Loading...
HomeMy WebLinkAboutT2M DOCUMENTS - 03-00015 - BYUI - Student Housing 16 Buildings (160 units).16 U-1 =:. --- - a w -L3 I 44 U.J *ft 1, 1D 3"" -i'Fleri Project: BYU Idaho Student Family Housing Project Na: 03-0001 Mix No.: 902 Report No.,: 1 Contraitvr: R. E. Beck Construction Supplier: Walters Ready Mix Structures; Footings &stem walls Mirx Design Components Mix Design Proportions Cement Type I & II LA 4801bs. Water 29 gals./2-41 Ibs. C.A.: 3/4" Rock J -F 96 ASTM C 33 1794 lbs, F.A.: Sand MA -22 ASTM C 33 1260 lbs. MB -AE 90 ASTM C 260 1 oz./cwt. Pro.krete N ASTM C 494 3oz./cwt. cement Sand/Aggregate Ratio 43% W/C Ratio .50 Air Content 5.0% +/-lwo% Slump 4,• +/41-f SF% -DAUPM p eaffied Fc (p 2500 ID CYL coff. Date TeS t Test Taftl compnm-v Ca Fract., Diam, & Faict Area cast ftp Date Load Sbvngth HWg.ht Uw 1.00 28.26 4-14 7 4-221 52000 1840 Neo. Shear 0999A 6ffxl2"1.00 28-26 +16 7 4-23 53000 1 875 Neo. Shear 1000A 6'0'xl2ff 1.00 28.26 4-17 7 4-24 71500 2530 I%W. Shear 1001A 6Nlr 1.00 28.26 4-18 7 4-25 64500 2285 Neo. Shear 1002A 6N12" 1.00 28.26 4-21 7 4-28 52000 1840 Neo. Shear 1003A VxlTy 1.00 28-26 4-23 7 4-30, 950mi 3360 Neo. Shear 1004A 6"x12" 1.00 28.26 +29 7 5-6 55000 1945 Neo. Shear Neo.= Neoprene cap. Sul .= Sulphur cap ASTM C 617 ig Remarks. Reviewed By: Bret L McGowan/President CC: BYU Idaho,, City of Rexburg, Walters Ready Mix, JHS Architects, Bateman Hall, R.E. Beck Const, r,q r COMPRESSIVE STRENGTH SUMMARY Project: BYU Idaho Student Family Housing Project No.: 03-0001 Mix No..: 902 Report No..: 2 Cvntrac#vr: R. E. Beck Construction Supplier* Walters Ready Mix 0 Structures: Footings &item wails Mix Design Components Mix Design Proportions Cement Type I & Il LA 480 lbs. Water 29 gals./241 lbs. W C.A. a 3/4" Rock 3-F 96 ASTM C 3.3 1794 lbs.. F.A.: Sand MA -22 ASTM C 33 1260 lbs. MB -AE 90 ASTM C 260 1 Oz./cwt. Prokrete N ASTM C 494 3oz./cwt, cement Sand/Aggregate Ratio 43% W/C Ratio .50 Air Content 5.0°k +/-1.0% Slump 4!41 +/-1" f'C = 2500 11D CYL CAW. CO- ENft TeA Test Total Campo Cap Fra re Wim. FacL Area Cast Age Date Load Strength & Height &,M B 6'0'x12 1.00 28.26 4-14 28 5-13 80000 2830 Neo. Shear 0998C 6N12'Y 1.00 28.26 4-14 28 5-- N1 " N1.2" 1.00 28--26 4-16 28 5-14 96000 3400 Neo. Shear 0999C 6J)12" 1.00 2826 4-16 28 5-14 82000 2900 Neo. Shear 10000 6"X1ZIW 1.00 28.26 4-17 28 5-15 72000 2550 Neo. Shear 78000 2760 I. Shear 100K 6"xl2ff 1.00 28.26 4-17 28 S-15 1001B 6'vx1.2 1.00 28.26 4-18 28, 5-16 92000 3260 Neo- Shear 10010 6N12" 1.00 28-26 4-18 '28 5-16 97000 3430 Neo. Shear 1002B GN12" 1.00 2-8.26 4-21 28 5-19 96000 3400 Neo. Shear 1002C 6J"x12" 1.00 28.26 4-21 28 5-19 86GOO 3040 Neo. Shear 100313 67x12" 1.00 28.26 4-23 28 5-21 119000 4210 Neo. Shear 1003C 6*"xl2" 1.00 28.26 4-23 28 5-21 118000 4180 Neo. Shear 1006A 6"xU" 1.00 28.26 5-2 7 5-9 76250 2700 Neo. Shear 1007A 6'flk12" 1.00 28.26 5-6 7 5-13 76250 2700 Neo. Shear 1008A 60x!2" 1.00 28.26 5-8 7 5-15 62500 2210 NieO. Shear ISA 6"XJ-2'rJr LOO 28.26 5-12 7 5-19 51000 1810, Neo. Shear Neo.