2 Laborers x.0.5 Hours Special Inspector ohse-1 irva�ians: Contractor hours: Jerome Bowen Double J concrete Jacobsen's Jerome Bowen: Section 3300.3.Z: Contractor continued Meaning under footing areas., Section 2300,3.5: Contractor continued excavating footin areas. 7:00 am to 5:30 pm 7:00 am to 5:30 pm 6:30 am to 5:30 pm Double I Concrete: Idem 330D.3,10: Contractor placed 33 pubic yards of lean mix concrete at grid fines E.5-3.3 t0 0- 3.3 item 3300.3.3: Contractor set forms. Special. Inspector.It Clayton Maher RevilE-WWN W By: Bret McGowan P.O. BOX143 Rexburg, ID 83440 Daily Field Report Specam inspector observations: Page 2 of 2 Double 3 Concrete; Item 3300.3.1Q: Contractor placed 33 cubic yards of lean mix concrete at grid lines F--3 to F-3.3 E-3, D.5-3 and D-3. Concrete control tests were not performed, , Item 3300.3-3.. Contractor set forms and died reinforcing steel. War Gannet: Contractor rei�staflecl duct bank for electrical services at proper elevation. Spedal Inspectors. Clayton Maher Reviewed 11y: Bret -McGowan P.O. Box143 Rexburg, ID 83440 Fie,ld Re ort �-4 Double 3 Concrete: Section 3300-3.10.- Ccmtractor placed 32 cubic yards of concrete Into footings from grid D,,5- 4.7 to J -4J. Section 3300,..3- 1 8,- 1 Performed concrete control tests Test 1 Slump 2r' Air Cont. 4.5% on the firstand third loads,, Test 2 Slump 3 Air Cont. 5.2% Superior Blasting: Section 3300-.3.4: Contractor continued to drill bore holes for footings, 0 Speaal Inspector., Cla on Maher Reviewed By,., Bret McGowan P.O. Box143 Rexburg, ID 83440 Page 1 of I Daily Field Report Projects. Thomas E. Ricks BuildingDate: /03/03 Location: Rexburg, ID Weathers, Clear Clients. BYU Idaho Temperature: 830 HI: 450 LO Project No.: 03-0003 Equipment: Work Force.,M Double J Concrete 1 Supervisor 1 Foreman 15 Laborers 1 Supervisor 1 Foreman 2 Laborers Day of the Week: Thursday 7,0 Haus 7.0 Hours 7.0 Hours 7.0 Hours 7.0 Hours Special Inspector observations: Contractor hours: Double I Concrete 6:00 am to 1:00 PM Jacobsen's 6:00 am to 12:00 Pm Double 3 Concrete: Section 3300.3.10: Contractor placed 22 cubic yards of lean concrete mix at gridiines H-3 tv J05-3. Concrete control tests were not perfo ed. Special Inspector: Clayton Maher Reviewed By: Bret McGowan Dail Smcial Inspector observations: P.O. Box143 Rexburg, ID 83440 Field Report Supen"'or Blasting: Section 3300.3.4: Con ctor continued to drill bore holes for footings. Page 2 of 2 Section 3300.3.10: Contractor placed 16 cubic yards of groutin bare holes. Y performed concrete control tests and cast one set of cylinders, The stump is 9+ inches. Grant temperature is 7r. Air temperature is 74°. Grout placement is on grids. H-1 to H-4, H-1 to K-1, K-1 to K-2,.3.5-2 to K-21 J.5-2 to 3.5-3, H-3. to J.5-3, K-2 to M-20. K-4 to M_2-4 N-5 to N-6�K-8 to M-8. K-7 to K --S, D-3 to F-3, and spot footings at grids 1-2,, M-3, Ni.2-3 and N-3. Spatia! Inspector: ClaytQn Maher Reviewed Sym. Bret M �Gnw�n P.O. Box143 Rexburg, ID 83440 Daily Field Report Project: Thomas E. Ricks Building Date: 7/04/03 Location: Rexburg, ID Weather: Clear Client: BYU Idaho Project No.: 03-0003 equipment: Jerome Bowen Work Force.0 Jerome Bowen Double 3 Concrete Jacobsenj's Page 