HomeMy WebLinkAboutRECEIPT - 03-00018 - Moody Canyon Farms - Airplane HangarBuilding Permit Valuation Fees
City of Rexburg (2,08)3.59-3020
12 North Center Street
Rexburg, Idaho 83440
Owmr:-IMoody Canyon Farms - David Wood
Building Name: Hanger
Address: 463 Yeager Street
Date: 5/612003
ildi4- ow
Mechanical Valuation $01
PlumbingPermit
Rate Chart: Residential & Non Commercial
Number of Fixtures 01
Sprinkler Fee: $18-00.
Rate Per Fixture $8.00
Base Fee $30.00
Rate Chart: Commercia.1
Cost of Plumbing:
Rate Chart. -
Water & Sewer Permit
Water Line Size
.
00 1
"Total Meter Parts
Meter E3ox $x`0.00
Ring & Lid $32.00
Curb Stop $27.00
Setter $53.00
Begin
0
2070,01
1-K001
200,001
Inches
0.75
1.00
2.00
3.00
4 Oro
Hoo!Lup..FeesRateWa
Digging Permit Fees
M[n[[TaUCiE & All HOST3e5 $11100,00
,Minimum & All Homes
Apts (# of Stridents) $270.04
Ap#s (# of Students]
Apts (Family Housing) $425.00
Apts (Family Housing)
Water Front Footage $12.00
Sewer Front Footage
Total Water & Sewer Permit Fees
Number
rResidResi,er��al$0.00
$0.00
$0.00
$a.0o
Pius
0.00
3.05
14.00
10.10
.
0060
.
4.75
3.65
r
Apartments
Commercial
Parking
Per
100
100
1 000
1000
1 000
1000
1000
1 000
Til Building PermitFee.-
Plan
ee;
PI n Check Fee
-7 q so", -- 6k 6 y
Construction Type
Residential
Basement
Apartments
Garage
!Commercial$4.30
$121,312.80
$0.00
Fees
0.00
0.00
0.00
0.00
0.00
I J 1 • 1
0.00
0.00
$15113.10
$111.31
Ferre Fee: 0.00
01 Sprinkler Fee: 0.00
Base Fee,, 0.00
Total Plumbing Penh F $0.00
End Base Plus Per Fees
205000 30..00 3.0% 1 0.0.0
100,$000 630.00 2.0% 1 0.00
2007000 2230.00 1,0% 1 0.00
9919999999 3230. 0.5% 1 0.00
Meter
$125.00
$195.00
$1,327.79
$11868.00
$216,18-50
Sewer Rate
$575.00
e
$235.0-0
Total Plumbirng Permit Fee:
Number of
Bldgs
$182.00
$182-00
$49-62
$39.54
Total Water Meter arm Parts:
Y 7 2003
Acres
0.00
Mob
P1 0.00
Unit
Total All Fees:
$24.30
$33.2
01-322,11
1--322.17
01-322.14
$0.00 1-32214
$0.010
$0,00
$0.00
$0.00
$0.00
.
00
11 to
9M
01
6
01
-346.20
34-346,30
ng ergt
umbert
-346.30
'
Value f Constniction:
$121 X3
Const. Type
A
Finished Sq Foote
41200
Sq
F cost
Unfinished Sq Footage
0
S �i
't
Garage Square Footage
0
7
Sq
Ft Cost =
Construction Value Factor
%
Total q r
'Foot dost -_
Begin
End
Base
Rate Chart:
0
500
23.50
1
21000
23.50
21001
25,000
69,25
25,001
50,000
391.75
50,001
1007000
643.75
100,001
500300
993.75
50OX001
1 Y010
3233.75
170005001
99199,999
5608.75
Mechanical Valuation $01
PlumbingPermit
Rate Chart: Residential & Non Commercial
Number of Fixtures 01
Sprinkler Fee: $18-00.
Rate Per Fixture $8.00
Base Fee $30.00
Rate Chart: Commercia.1
Cost of Plumbing:
Rate Chart. -
Water & Sewer Permit
Water Line Size
.
00 1
"Total Meter Parts
Meter E3ox $x`0.00
Ring & Lid $32.00
Curb Stop $27.00
Setter $53.00
Begin
0
2070,01
1-K001
200,001
Inches
0.75
1.00
2.00
3.00
4 Oro
Hoo!Lup..FeesRateWa
Digging Permit Fees
M[n[[TaUCiE & All HOST3e5 $11100,00
,Minimum & All Homes
Apts (# of Stridents) $270.04
Ap#s (# of Students]
Apts (Family Housing) $425.00
Apts (Family Housing)
Water Front Footage $12.00
Sewer Front Footage
Total Water & Sewer Permit Fees
Number
rResidResi,er��al$0.00
$0.00
$0.00
$a.0o
Pius
0.00
3.05
14.00
10.10
.
0060
.
4.75
3.65
r
Apartments
Commercial
Parking
Per
100
100
1 000
1000
1 000
1000
1000
1 000
Til Building PermitFee.-
Plan
ee;
PI n Check Fee
-7 q so", -- 6k 6 y
Construction Type
Residential
Basement
Apartments
Garage
!Commercial$4.30
$121,312.80
$0.00
Fees
0.00
0.00
0.00
0.00
0.00
I J 1 • 1
0.00
0.00
$15113.10
$111.31
Ferre Fee: 0.00
01 Sprinkler Fee: 0.00
Base Fee,, 0.00
Total Plumbing Penh F $0.00
End Base Plus Per Fees
205000 30..00 3.0% 1 0.0.0
100,$000 630.00 2.0% 1 0.00
2007000 2230.00 1,0% 1 0.00
9919999999 3230. 0.5% 1 0.00
Meter
$125.00
$195.00
$1,327.79
$11868.00
$216,18-50
Sewer Rate
$575.00
e
$235.0-0
Total Plumbirng Permit Fee:
Number of
Bldgs
$182.00
$182-00
$49-62
$39.54
Total Water Meter arm Parts:
Y 7 2003
Acres
0.00
Mob
P1 0.00
Unit
Total All Fees:
$24.30
$33.2
01-322,11
1--322.17
01-322.14
$0.00 1-32214
$0.010
$0,00
$0.00
$0.00
$0.00
.
00
11 to
9M
01
6
01
-346.20
34-346,30
-347.30
-346.30
-347.30
34-346.30
35-347.30
0.00 4-346.42
$0.00
$0.00
$1,224.4'1
-347.42
NUMBER 1CONSTRUCTION TYPES
1 Residential -Wood Frame
Residential -Masonry
jBasement-Serni Finished
Base ment-Unfinish�ed
Apartments -Wood Frame
Apartments -Masonry
Private Garage -Wood Frame
Pn4vate Garage -Masonry
Commercial
10 Commercial Parking
0
Price
$22.16
$0.75
$0.65
Construction Cost Factor
Factor = idnf, Com rl,l
Factor = B (Mini Warehouse)
Factor = (S 11 only building
Quantity
Descripition
Two Inch Meter
CF31-77 Brz Mtr Flange
5/8X2-1/4 Flange Soft
Meter Flange Nut
2x1Gasket
Three Inch Meter
Std C1 Comp Fiance /Ste of
Zinc Pttd Hex Snit & Nut Kit
3x1 FI, Ring RR Gasket
MAI3I
$14,60
$63.80
$72.4D
$24.30
$27'.0
1 $33.201
Price
$44.32
$3.00
$1.00
$1.30
$3,Q4
$39.54
0