HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00023 - BYUI Benson Building - Room 205 RemodelBUILDING INSPECTION SEQUENCE
Type of inspections: dor on-site construction, from time to time the buildingoffic'al,notification from the permit holder or his went, shall make or coosbe upon
inspections and Thall either a�prave that portion of the construction as made any n�cessar}�
the Permit hollder or his ageni wherein the same tal"Is to COMPlyviithis��°�eted a� shall notify
� . �AYQUT: Lot carvers staked, stakinin oiace for �� code.
�. FOOTiNG: Commonly made after pokes orpiers are �l�g, pnor t� �xcavat�on:
set or trenches or basement
areas are excavated. Farms and horizontal reinforcing tied in p ace,
vertical reinforcing cut and on jib site or tied1'n place.
3. FOUNDATION INSPECTION,0
The foundation insnection shall included excavations for thickened slabs
intended for the �upgort of bearing wa:�fs, partitions, structural supports, or
equipment end special rec��airements for wood foundations. All farms and
reinforcing steel, etc., shah be in place.
4. PLUMBING, MECHANICAL AN E ECTRICAL
Rough ins,r)ectRon: Commonly made prior to covering or canceaiment,
before fixtures are yet, and prior to framing inspection,
5. TRUSS INSPECTION:
inspections of trusses.
6. FLAME INSPECTION:
Commonly made after the roof, all framing, firestopping, drafts,toppingandbracing are in place aand after the plumbing, rneehanica! and electrical
rough inspections are approved. (E'lectrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WAI-LBOARD INSPECTION:
Commbnly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard faints and fasteners are
tar)ed and finished.
8. FINAL PLUMBING AND HEATING I
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTI
ON'.
After dorms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11- OCCUPANCY PERMIT:
Issued when, an final inspection, building is ready to occupy,
12- OTHER INSPECTIONS:
- In addition to the called inspections above, the building department may
male car require any other inspections to ascertain compliance with this
cods and other favus enforced by the building department.
1N.qPPr-T1nK1 r� A mn
•••••• �v evfq' V,MRV
The permit holder or his agent shall posh the inspection record on the job site in an accessik�le
and conspicuous place to allow the building official to rake the required entries. The record
shall be maintained by the permit holder unm the final insr)ection has been made and approved.
have reach the above and will campy in my requests for inspections by gilding �4 HOUR
NOTICE prior for inspections to be made-
Electrical: X624 -37f7 Building: 359-3020 ex 325 or 313
Plumbing.- 359-3029 ex 326 or 313 or 359-3034
Signature: - . , - F
gj
Date.,