Loading...
HomeMy WebLinkAboutDOCS - 03-00026 - Ryan Motors - New BuildingCf �ti fi � i rte Plan Checklist Applican Applicant: t Information, 0. Applicant's Address: Recorded Owner: Recorded Owner Address El Purchaser EevP_Innrnana N.,f,............-M___ 0 STATE OF IDAHO K..�an � Lessee'M'h 1�1 P.Q. Bax 280 12 forth Center Street Rexburg, Idaho 83440 Phone (2D8) 359-302a fax (20$) 359-3022 e-mail reXburg@srv.net File dumber: Phone: � �- Zip: Phone: FAX: t�6 6 i ld �.iQ� Project Name: Property Address.. 1. SiteRArxplan must be drawn to scale, be le, Pole and � also be submitted Aielecfiror�ica�ly If possible, 2. Adjoining streets labeled. 0 3, Right -of -way locion and width, curb to curb widths � 4. Building location, sq footage and dimensions end sfdevLralcation, 5• thaw existing end proposed easeme , uvrth distance to property lines. d easements. Existing utilities ;vrraterfines, sanitary sewer fines, rnanholes Q �� Proposed utilities �nclud�rrc� �t�e �n location to exis ' � ��a�m drains. E �-ting ser�lces and never easements. 8a proposed storm drain and sanitary sewer elevations�foripe iat-basins}. Pnverts �manholes an.. ch Ej 9• Storm drainage plan dor parkin rot and r � g sof areas, vvcfifi calculations. 10. Firs hydrants and fire suppression fines (including die to Citylines).X p rinklea D Not SprinkledEl� 1. Parking (including parking 10t, drainage arrows, dimensuan of lot, distance between rowsand notal �urrrbers}., � 12. Landscaping (type and total area; includin dimensions).13. Trash faeiiities.g i 4P +vortn Arrow 15. Drawing to Qcale, �ncluding a graphic sale (1 i ,z � 16. Pposed street improvemer�fis(curb. /� ��'���e�jf Possibly}. `�7. Legal description of pro.❑sed �u���r, ����walk, pavement, etc.) p building site included. � 18. Percent of lot covered bY builiding or paving calculate dr! 19. Show 10% snow storage area. � 20, Distance of entrances from street corner indicated. 21. Current Vicinity Map. (8 '/z x 71 'T� at 3n0' scale showing location of the property.. va-21\10TE; SITE PL/�N,5 MUST BE CC)MPLETE AND SUBM(T OR REVIEW BEFORE THE PR0JECT VV)LL BE PLACED ON THE PLANNING & ZONING AGE r NDA' c633 Subject: STATE OF IDAHO Snow and Wind Load Disclosures for Manufactured Home installation Permit Applicants P.O. Box 280 12 North Center Street Rexburg, Idaho 83440 Phone (208) 359-3020 Fax (208) 359-3022 e-mail rexburg@srv.net 4 F e" V 2 0 0 1'3 In accordance with requirements contained Within the January 1 24 2 revised Idaho Manufactured Home installation Standards (Section �O1.Q3�, �urisdi�t�or�s ��uhich have established roof snag wads exceeding 30 PSF are to reaired�the denier, installer, or customer With %ritten notification, signed by the Building Official, of the specific roof snow load requifernent, prior to the, issuance of an installatio Oil pennit. Units requesting a permit for installat' on must also comply with Foundation and Installation guidelines in accordance With the 20Q0 International Residential bodes and a.ny �nn� i c�.ble state guidelffies The Snow and Wind Loadn.ufactured Home Installatian Permit Applicants for the Jur�sdict�o� of �e�burg, M�.d�son county, Id are -as follows -- F Datel Site speci is SRO Wind Load.: Applicant Name: Applicant Address.- 35 PSIS' 85,M,P11 Applicant phone numbe�: Permit Number,,- 02m. ; 1 5 (C; 0 — 0 45 L(.:; 0 Please. contact me at (208)."659-3020ext. 324 ifyou have any questions vq...W%0 QD G3 � Val Christensen Building Official Lt'.0 - 30 T 4D S r) -X ;z a� -11 BUILDING INSPECTION SEQUENCE Type of inspections: For on-site constructian, frim fir-ne o time hie building official, upon notification from the permit holder or his aaent, shad make or cause to be made any �ec�ssary inspections and shall either approve that portion of the construction as completed or shah notify the permit holder or his agent wherein the same fails to comply with this rode. 1. LAYOUT: Lot corners staked, staking in place for building, prior to excavatFon: 2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizontal rein€arcing #led �n place, vertical reinforcing cut and on jab site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations dor thickened slabs in#ended for the support at bearing weals, pa4rtitions, structural su�p+arts, or equipment and saecial requirements for wood founda#ions. All farms and reinforcing steel, etc., shaft be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly rade prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5- TRUSS INSPECTIONi Inspections of trusses. 6. FRAME INSPECTION: Common ly made after the roof, all framing, fireStopping, draftstopping and bracing ars in place and after the piumbi�g, mechanical and electrical rough inspections are approved. (Electrical inspection, performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING NSF-L:u 0N: ASI systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete.10* FINAL INSPECTIQN: Commonly made after the building is completed and ready for occupancy. � � - �CC�PAN�Y PERMIT: Issuedwhen, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to. the called inspections above, the building department may make or require any other inspections to ascertain compliance with this cede and other laws enforced by the budding departrr�eraf. INSPECTION CARD The permit holder or his agent shall past the inspection record an the job site in an accessibie and conspicuous place to allow the building official to make the required entries. The record shall be maintained by the permit holder untie the final inspection has been made and approved_ I have read the above anci wiii comply in ray requests for inspections by giving 24 HOUR NOTICE prior for inspection. -S to be made. Electrical-' 624-37A i Bui�dir�g: 359-3D�0 ex 326 o� 313 Plumbing: 359-PAO ex 34bor 313 or 359-3034 Signature: Date: f