HomeMy WebLinkAboutDOCS - 03-00024 - Brighton Townhomes - 10 New BuildingsCITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type a� Inspection -s; Fay an -site construGtian, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be rade any necessary
insiDections and sham either aoQrove that portion of the construction as completed or shall notify
the permit h.,,o,_,_1.de-r or his agent_ where'n the same fails to comply with this rode.
1 . LAYOUT: Lot corners staked, shaking in place for�`_building, prior to excavation. -
24. FOOTING.."'K70" Commonly made after pales or piers are set or trenches or basement
reas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforc�ng cut and on fob site -'or tied in place.
3. FOUNDATION INSPECTION:
The fourTdation insiSe6fion shall included excavations for thickened slabs
� intended for the sur)port of bearing walls, partitions, structural supports, or
equipment and special reauirements for wood foundations. All forms and
reinforcing steo1; etc:, steal# be in place.
4. PLUMBING,IMECHANI 8"AL A�1l�] FI Fk^TlaiC~Af
._. w� RNLI• al.•
Rou,gh inspection:Cornmonly�made prior to covering or concealment,
before fixtures are sed, and prior to framina insr)ection.
5. TRUSS INSPECTION"J."
Inspections of trusses.
f. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
P.
�° � ►� � bracing are in glace and after the plumbing, mechanical and electrical
--�-;~'�� � t�= { `- { �_�-• �rough inspections are aoproved. (Electrical nsnec#ion pertomer,d through
State .qf Idaho Electrical Bureau) y �- � WWI� , ,
7. LATWAND/ORWALLBOARD INSPECTJON:
Commonly made after all lathing and/or wallboard Fnterior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPE:CTION--
All
systems in glace, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are sit, orior to placing concrete.
10. FINAL INSPECTION:
�
Commonly made after the building i5 completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. SINSPECTIONS:
In addition to the called inspections above, the building department may
maks or require any other inspections to ascertain compliance with this
rode and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post tyre insgec#ion record an the job site in an accessible
and conspicuous place to allow the bUilding official to make the required entrees. the record
shad be maintained by the permit holder until the final inspection has been made and approved.1 have read the abase and W11 �ompiy in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-3767 Building: 359-302U ex 326 or 313
Plumbing: 359-3Q20 ex 3?6 or 5,� 3 0r 359-3Q34
Signature:
Date:
'C �.Jto_wftv
Design Intelligence LLC
3685 West Hwy 33
Rexburg, Id S."3440
Builder and Designer:
STATE OF IDAHO
P.O, Box 280
12 North Center Street
Rexburg, Idaho 83440
Phone (208) 35,9-3020
Fax
e-mail rexburg@srv.Pet
8 May 2003
-P
The following are some areas Of cOn.cem for the Brighton Condominiums:
1. Beam WB2 Is supporting the second story floor and appears to have no suport at the
612rht end. The plans show no posts, walls, or � ��aotingsbelow the first floor other than the no al flo r andTJI's.
supporting the bea�n�above or
Z See New prints
Z. i�uczs are to i)e seaieci ana water Heaters are, to use heat traps.
1
3. Attic and crawl space accesses are not shown an the plans. -are they are installed,
4- Smoke Detectors are not requ)"Ted in kiiehens.
5,. Fire Einguisher needs tQ be moved away from stove area to suitable area.
6- ADA. bathrooms are not required in townhouses.
7. 5 parking spaces are required ta be handicap accessible of which I needs to be, van
accessible.
S. Accessible -ramps need to be installed in the sidewalks around the buildin g for access
from. the parking lot tv the buildings.
9. A handicap accessible ramp needs to be installed at the Southwest corner cunle by the
street as per attached sheet.
These Units can only be sold as Condainzmuuns as they are on the S
require front rear setbacks of 25" and 207and respee ively, site pias.. To`��n houses
Jan B erzy
Building Inspector
TOAWTO gOM rr MAY CONCERN
R��: Iffii Is �usifiitvsi�iti, r �,cr, �vsYEei'OIi
DATE: APRIL, 14, 20Q3
RF: ]BRIGHTON TOWNHOUSES
TO 1ArFI0M 1T MAY CONCERN -
upon review a_t�b the siti pian drawings st�bmztted -��.e �'a��owng items need to be
addressed:
� . Drawing is �naccurate, property due easy of proposed project belongs to
Shelbourne Apartments LLC.) not Grandview Townhouse Subdivision_
2. WATER ,SUPPLY: This proposed project shotes two hydrants of which offly one
appears to be acceI -ssible.. The east hvdrant i's loc��ed on the adjacent propefty that
is currently marginally acceptable accepiabie for theisfine�g facility. -
3. ACCESS: The north parking dot is approm.rnate1y X5 8 feet Tong withoutpravzsions fc�r a fie a�pa�atus iur�-around._ Cede states anything m excess of 150
fejt shall have means to turn apparatus around.
