HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00027 - Rexburg Housing - Apartment RemodelCITY OF REXBURG
13UILDING INSPECTION SEQUENCE
Type of inspections: For cin-siteGonstru�tiQn, from time to time the wilding official, upon
notification from the �erm�t holier ar hFs agent, s�half make o� pause to bde any necQssar�
inspections and shall either approve that p�t'111111rtion of the construCtion as completed car shah notify
the permit holder or his age�� �rherein the same Waifs to comply with this code.
..... ..... 0 place or wiciing, prior lo excavation:
2, FOOTING: Commonly made after poles or piers ars yet or trenchns or basement
areas are excavated. Forms and horizontal reinforcing died in place,
vertical reinforcing cut and on jab site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened stabs
intended for the suDr)ort of bearing walls, partitions, structural supports, or
e�au��men# and s�aecial requirements for wood foundation�s. ASI foams and
i
reinforcing steel, etc., shall be in lace.
%R
4. PLUMBING, MECHANICAL AND ELECTRICAL':
Rough inspection: Commonly made prier to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
InSDections of trusses.
6. FRAME INSPECTION.1
.
Commonly made after the roof, ail framing, firestor)ping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
sough inspections are approved. (Electrical inspection performed through
State of Idaho Electr�icaf Bureau)
7.
LATH AND/OR WALLBOARD IN%.�PECTION:
Commonly made after all lathing and/or wallboard interior is in puce, but
before any piaster is applied, or before wallboard joints and fasteners are
taped and finished.
S. FINAL PLUMBING AND10- -EATING INSPECTION.-
All
systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION;
Commonly made after the building is completed and ready for occupancy
11. OCCUPANCY PERMIT.-
Issued
when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections move, the building department may
make or require any ether inspections to ascertain compliance Aith this
code and other haws enforced by the building departMent. (Y� _ -
INSPECTiOhl CARO
The permit holder or his agent shall post the inspection record on the job site in an accessible
and conspicuatis place to allow the bUilding official to make the required entries. The recur 6'��
shah be maintained by the permit hol-der until the final inspection his been made and appro �d.
have read the above andwild comply in my requests for inspections by giving 24 HOUR,�
NOTIGE prior for inspections to be made. 1
Electrical: 624-3767 Buiiding: 359-3020 ex 326 or 313
Plurnbing: 359-3020- ex X26 or 313..or 359-3034
rSjgnature:�' J1
—U