Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00018 - Moody Canyon Farms - Airplane HangarCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Insp�ctians: Far on -side construction, from time to time the building Official, upon notification from the permit holder or his agent, shad make or case to be made any necessary inspections and shall either aoorove that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1. LAYOUT: Lot canners naked, staking in place for building, prior to excavation: 2. FOOTING, Commonly made after poles or piers are set or trenches or basement areas ars excavated. FormS2nd horizontal reinforcing tied in place, vertical reinforcing cut and an fob site or tied in place. 3. FOUNDATION INSPECTION: The foundation insDection shad included excavations for thickened slabs intended for the support of bearing walls, partitions, structural support, or equipment and special requirements for wood foundations. All forms and reinforcing steel, etc.., shall bein place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are sed, and prior to framing inspection. 5. TRUSS INSPECTION.h, Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, firestooping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are typed and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All'systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: 10. 12. After forms are set, prior to placing concrete. FINAL INSPECTION: Commonly made after the buildingis completed and ready for occupancy . OCCUPANCY PERMIT: Issued when, OTHER INSPECTIONS: on final inwection, building is ready to occupy. In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced bv the building department. INSPECTION CARD the permit holder or his agent shall fast the inspection record 0n the fob site in an accessible and conspicuous place to allow the bUilding official to make the required entries. The record 5hall be maintained by the permit holder until the final inspection has been made and approved- [ have read the above and will comply in my reQuests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767 Building: 359-3020 ex 326 or 313 Plumbing; 359-3p20 ex 326 or 313 or 359-3Q34 Signature: 6E.1't'e4JrA'1 41C - -, C' �-, Date. n 3