= Neoprene cap. SLd.= Sulphur cap ASTM C 617 Remarks;, S& RevilO%.-....ff By: Bret L. McGowan/President CC: BYU Idaho, City of Rexburg, Walters Ready Mix, JHS Architects,, Bateman Hall ;i 7 COMPRESSIVE STRENGTH SUMMARY Pf'D . fEf C) r_Yv t til D 19.1 0 ' "--'866 '_5 Project: BYU Idaho Student Family Housing Project No.: 03-0001 Mix No,,: 902 Report No.: 3 co re. R. E. Beck Construction Supplier: Walters Ready Mix Structures: Foobrugs &stem walls Mix Design Components Mix DesignProportions Cement Type I & H LA 480 lbs. Water 29 gals./241 lbs, C.A.: 3/4" Rock 3-F 96 /15TH C 33 1794 lbs. F.A.: Sand MA -22 ASTM C 33 1260 Ibs. MB -AE 90 ASTM C 260 1 oz./cwt. Prokrete N ASTM C 494 3oz./cwk cement Sand/Aggregate Ratio 43°!0 W/C Ratio .50 Air Content Slump 5.09'0 +/-10% 4" +/-l'F" P_ IflEfI Cc (Psis= 2500 31D Lwyo Corr. CA Date Test Test Total compa Cap Fracture Diem. FacL Area Cftt Age Date Load Strengt1h a Height 1004B 6"xl2ff 1.00 28.26 4-29 28 5-27 94000 3320 Neo, Shear 1004C 6N12" 1.00 28.26 4-29 28 5-27 94000 3320 Neo. Shear 1006B 6wxlr 1.00 28.26 5-2 28 5-30 97000 3430 Neo. Shear 1006C 6"x1r 1.00 28.26 5-2 28 5-30 101000 3570 Neo. Shear 1007B 6N1 " 1.00 28.26 5-6 28 6-3 1040,00 4210 Neo. Shear 1007C 6N12" 1.00 28.26 5-6 28 .6-3 101000 3570 Neo. Shear 1008B 6N12" 1.00 28.26 -5-8 28 6-5 119000 4210 Neo. Shear 1008C 6"x12" 1.00, 28.26 5-8 28 6-5 115000 4070 Neo... Shear Ims 612"" 1.00 28-26 5-12 28 &9 110000 3890 Neo. Shear 1009C 6"x127 1.00 28.26 5-12- 28 6-9 112000 3960 Neo. Shear 1010A 6N12" 1.00 28.26 5-19 7 5-26 92.000 2700 Neo. Shear 1010B 6N12ff 1.00 28.26 5-19 28 6-16 130000 4600 Neo. Shear 1010C 6"rx12 1.00 28.26 5-19 28 6-16 134000 4740 Neo. Shear 1011A 3xi2" 1.00 28.26 5-27 7 6-3 74000 2620 Neo. Shear 1012A 6"xUff 1.00 2-8.26 6-9 7 6-16 94000 3330 Neo. Shear 1013A 6"X12" -1.00 28.26 6-10 7 6-17 71000 2510 Neo. Shear Neo.= Neoprene cap. Sul.= Sulphur cap ASTM C 617 Remarks: ANIAN Revi.... By: Bret L. McGowan/President CC: BYU Idaho., City of Rexburg, Walters Ready Mix,, 7HS Architects, Bateman Hall, R.E. Beck Const. vp COMPRESSIVE STRENGTH SUMMARY P.O. Box 143 208-403-1866 Rexburg, JID 83441 Project BYU Idaho Student Family Housing Project No.: 03-0001 Mix No.: 902 Report No..0 4 Contractor. R. E. Beck Construction Supplier: Walters Ready Mix Structuress.. Footings & stern wails Mix Design Components Mix Design Proportions Cement Type i & R LA 480 lbs,. Water 29 gals.,/241 lbs. C.A.: 3/4" Rock J -F 96 ASTM, C 33 1794 lbs. F.A.: Sand MA -22 ASTM C 33 1260 lbs. MB -AE 90 ASTM C 260 1 oz./cwt. Prokrete N ASTM C 494 3oz./cwt, cement Sand/Aggregate Ratio 43-Ok W/C Ratio .50 Air Content 5.0% +/-1.0% Slump 4r' +/-1„ Specified fcPM)= 2500 ID Cot CAM. CY* Date Test Test Toil compe Cap Ferre Diam, FacL Area Cast Age* Dam Load Stmngth Height 1 11 B " 1 "'r x ,00 � -r27 28 6-24 129000 4560 Neo. Shear 1011C 1.00.!- 6-24 126000 460 Neo. Shear 1012E 6"x 1 100 28.26 6-9 28 7- 119200 4220Shear 10120 1" 1.00 28.26 6-9 28 7-7IL21400 4300 Neo* Shear 1013E x12 1.00 28.26 6-10 28. 