Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00021 - American Manor Apartments - RemodelCITY QF REXBURG BUILDING INSPECTION SEQUENCE Type of lnsr)ections: Far on-site con�truc#ion, from time to time the building official, upon notification from the permit holder or his agent, shall make or case to be made any necessary ir�spections and shall either approve that aorkian of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1 . LAYOUT-, Lot corners s#aked, staking in ace for building, prior to excavation:2. FOOTING: Commonly made after poles o'r' piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on lob site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened slabs intended dor the support of bearing walls, partitions, structural supports, or eQuit�men# and soeciai requirements for wood inundations. All farms and reinforcing steel, etc., sha!l be in place. lb -0 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: Inspections of trusses. 6. FRAME INSPECTION: Commonly made after thp. rnnf qfl framinirgaofn af+n+.,.,�.:�� /1 i 10. e 'u�� ieel-++�IuF,J�.JIII�1 �,JfC'1Il.7lV�,]�.,llfP� CjIIu bracing ars in place and after the plumbing, mechanical and electrical rough inspections are approved, (Electrical inspection performed through State of Idaho Electrical Bureau) LATH AND/OR WALLBOARD INSPECTIO'N Commbnly made after all bathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard points and fasteners are taped and finished. FINAL PLUMBING AND HEATING INSPLE:7� T 10N: All systems in place, fixtures set, ready forO Cr. HnA nry SIDEWALK INSPECTIONS: After forms are set, FINAL INSPECTION: friar to placing concrete. Commonly made after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the cabled inspections above, the building department r ay make or require any other inspections �o ascertain c�r�p�iance with this code and other Paws enforced by the building department. INSPECTION CARD The permit holder or his agent serail post the insc)ection record on the jab site in an accessible and conspicuous place to allow the building official to make the required entries. The, reeord shall be maintained by the permit holder until the final insnection has been made and approved. have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prig for inspections to be made. Electrical: 624-3767 Building: 359-3020 ex 32E or 313 Plumbing: 359-3020 ex 326 or 313 or 359-3x34