Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00019 - Green Gables II - Three 4-Plex BuildingsCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building official, upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation. 2. FOOTING: Commonly made after pokes or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on job site or tied in place.. 3. FOUNDATION INSPECTION: The foundation inspection shall 'Included excavations dor chickened slabs intended for the support of fearing walls, partitions, structural supports, or equipment and special requirernents for wood foundations. All forms and reinforcing steel, etc,, shail be in place. 4. PLUMBING, MECHANICAL AND ELECTRICALIP Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prier to framing inspection. 5. TRUSS INSPECTION: Inspection5 of trusses, 6. FRAME INSPECTION: Commonly mace after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections ars approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is. -applied, or before wallboard joi I nts and fasteners are tape! and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS- 0 Alter forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the colied inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shall post the inspection record on the job side in an accessible and conspicuous place to allow the building official to make the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. have read the above and will comply in my requests dor inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767 Building,.- 359-3a20 ex 326 or 313 Plumbing:- 359-3Q20 ex 326 or 313 or 359-3034 Signature: P L v Datewli