1 of 1 Temperature: 85° HI: 940 LO Day of the Week.z Wednesday 1 Hitachi ZaXirs 2001c Track Hoe 3 End Dump Trucks 1 Foreman 1 Operator 3 Drivers 1 Supervisor, I Foreman 12 Laborers 1 Supervisor I Foreman 10.0 Hours 10.0 Hours 10.0 Hours 10.0 Hours 10.0 Hours 9.Q Hours 9.Q Hours 9.0- Hours 11.5 Hours 11.5 Hours Special Inspector observations: Contractor hours: Jerome Bowen 7:00 am to 5:30 Pnn Double J Concrete 6:00 am to 4:30 pm Jacobsen"s 6:00 am to 5;30 pm Jerome Bowen: 23003,5&4Contractor continued to excavate for mechanica1 area. Double J Concrete: Section 33+D0.3. 10: Contractor placid 58 X14 eubic yards of concrete at grid fines B--4.7 to D-4.7 and K-4 to K-6,,8, I perfoni concrete controi tests and cast two sets of test cylinders. The stump on the first test is 23/4. The air content is 4.8%. The concrete temperature is 72°. And the air- temperature is G2°. The slump on the second test is 33/4. The air content is 4.10/o- The concrete temperature is 72°. And the air temperature is 68° - Special Inspector; Cha vn Maher Reviewed By. Brei McGowan Page 1 of 1 P.O. Box143 Rexburg, ID 83440 Project: Thomas E. Ricks Building Date: 7/10J03 Location: Rexburg, ID Weather:w Clear Client: BCU Idaho Temperature: 92° HI: 47° La Project No.. 03-0003 Day of the Week: Thursday equipment, Work Force: Double J Concrete 1 Supervisor I Foreman 12 Laborers I Supervisor 1 Foreman 9.0 Hour 9.0 Hours 9.0 Hours 11.5 Hours 11.5 Hours Special Inspec#vr observations: Contractor hours: Double.3 ConCrete 6:00 am to 4:3D pm ]acobsen's 6:00 am to 5:30 pm Double 3 Concrete; Section 3300-3.10: Contractor placed 44 cubic yards of dean mix cancreteat grid in A-1 t o A-4 through D-1 to D-4. Concrete control tests were not perfor ed. Sedion 330a.3.8: contractor set forms and tied steel reinforcement. Special Inspector: CiaAon Maher Reviluwwed BY': Bret McGowan P.O. Box143 Rexburg, ID 83440 Page. 1 of 1 Daily Field Report Project: Thomas E. Ricks Building Date: 7/11/03 Location; Rexburg, ID Weather; Clear Client: BYU Idaho Temperature: g2° HI: 49° LO Project No.: 03'0003 Day of the Week: Friday Equipment: Werk Force: Double J Concrete 1 Supervisor 9-0- Hours 1 Foreman 9-.0 Hours 12 Laborers 9,0 Hours Jacobsen"s 1 Supervisor 11.5 Hours 1 Foreman 11.5 Hours Special Inspector observations: Contractor hours: Double J Concre�t�e Jacobsents 6:00 am to, 5:30 pm 6:0p am to 5:30 pm Double 3 Concrete: Section 3300.3,10: Contractor placed 44314cubic yards of concrete at grid lines P-1 to N-4 and M- 1 to Pte. I performed concrete control tests and casts 2 sets of test coinders. The first test has a '7�� cit rnsrt 1i au• E iw, v ,a an wmern ano a iq- air temperature. The ambient temperature is 760. The second test has a 4" slump,, 4.8°!a air content and a 74° air tipmripr; t"r= T -h k:r�} temperature is 8a°. ... 'Lww U111 ■L Spedal Inspector• Clayton Maher Reviewed BVOLed McGowan Dail SpeCial Inspector observations: Double ] Concrete: P.O. Box143 Rexburg, ID 83440. Page 2 of 2 Section 33G03.8 -m. Contractor placed 443/4cubic yards of concrete at gridlines M.4-3.7., K-6 to K-8, K-8 to M-8 and N-4 to N--7.4. i performed 2 concrete control tests and pasts test cylinders. The slump on the first test -is V. The air content Ls2.0 fo. I Notffied Waiters Concrete and Jacobsens and informed them the air is out of specification. The second test the slump is 5 1/2'. The air content is 4.4%. 