Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00023 - BYUI Benson Building - Room 205 RemodelBUILDING INSPECTION SEQUENCE Type of inspections: dor on-site construction, from time to time the buildingoffic'al,notification from the permit holder or his went, shall make or coosbe upon inspections and Thall either a�prave that portion of the construction as made any n�cessar}� the Permit hollder or his ageni wherein the same tal"Is to COMPlyviithis��°�eted a� shall notify � . �AYQUT: Lot carvers staked, stakinin oiace for �� code. �. FOOTiNG: Commonly made after pokes orpiers are �l�g, pnor t� �xcavat�on: set or trenches or basement areas are excavated. Farms and horizontal reinforcing tied in p ace, vertical reinforcing cut and on jib site or tied1'n place. 3. FOUNDATION INSPECTION,0 The foundation insnection shall included excavations for thickened slabs intended for the �upgort of bearing wa:�fs, partitions, structural supports, or equipment end special rec��airements for wood foundations. All farms and reinforcing steel, etc., shah be in place. 4. PLUMBING, MECHANICAL AN E ECTRICAL Rough ins,r)ectRon: Commonly made prior to covering or canceaiment, before fixtures are yet, and prior to framing inspection, 5. TRUSS INSPECTION: inspections of trusses. 6. FLAME INSPECTION: Commonly made after the roof, all framing, firestopping, drafts,toppingandbracing are in place aand after the plumbing, rneehanica! and electrical rough inspections are approved. (E'lectrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WAI-LBOARD INSPECTION: Commbnly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard faints and fasteners are tar)ed and finished. 8. FINAL PLUMBING AND HEATING I All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTI ON'. After dorms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 11- OCCUPANCY PERMIT: Issued when, an final inspection, building is ready to occupy, 12- OTHER INSPECTIONS: - In addition to the called inspections above, the building department may male car require any other inspections to ascertain compliance with this cods and other favus enforced by the building department. 1N.qPPr-T1nK1 r� A mn •••••• �v evfq' V,MRV The permit holder or his agent shall posh the inspection record on the job site in an accessik�le and conspicuous place to allow the building official to rake the required entries. The record shall be maintained by the permit holder unm the final insr)ection has been made and approved. have reach the above and will campy in my requests for inspections by gilding �4 HOUR NOTICE prior for inspections to be made- Electrical: X624 -37f7 Building: 359-3020 ex 325 or 313 Plumbing.- 359-3029 ex 326 or 313 or 359-3034 Signature: - . , - F gj Date.,