115200 4080 Neo. Shear 1013C 'N1 1.00 28.26 610 28 7-8 114400 4050 Neo. Shear 1 "x1 1.00 . 2-6 6-1 6-19 65000 2300 Neo Shear 6 12"� 1# 1 6-24 66000 2330 Neo. Shear Neo. = Neoprene cap.. Sul . = Sulphur cap ASTM C 617 Remarks; Reviewed By. Brei L. McGowan/President CC: BYU Idaho, City of Rexburg., Walters Ready Mix., JHS Architects, Bateman Half, R.E. Beck Const.. it COMPRESSIVE STRENGTH SUMMARY P.G. Box 143. 208-403-1866 F,*,exburg, ID 83441 Project BYU Idaho Student Family Housing Project No.: 03-0001 Mix No.: 902 Report No.: 5 Cantradbor: R. E. Beck Construction Suppliers. Wafters Ready Mix Structures; Footings &stern wails Mix Design Components Mix Design Proportlons Cement Type I & II LA 480 lbs. Water 29 gals./241 lbs. C.A.. 3/4" Rods J -F 96 ASTM C 33 17941bs. F.A.: Sand MA -22 ASTM C 33 1260 lbs,. MB -AE 90 ASTM C 260 1 Oz./cm. Prokrete N ASTM C 494 3oz./cwt cement Sand/Aggregate Ratio 43% W/C Ratio .50 Air Content 5.10% +/-1.0% Slump 4" +/-l'r" f'C ID 4DAm CAWs Coo Daft TeSt To* TOW cmp.- Cap Diam. FacL Apm cast Age Date Load SbwUJ" HekAt 1014B 6"x12:ff 1.00 28-26 6-12 28 7-10 113000 4OW Neo,. Shear 1014C 6"kJL2 1.00 28.26 6-12 28 7-10 117000 4140 NeD. Shear 1015B 6Nir 1.00 28.26 6-17 28 7-15 83000 2940 Neo. Shear 10150 6NIZ" 1.00 28.26 6-17 28 7-15 91000 3220 Neo. Shear 1017A 6*1x1Zff LOO 28.26 6-24 7 '7-1 52000 1840 dV Neo. Shear 1019A GNU" 1.00 28.2-6 6-25 7 7-2 71000 2510 Neo. Shear 1.02 6 Ak12" 1.00 28.26 7-1 7 7-8 74000 2620 Neo. Shear 1026A 6"x!2" 1.00 28.26 7-9 7 7-16 71000 2510 Neo. Shear Neo.= Neoprene cap. Sul.= Sulphur cap ASTM C 617'' Remarks: Reviewed By. Bret L McGowan/President CC: BYU Idaho, CO of Rexburg, Walters Ready Mix, JHS Architects, 'Bateman Hall, R.E. Beck Const. COMPRESSIVE STRENGTH SUMMARY ?.0. Sox 143 208-40s-1866 Ri.m.lxburq, ID 8341-40 Project: BYU Idaho Student Family Housing Project No.: 03-0001 Mix No.: 902 Report No.: 6 Contracts: R. E. Beck Construction Supplier: Walters Ready Mix Structures: footings & stem walls Hix Design Components Mix Design Proportions Cement Type I & II LA 480 lbs. Water 29 gals,./241 lbs. C.A.. 3J4" Rock J -F 96 ASTM C 33 1794 lbs. F.A.: Sand MA -22 ASTM C 33 1260 lbs. MB -AE 90 ASTM C 260 1 oz./cwt. Prokrete N ASTM C 494 3oz./cvvt. cement Sand/Aggregate Ratio 43% W/C Ratio .SO Air Content 5.096 +J-1.00/0 Slump 4ff Spedfied fc JE!Ei CY. = 2500 fir. CYL Date Test Test Total al Cap FracWre ID Dimi FacL Ama Cas Age Date - Lead Height 102613 6ftxl27 1.00 2-8.26 -09 4100 Neo. Shear 1026 6 12" 1.00 2.26 -09 28 8-06 121000 4280 Neo. Shear 1 "x1" 1.00 28.26 7-11 7 7-1865000 2300 Neo. Shear 1027B "'xlm 1.00 28-26 7-11 2-3 -08 106000 3750Neo. Shear 10270 6N12" 1.00 28.26 7-11 28 B-08105000 3710 Neo. Shear 1028A 6N12" 1.00 28.2-6 -11 7 7-182620 Neo. Shear 1 28Bc1 .f 1.00 28.26 -11 28 8-08 1330 4700 Neo. Sir 10280 67xl2 1.00 28.267.11 28 8-08 132000 4670 Neo. Shear 1036A 6 x.1 � 1. -22 7 7-29 73000 2580 Neo. Shear 10368 6N12ff 1. -2 28 8-1997000 3430 Neo. Shear 6C 6"wx12. 