1 notified Walters and Jacobsens., Note: Because of the speed in which the concrete was placed., I wasn't able to reject the failed Leads. I informed Val (Jacobsens) that from now on concrete rant be placed whip Fm taking Control tests, I informed them that I will test the first truck and if it is in specification the Placement can commence, but If ROS then that truck `WIlI be I`eleCted and I will tptcfithe nP�c1- Truck before any concrete is placed in forms. Special Inspector: Clavton Maher Reviewed i3y: Bret McGowan P.O. Box143 Rexburg, ID 83440 Daily Field, Report Projects Thomas E. Ricks Building Date: 7/18/03 Page 1 of 1 ..M:auvn: nexourg, to Weather: Clear Client: BYU Idaho Temperature: 92° HI: 51(1 LO Project No.: 03-0003 Day of the Week: Friday Equipment: Jerome Bowen 1 Grader 10.0 Hours Work Farce: Jerome Bowen 1 Foreman 10.0 Hours s operators 10.0 Hours Double 3 Concrete 1 Super -visor 10.5 Hours 1 Foreman X0.5 Hours 13 Laborers 10.5 Hours Jacobsen -'s I Supervisor x.1.5 Hours 1 Foreman 11.5 Hours Special: Inspector observations: Contractor hours: Jerome Bawer Double J Concrete Jacobsen"s Jerome Bowen: 2300.3.20: Contractor Performed site grading in parking lot. Double J Concrete: 7:00 am to 5:30 pm 6:00 am by 4:00 pm 6:00 am to 5:30 pm Section 3300.3.10: Contractor placed 66 cubic yards of concrete at gridlines FE -1 to K-1, K-1 to K-2, H-1 to H-3 J.5-2 to K-2, ],5-2 to 1.5-3, H-3 to ].5-3 and G-3 to G-3.3. I perfoUFF a concrete Control test on the first load. The slump is 3 1/2ff. The air content is 5.5%. 1 didn't cast test cylinders. 1. performed cQntrol tests on the second and forth loads and east test cylinders. The second lead stump is 4" and the air content is 5.2%. The forth Toad slump IS 3 1h" and the air cnlitE'.nt is 4.2% Special Inspectoriff Clavton Maher Revi.0%mismed By: Bret McGowan D ail P.O. Box143 Rexburg, ID 83440 Field R,er)ort Page 2 of 2 Double J Concrete:oncrete..0 Section 3300.3.3-.. Contractor continued to set forms at grid lines D-.5-3., D,5-3.3, E-3, E-1-31 E.5- 3.3, F-3, L-3 and L-4,. Section 33D0.3.8: Contractor placed Steel reinforcement in footings. Section 3300,3.10: Contractor placed 35 yards of concrete at grid lines M-7,7, M-6-81 M-5.8, M- 4.5 and M-4. I perfoconcrete control tests on the first and second loads. I Cast bests cylinders. on both loads. First load the slump is 3 1/2" and the air content is5.5%. Second load the slump is 4 1/2" and the air content is 6.00%. the second test is 1/2" out of specifications and the load was accepted. Special Inspectorm. ClavtonMaher Reviewed By: Bret McGowan P.O. Box143 Rexburg, ID 83440 Daily Field Report Project: Thomas E. Ricks Building Dates. 7/25/03 Locations. Rexburg, ID Weather: Clear Client: BYU Idaho Project No..: 03-0003 Equipment0 ; Jerome Bowen Work Force. Jerome Bowen Double i Concrete Jacobsen's Superior Blasting 1 Grader 1 Bobcat 3 End Dump trucks I Foreman 1 Operator 2 Laborers 3 Drivers I Supervisor 1 Foreman 13 Laborers 1 Supervisor 1 Foreman 1 Driller 1 Laborer Temperature: 910 HI: 67° LO Day of the Week: Friday 10.0 Hours 10.0 Hours. 