HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00028 - BYUI Rick Building - New BuildingCITY QF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections,, For on-site construction, from time to time the buildin official, u on
it
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shalt notify
the permit holder or his agent wherein the same fails to comply with this code.
%_.0
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly madeafter poles or p iers ars set or trenches or basement
arias are excavated_ Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and an dab site or tied in place.
3. FOUNDATION INSPECTION:
The foundation insDecfion shad included excavations for thickened slabs
intended for the support of bearing wails, partitions, structural supports, or
equipment and special requirements for wood foundations. All farms and
reinforcing steel, etc., shall be in place..
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly �nac�e prior to covering or concealment,
before fixtures are set, and prior to framing ins�ection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections a] --e approved. {Electrical inspection oerformed through
State of Idaho Electrical Bureau}
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS.,,
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections aboWe, the building depart -Ment may
maks or require any other inspections to ascertain compliance Wth this
code and other laws enforced by the building department-
INSPECTION
CARD
The permit holder or his agent shall past the inspection record on the job site in an accessible
and conspicuous place to allow the bUilding official to make the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approved_
have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
electrical: 624-3767 Building.- 359-302a ex 326 or 313
Plumbing: 359-302a enc ;326 or 313 or 3,59-3034
Signature: _ ,�...�. r� . � -���- .� Date._ � �.._.��