1.00 28+26 -22 28 8-1992000 3250 Neo*'Shear 1046A 1 m LOO 28.26 8-04 7 8-11 72000 2550 Neo. Shear 1" 1.00 28.26 8_04 2 9-01 110000 3890 Neo* Shear "xl'w 1.0028.26 B-04 28 -1 1400 -0 4030 Neo- Shear 1047A 6 12" 1.00 .2.6 8-05 f 8-12 78000 6 Neo- hear 1047 0'xi. " 1_00 28.26 3400 Neo. Shear 1 '�1 ff 1.00 28.26 -OS 28 9-02 99000 3SOO Neo* Shear Neo.= Neoprene cap. Sud..= Sulphur cap ASTM C 617 Kamm: Reviewed By*. Brei L. McGowan/President CC: BYU Idaho, City of Rexburg, Walters Ready Mix, JHS Archifects, Bateman Half, R.E. Beck Const. COMPRESSIVE STRENGTH SUMMARY P , G. Box 143 208-403-1866 Rexburg, ID 3344t" Project: BYU Idaho Student Family Housing Project No.: 03-0001 Mix No.,: -902 Report No.: 7 Contractor: R. E. Beck Construction Supplier: Walters Ready Mix Structuress. Footings &stem walls Moc Design Components Mix Design Proportions Cement Type I & H LA 4801bs. Water 29 gals./241 lbs. C.A.: 3/4" Rock )-F 96 ASTM C 33 1794 lbs. FA: Sand MA -22 ASTM C 33 1260 lbs. MB -AE 90 ASTM C 260 1 Oz./cwt. Prolvete N ASTM C 494 3oz./cwG cemnt Sand/Aggregate Ratio 43% W/C Ratio .50 Air Content 5.040 +/-1.0% Slump 4" +/-I-F" Remarks: Reviewed By: Bret L. McGowan/President CC: BYU Idaho, City of Rexburg, Walters Ready Mix,, )HS Architects, Bateman Hall, R.E. Beck Const. 6"x12 1.00 28.26 7 8 1 3 68000 2410 Neo,. Shear 10480 6nx12 1.00 28.26 28 9-03 118000 4170 Neo. Shear 1048C 6'wxl2 MY .00 28.26 28 9-03 115000 1 h Q70 Ne,. Shear 1-054A 6N12'w 1.00 2-8.26 7 8-18 80000 2830 Neo. Shea, 1054B 61"X12" 1.00 28.26 28 9-w 98000 3470 Neo. Shear 1054C 6`x12"r 1.00 28.26 28 9LO8 1 102000 T. Neo. Shear 1055A 6'%xl2 1.00 1� 28.26 7 3010 Neo1w Shear 1055B 6JwX11228.26 28 9-08 109000 3860 Neo. Shear 1055C 60x12 1.00 28.2 28 9-08 112000 39W Shear30 11060A 6m"x12 1.00 28.26 7 8-25 80000 28Neo. Shear 1074A 6"'xl 1.0 0 28.26 7 9-02 99M 3500 Neo. Shear M ITE "a Wei Remarks: Reviewed By: Bret L. McGowan/President CC: BYU Idaho, City of Rexburg, Walters Ready Mix,, )HS Architects, Bateman Hall, R.E. Beck Const. P.O. Box 1.43 208-757-9172 Rexburg, ID 83440 Project: BYU Idaho Student Family Housing Project No.: 03-0001 Mix No.: 902 Contractor: R. E. Beck Construction Suppliers. Walters Ready Mix W Structures: Footings &stem walls Mix Design Components Mix Design Proportions Cement Type I & Il LA 48o Ibs. Water 29 gals./241 lbs. C.A.: 3/4" Rock )-F 96 ASTM C 33 1794 Ibs. F.A.: Sand MA -22 ASTM C 33 1260 lbs. MB -AE 90 ASTM C 260 1 Oz./cwt. Prokrete N ASTM C 494 3oz./cwt, cement Sand/Aggregate Ratio 43% W/C Ratio .50 Air Content 5.0% +/-.1.0% Slump 4" t/-1" Specified fc -(Va- W 2500 CV11 CA Date Test Test Total comp. Cap Fracture Diam, FacL Area Cast Age Date Load ga"qth & Height 1017B 6ffxl2 Ar 1-00 28.26 6-24 28 7-22 120000 4250 Neo. Shear 1017C 6 .. x12" 1.00 2:8.26 6-24 28 7-22 113000 4000 Neo. Shear 1019B 6"x12" 1.00 28.26 6-25 2-8 7-27' 130000 4600 Neo. Shear 1019C 6r'x12" 1.00 28.26 6-25 28 7-27 126000 4460 Neo, Shear 1022B 6N12" 1.00 28-26 7-1 28 7-29 100000 3540 Neo. Shear 1022C 6"xl2ff 1.00 28-26 7-1 28 7-29 104000 3680 Neo. Shear 1060B 6N12" 1.00 28.26 8-18 28 915 98wo 3470 Neo. Shear 1060C 6"tx12r'r 1.00 28.26 8-18 28 9-15 110000 3890 Neo. Shear 1074B 6"x12'v 1.00 28.26 8-26 28 9-23 108000 3820 Neo. Shear 1074C L00 28.26 8-26 28 9-23 107000 3780 Neo. Shear Neo.