10,,0 Hours 10.0 Hours 10.0 Hours 10.0 Hours 10.0. Hours 5:30 10.0 Hours 10..0 Hours 10.0 Hours 11.5 Hours 11.5 Hours 10.0 Hvuirs 10,.0 Hours Special Inspector observations; Contractor hours: Jerome Bowen 7:00 am t0 5:3D pm Double J Concrete 7:00 am t0 5:30 pm Jacobsen"s 6:t]0 am to 5:30 pm Superior Blasting 6:p0 am t0 5:30 pm Jerome Bowen 2300.3.20: Contractor placed gravel in parking lot Superior Blasting: SecUon 3300.3.10: Contractor placed 10 cubic yards of grout into bore holes dor footings, T cast one set of 6 test cylinders. Rebar was placed in designated fore hales. Special Inspector: QpAon Maher Reviewed By: Bret McGowan Dail Doubly J Concrete: P.O. Box143 Rexburg, ID 83440 Page 2 of 2 Section 33[30.3.1D: Contractor placed 65 cubic yards of concrete at grid lines D.5-3, D.5-3.3, E-3, E-3.3, E5-3.3. F-3 and L-3. I perfbrmed cvncrete cancra[ lasts an the first and fish loads. I cast concrete test cylinders on both loads. First load the sump is 3 1I2" and the air content is 5.2%. The fifth load the slump is 43/4"r and the air content is 6.2%, .]acobsens was notified about the high slump and accepted the load. Special Inspector: Clavton Maher Reviewed By: Bret McGowan I ,1- WT t P. 0.Box143 Rexburg, 183440 Daily Field Report Project: Thomas E. Ricks Building Date: 7/30/03 Location,., Rexburg, ID Weather:,Clear Client: BYU Idaho Project No.: 03-0003 Equipment: Jerome Bowen Work Force: Jerome Bowen Double J Concrete Jacobsen"s 1 Grader i Bobcat 3 end Dump Trucks 1 Foreman 1 Operator 4 Laborers 3 Driver's i Supervisor 1 Forema n 13 Laborers 1 Supervisor 1 Foreman Page 1 of 1 Temperature: 96° Hi: 50° LD Day of the Weeks, Wednesday 8.a Hours 8.D Hours 8.0 Hours 8.0 Hours 8.D Hours 8.D Hours 8.0 Hours $.5 Hours 8.5 Hours 8.5 Hours x.1.5 Hours 11.5 Hours Special Inspector observations: Contractor hours. Jerome Bowen 7:00 am to 3:30 prn Double J Concrete 7:00 am to 4.00 pm Jacobsen's 6:,00 am to 5;30 prn Jerome Bowen: 2300,3,18: Contractor continued playing and compacting gravel in parking lot. Double 3 Concrete: Section 3300.3,8: Contractor continued to, place steel reinforcement in footings. I performed steel reinforcement inspections. Embeds needed to be lightened against forms. Informed contractor. Special Inspector: Clayton Maher Reviewed By. Bret McGowan Page 1 of 1 P.O. Box143 Rexburg., ID 83441 Id W1. - ­ --JMM :0. Project: Thomas E. Ricks Building Date: 7/31j03 Location: Rexburg, ID Weather. Gear Clienb BYU Idaho Temperature: 98° HI: 47° LO Project No.: 03-0003 Day of the Week: Thursday Equipment: Jerome Bowen [ruble 3 Goncrete N=.kuke 1AN110 1 Grader 8.0 Hours 1 Bobcat $.0 Hours 3 end Dump Trucks 8.,0 Hours 1 Foreman 8.4 Hours 1 Operator 8.0 Hags 4 Laborers 8.D Hours 3 Drivers 8.D Hours 15upervfsor 8.5 Hours 1 Foreman 8.5 Hours. 