4. The areas adjacent to the build'
gs and along the north side without any park-in"�� Pas�%n�g, F�-e Lane" inditian io having the
spaces sha1l be marked vvit�x
curbs painted red and xn.au�tazned.
5. FIRE SUPPRESSION SYST��IrI: Pans indicate buddings to be in excess of 5, 00Q
square feet which requires a complete fwe sprinkler system according to .Rexburg
City Ordinance.
Additional plans are required tO complete, an accurate plan �-evlew of this project. If there
ax � ?.��.z i.��s�i�Cax15 �ec�t.S� �ee
L, L le.
C1 _L
Chris Huskinson
Fire Inspector
Energy Certifications
Inter -national Ener Conservation
As per section 1 Q? , 5 CC) all insulation insia.lItd shall have a ctrtif cafe issued.
Fnw
1J
Sn aJ De s1 e an aced 11stin fhinhw tv, e an
d a u4:11
msL�ation ffistalled. the instdller slaali also provide ane initial instaflftd thickn-ess', the
seed thickness, the coverage area and the number of bads installed dor blown az spayed
insulation. Where bIwAl-n-in or spayed insulation i's installed in walls,, floors., and
cathedral ce�.l�ngs, theMs-ta Ner shall provide a certification of the installed density and R-
"'
Valuo.
This uertif catz shall be posted i7-? a coz-?spicuous placga.. an the Jab site.
Roof/ceiling insulation
RoofCcilim,r insulation ��a� is blown -in or sprayed shall be identified by thickness
markers that ars labelcd in inches az rmIlimeiers znstalled at least one for evercr j00
J
square fees t�raug�Zou� ��e atizc. Thed markersm��e�s shill face the attic �.ccess, be aff�ed to the
Trusses or joists and mark -ed ��zth the minim
u inatza1 installed thickness and mixazmum
settled thickness wii11 numbers a minimum
Windows,a� 1" k ��e�g�t
doors and skylights
Wl'ndows doors.,.r � t-. nrn !'Y Ll � l Yl Z�a�!� G�.�1�.�. �j'1.L�liL� �lEGl.C�' E��+ �.�Ct-u�•ic .tzt uvvv.iu.�x.iivv i�.i�ii
bar an ac -credited, independent laboratory, anc� labeled and certified by the manufacturer.
Solas Heat Gain Coefficient (SIIGC) of glazed fenestration prod -acts (windows., gazed
doors, and sk�rlights� shall be determined 1AW NTRC 20O.Thc label shall be affixed to �-�em �ho��nE the U- factor.,Where tie babel is not affLxed and the U factor cannot be
dcl,tcrmiined Table 1d2.5. 2(1) or 102.5.2(2). (SCC) shall be used as a de -fault.
Ducts
Duct insuiatian"rhen installed in unconditioned attics or autszde shall have at a
minimum R- 11 for supply and R-6 //-D r) zn unconditioned area} for'retums as per Table503 . � .3.3 . A1I ducks .�nusi be �ea�ed.
Water Heaters
Heal traps. are required and or xnsulati on der. Table � X3.3
Hot Water Reeirculatiner Systems
Hat �rater Recirculating System piping shall have pipes insulated in accordance
Y�Nam Table .��4.5 a��.d SoclUon 5D3.3.3.Z a�_d �ave a i—.�arual ,�1a� �,ff for t�h�� system is
not in use.
Lighting
A11 commercial lightmg must comply -With �fi=r,%ff,�s
�.�ze I1-��`�. All rooms in rooms vv�th 2
�mope must be s��tched four ligbtxn�.
Summary
Certifications froom. installer posted cin � ob site and xnust meet energy calculations turned
�z u.�zih plans.
U -factor must be on door, window, and skylig-ht at time of inspection.
eruct insulation in accordance with Table 5uj_�.�.3 C)ut
sj-a,c Ri j- supp,y Ro' rem.
Inside unconditioned space RI X supply R2 return. Ducts must be sealed.
Water heaters to use heat taps or Insulation. ReeiMulating systems must have a
convenient shut off and be insulated.