13 Laborers $.5 Hours 1 Supervisor 11.5 Hours 1 Foreman 11.5 Hours Special Inspector observations: Contractor hours: Jerome Bowen 7:00 am tD 3:30 pm Double J Concrete 7.00 am to 4.00 pm Jacobseafs 6:00 am to 5:30 pm, Jerome Bowen: 2-300.3.18: Contractor continued p6dng and com, mcfing gravel in parking lot Double J Concrete: Section 330Q.3.3: Conb-actvr placed 85 cubic dards of concrete into stem wall on grid line C-4.7 to J.5-4.7. The first 80 pubic yards of concrete had plasticizer, the last free cubic yards did not. Contractor also placed 35 cubic yards into footings on grid lines L-4, M-2 to M-2.5 and 13-2.1 to G- 2.2. I perfomied concrete control tests an the second, and ninth loads. I also cast three sets of concrete control test cylinders. The resins of the firsttest are: slump= 7"",& air content= 5.2%, the second test: slump=7 1/4;air mr�ten'�= 5.9�b and the third �tes� fwithnut nh-c&w-aer)- slumR— 3 %M1, * air c+rt' ■ ■ na f %. Specfal Inspector: Upylpn Maher, Rev!A"owed By: Bret McGowan P.O. BOX143 Rexburg, ID 83440 Page 1 of 1 Daily Field Report Project: Thomas E. Ricks BuildingDate. 8/04/03 Location: Rexburg,,xID Weather: Hot & Breezy Client: BYU Idaho Temperature: HI: 82° LO: 59° Project No.:03-000330 Day of Me Weeks, Monday Equipment: Jerome Bowen I Loader 8.D Hours I Enid Dump Truck 8.0 Hours Work Face: Jerome Bowen 1 Supek:m--sor- 8.0 Hours I Operator S.0 Hours 2 Laborers 8.Q Hours 1 Driver 8.0 Hours Double J Concrete 1 Supervisor g.0 Hours 5 Foremen 9.0 Hours 19 Laborers 9.a Hours Jacobsen's 1 Supetvisor 3.5 Hours Speciai inspector observations: Contractor hours: Jerome Bowen 7.w,,00 am to 3:30 pm Double J Concr 6:00 am to 3:30 pm Jacobsen's 5:30 am to 1.-00 pm Jerome Bowen: Section 230U.3.7: Contractor continued excavation of steam tine East of building, Superior Blasting; Section 33003,10: Contractor placed 10 cubic yards of grout into bare hales for footings., T cast one set of 6 test cylmders. Behar was placed in designated bore holes. Double I Concrete: Section 330Q; Contractor placed reinforcing steel at grid fines D,5-�3, D.5-3.3, E-3� E-3.3, E.5-3,3 F-3 and L-3. f Steal Inspector: CiaAon Maher Revi firm By: Brei McGowan P.O. BoA43 Rexburg,, ID 83440 Daily Field Project: Thomas E. Ricks Building Location: Rexburg,, ID Clients. BYU Idaho Project No.: 03-0003 Equipment: Jerome Bowen Work Force. Jerome Bowen Double J Concrete Jacobsen's 1 Loader 1 End Dump Truck 1 Supervisor 1 Operator 2 Laborers I Driver 1 Supervisor 5 Foremen 19 Laborers 1 Supervisor i Report Date: 8/05/03 Weather: Hot & Breezy Temperature: Hi: E180 LO: 68° Day of the Week: Tuesday 8.0 Hours. 8.0 Hours 8,q 0 Hou rs 8,,.0 Hours 8,,0 Hours $.0 Hours 3:3(3 9.D Hours 9,.0 Hours 9,.0 Hours 7.5 Hours Special Inspector observations: Contractor hours: Jerome Bowen 7;00 am to 3;30 pm Double J Concrete 5:00 am to 3:3(3 pm Jacobsen"s 5:3v am to 1:00 pm Jerome Bowen: Section 230a.3.7: Contractor continued excavation of steam line East of building. Superior Blasting: Section 3300.3-101: Contractor placed one set of 6 test cylinders. Rebar was 10 cubic yards of grout into bore hales for footings. T cash placed in designated bare holes,. Double J Concrete: Seffion 3300: Contrador placed reinforcing steel at grid lines D.5-3, D.5-3.3, E-31 E-3.3, F.5-3.3, F-3 and L--3. Special Inspe- ctor.a Clpyton Maher Renewed �y►: fret McGowan P.O. Boxl,43 Rexburg, ID 83440 Page 1 of 1 Daily Field Report Project:nomas E. Ricks Building Date: 8/06/03 Location: Rexburg, ID & Breezy Client: BYU IdaWeather.Hotho Temperature: HI: 9Z° LO: 53° Project No.: 03-0003 Day of the Week: Wednesday Equipment: Jerome Bowen 1 Loader 8.0 Hours 1 End Dump Truck 8.a Hours Work Force; Jerome Bowen 1 Supervisor 8.0 Hours 1 Operator 8.0 Hours 2 Laborers 8.0 Hours 1 Drier 8,.0 Hours Double J Concrete I Supervisor 9.0 Hours 5 Foremen 9.0 Hours 19 La borers 9.Q Hours Jacobsen"s 1 Supervisor 7,5 fours Special Inspector observations: Contractor hours: Jerome Bowen 7:00 am to x:30 pm Double J Concrete 6:00 am to 3:3U pm Jacobsen% 5:30 am to i:00 pm Jerome Bowen: Section 2300.3.7: Contractor continued excavation of steam fine East of building. Superior Blasting: Section 3300.3. 10: Contractor placed one set of 6 test cylinders. Rebar was 14 cubic yards of grout into bore holes for footings, I past placed in designated bore hales. Double J Concrete: Section 3300: Contractor placed reinforcing steel at grid lines #].5-3, D.5-3.31 E-3, E-3.31 E.5-3.3! F-3 and L-3. Special Inspector; Qa -Aon Maher Reviewed By: Brit mgEowan P.0.13ox143 Rexburg, ID 83440 Daily Field Report Project: Thomas E. Ricks Building- Date: 8/07%03 Location: Rexburg, ID Client: BYU Idaho Project No.: 03-0003 Equipment: Jerome Bowen Work Force. Jerome Bowen Jacobsen"s 1 Loader 1 End Dump Truck 1 Supervisor 1 Operator 2 Laborers 1 Driver I Supervisor 5 Foremen 19 laborers 1 Supervisor Page 1 of 2 Weather. Hot & Breezy Temperature: HI: 92(' LO: 53° Day of the Week*. Thursdau 8,.0 Hours 8.0 Hours 8.0 Hours $.0 Hours S.0 Hours 8.0 Hours 9,Q Hours 9.0 Hours 9.0 Hours 7.5 Hours SPecial Inspectvr observations: Contractor hours,,,, lemme Bowen 7:U0 am to 3:3o nrn Double I Concrete Jacobsen's 6:00 am to 3:30 pm 5:30 am to 1:00 pm Jerome Bowen: Section 2300.3.7-. Contractor continued excavation of steam dine East of building., Superior Blasting; Section 33D0.3.10: Contractor placid 10 cubic yards of grout into bore holes for footings. I cast one set of 6 test cylinders. Rebar was placed in designated fore hales. Spedal Inspectw:. Clavton Maher A%Uam Revilumved Syn. Bret McGowan W, P.O. Box143 Rexburg, ID Page I o,j� Daily Field Report Projects. Thomas E. Ricks Building Dates. 8/08/03 Location: Rexburg', ID Weather.* Hot & Breezy Client.* BYU Idaho Temperature,, HI: 92° LO: 47° Project No.: 03-0003 Day of the Week:, Friday Equipment. Jerome Bowen 1 Loader 8.0 Hours 1 End Dump Truck 8.0 Hours Work Force. Jerome Bowen 1 Supervisor 8.0 Hours 10 perator 8.D Hours Z La borers S,0 Hours 1. Driver 8.0 fours Double 1 Concrete 1 Supervisor 9.0 Hours, 5 Foremen 9.0 Hours 19 Laborers 9.0 Hours Jacobsen"s 1 Supervisor 7.5 Hours Special Inspector observations: Contractor hours: Jerome Bowen 7;00 am t0 3:30 pm 60� Double I Concrete 6:00 am to 3:3D pm Jacobsen's 5:30 am t0 1:00 Pm Jerome Bowen: Section 2300.3.7: Contractor finished excavation of steam dine East of building. Superior Blasbng: Section 3300.3.1U: Contractor placed 10 cubic yards of grout into bore holes for footings. I cast one set of 6 fest cylinders. Rebar was placed in designated bore hoses,. Spedal Inspector:. Clavton Maher Revi.,.-.,ed By: Bret McGowan Dail P.O. BoA43 Rexburg, ID 83440 Page 2 of 2 Double ] Concrete: Section 3300.3.10: Contractor placed 65 cubic yards of concrete at grid lines D.5-3, D.5-33, E-3, E-3.31 E.5-3.3, F-3 and L-3. I performed concrete control tests on the first and fifth loads. I cast concrete test cylinders on both loads. First load the slump is 3 1I2rr and the air contend i5 5.2%. The fifth [clad the sump is 43/4" and the air content is 6.2%. Jacobsen"s was notified about the high slump and accepted the load. Section 3300.,3.4: Contractor placed embeds at gridlines ].5-4.7 to K 4.7. K 4.7 to K.8 to M 8 for stem wails. Section 3300.3.8: Contractor placed steel reinforcement at gridlines J.5-4.7 to K 4.7, K 4.7 to K.8 to M 8 for stem walls and gridline M 8 to N 84f M.2-7.4 to N7.4 and M-.2 Spedal Inspector: QpAon Maier Reviewed By: Bret McGowan Page 1 of 1 P.O. Box143 Rexburg, ID 83440 Daily Field Report Project: Thomas E. Ricks Building Date: 8/11/03 Location: Rexburg, ID Client: BYU Idaho Project No.: 03-0003 Equipment; Jerome Bowen Double 3 Concrete Work Fvrce; Double J Concrete ]acohsen`s Weather. Hot & Breezy Temperature: HI: 90° L0:56° Day of the Monday 1 CAT 320 Trackhce 1 Volvo L90c Trackhoe 1 Case 95xT Bobcat 1 New Holland LS 180 Bobcat 1 Supervisor 5 Foremen 19 Laborers 1 Foreman 2 Operators 2 Laborers 1 Supervisor 1 Fore -man &.0 Hours 8.0 Hours 8.0 Hours 8.0 Hours 8,.0 Hours 8.{3 Hours 8.0 Hours 8,0 Hours 8.0 Hours 8.0 Hours 8.0 Hours 8.0 Hours Special Inspector observations: Contractor hours -D. Jerome Bowen 7:00. am to 3:30 Pm Double 3 Concrete 7:00 am to 3:30 Pm Jacobsen's 7:00 am to 3:30 Pm Double 3 Can rete: Section 3300.3. 0: Con, ctor p1l 100 yds of concrete into stem walls at grid lines 1.5 to K 4 to 7., K 4 tv 7 to K and K 'I. to M I performed concrete control tests and cast three sets of four cylinders. The slump on the fi test is 6" and the air content is 5.4°/0. The slump on the second test is 7 Ile and the air content is 5.6%. The third test slump is 7 1/4" and the air content is 5.2%. Section 3300.3.3-. Contractor started setting farms for spot footings. Jerome Bowen: Section 2300.3.7s. Contractor started excavating far stem line vault. Section 2300.3.16: Contractor continued relocating sprinklers around parking lot. Special Inspector: Cia�rtan Maher ReViewed By*. Bret McGowan Page 1 of 1 P.O. Box143 Rexburg, ID 83440 ily F'Ield R.epo'r-t- Project: Thomas E. Rices Building Date: $/15/03 Locationo. Rexburg,. ID Weather: Hot Client: BYU Idaho Temperature; Wi; 740 LO: 54° Project No:,: 03-0003 Day of the Week; Friday Equipment0 : Jerome Bowen Work Fome. Double J Concrete lacobsen's 1 CAT 3-20 Track hoe 8.5 Hours 1 ZaA LC200 Track hoe, 8.5 Hours 3 End Dump Trucks 8.5 Hours 1 Case 95xT Bobcat 8.5 Hours 1 New Holland LS 180 Bobcat 10.0 Hours 1 Supervisor 1(}.a Hours 5 Foremen 1a,0 Hours 19 Laborers 10.0 Hours 1 SuperVISDr 8.0 Hours 1 Foreman 8.0 Hours 3 Truck Drivers 8.0 Hours z Operators 8.D Hours 2 Laborers 8.0 Hours I Su petvisor 10.[3 Hours 1 Foreman 10.0 Hours Spedal nspector observations: Contractor hours: Jerome Bowen 7:00 am to 3:3a pm Double J Concrete 7:00 am to 5:00 pm Jacobsen"s 7:00 am to 5:00 pm Jerome Bowen: 2300.3.7.m Contractor excavabed trench for steam lines along the South side of the buil-ding. Double J Concrete-. Section 3300.3.10: Contractor placed 61 yds3 of concrete into stem walls along N tine, grid 3.3 to 7.0 and columns at Grid line M.O. 3.0 to a.4. I performed concrete control test and past i set of test cylinders. the slump is 7 1/2'" with plasticizer. The air- content is 5.6°Io. Special Inspector; CI@Aon Maier Revriewed By: Bret McGowan P.O. BoA43 Rexburg, ID 83441 Special Inspector observations, tage 2 of r2 Jerome Bowen: 230U.3.7: Conctor continued excavating waterline trench on the South side of the building and excavates utility drench along the East side of the building'. Doable ,] Concrete: Section 3300.3.10: Contractor placid 9 1/20s� of concrete infix �botings at A.0, 2.8; yds 3 into columns and grade beams at K.6, 3,D; M -Or 3.0; M.0, 7,4; K.6. 2.Q to k.6, 3.0; and K.O. 4.0 to LO, 4.D and 85 yds3 into stem wall at C-0, 2.2 to H.Or 2.2 and H.,O,, 2.0 to H.O., 3,D, Contractor also placed 11 yds of concrete intim a steam vault footing at the Southeast tamer of the building. The sump on the footings for the building is 3 1/2" and the air content is 5,711/0, The sump on the cafumns and grade beams is 4 1/4"and the air content is 2.4%. The first test for the stem wolfs is 7"" and T couldn't " _ rform an air test.' The seavndt�:st is a 7 '/z" slump and a 5.6°,� air content. The glumTrn tne A6am vault fboUngs is 4 1/z"and the air content id 5.f%. Special Inspector: Clayton Maher Revie.wed By: Bret McGowan D Immow-ws ail 90 y �-"' a !T i=W-- tr. 'r - -r i " P.O BOX143 Rexburg, ID 83440 Double J Concretet Section 3300: Contractor set forms and placed imbeds on walls at grid line A.7/2.2 to C..0/2.2, Contractor set forms for Mechanical pad at gridline 8.0/2.2 to B.0/3.0 through C,0/2,2 to C.0/3.0, Danco: Section 5310: Contractor continued fabricating wail frames for first floor walls. I performed visual weld inspections on ledger beams and Nelson Studs at gridlines M.0/1.0 to C` M.0/4.0 thr()Ugb P.0/1.0 to P.,0/4.0,, 16 Nelson Studs were found to be deficient. Jerome Bowen: Section 2630: Contractor continued to backfill and compact trench line at approximately 125' North of Southwest comer of Parking Lot to appnwcimatelY 225' North of Southwest comer of Parking lot. ole) a Of Lip is A JL lilt Spedal Inspectork Clayton ,Maier Dail Special Ins�sector observations: Doubly .7 Concrete: P.O. Box143 Rexburg, ID 83440 MAL: � -A � 0 ..1[ ;MU! I' �1 ; ti Section 3300: Contractor placed 52 cubic yards of light weight concrete for slab on deck at gridlines M.0/2.0 to M.0/4,Q through P-.0/2.0 R.0/4.0. Contractor placed 25 cubic yards of concrete into walls at gridlines G.0/3.0 to G.014.5 and G.0/4.5 to K.0/4.5 at elevation 12` to ZD'. Concrete control tests were performed and one sett of four test cylinders were past. The slump is 8.0" and the air content is S.0%., Danco: Section 5310: Contractor continued fabricating wail for fi door waits. Contractor placed steel beams at grid lines H,0/1-0 to H.0/3.0 through K-0/1.0 to K.0/3 -0 - Jerome Bowen: Section 2630..8 trontractor excavated storm line trench and placed storm pipe from approximately 225' North of Southwest corner of Parking Lot to approximately 3U0' North of Southwest corner of Parking lot. Contractor placed and compacted backfill into trench, Special inspector: aaAon Maher Reviewed By: Bret McGowan