= Neoprene cap. Sul .= Sulphur cap ASTM C 617 Remarks: Reviewed By: Bret L. McGowan/President CC: BYU Idaho, City of Rexburg, Walters Ready M6c, JHS Architects., Bateman Hall, R.E. Beck Const. � 2 L�0 R 9 P.O. Box 143 Rexburg, ID 83440 208-757-9172 CHANGE ORDER SUMMARY Project: BYU Idaho Student Family Housing Project No.: 03-0001 a. a�.s r�.a aaa aAeaa�Rra�i.: Y.a �a�• �+tea .� iaav�aa 7snr e�: T ed.n.a• � Architect: JHS Architects ContraCtor: Batemanw"Hall Inc. Na. D1: The following changes were authorized,.. 1. Rock Removal at SW corner of site based on revisions to entrance elevations. 2 -Add a Manhole section at MH#l. 3. Mass rack excavation beneath building #f4. 4. Werk in right of- way requited by the City of Rexburg. 5. Credit for Permits and Fee Aflowances, X10. D2: The following changes were authorized... I. Revise size of West entrance culvert. Z. Add culvert (15"} at East entrance. 3. Add stub out to south for future norm water. 4. Modify communications and TV conduit system per Owner. 5. Add approximately 232 LF of storm sewer- shown as existing on site drawings. Na. 03: The following changes were authorized.,. 1. Rock removal below Building #?, 2. Rock removal below Building #7. 3. Rock removal below building #1+D. 4. Rack removal below Building #i3. 5. Revise water valves to street, delete S valves. b. Cut and bind carpet base. 7. Revise Storm Drains at Building #3 and Building #7. 8. Upgrade Ultrasonic Flow Meter to ISCO 4210. 9. Upgrade Toilet Accessories 10. Replace approximately 40' of Footing and Foundation at Building #5 Na. D4: The following changes were authorized.., 1. Raise parking grace east of #8 & #11 to cover existing S.D. Z. Adjust electrical service for substation trencher to crass.. 3. Changs makeup grilles at center units to Y8" x 6"'. 4.. Credit for exhaust fans duplicated. S. Credit for transformers selected by Owner. Reviewed By: Bret L. McGowan/President CC: BYU Idaho, City of Rexburg, JHS Architects., Bateman Hall .L ARCH. SUPPw INST. SUMMARY P.O. Box 143 ...... Rexburg, ID 83440 208-757-9172 Project: BYU Idaho Student Family HousingL Architect: ]HS Architects Project No.: 03-0.001 Contractor: Bateman -Hall Inc. No. U1: The civil information given to the Contractors survey shows the buildings 2" larger in each direction than the foundation plans. This is due to a 1" overhang of the brick all around the buildings. The civil layout received by the surveyor indicates'the outside of brick dimension. The Contractor's surveyor should "split the difference"'.. No. 02: The 18."' culvert at the NW corner of the site needs to he placed deeper. The invert at the east end of the culvert needs to be at approximately the grade of the existing d -itch at the east end of the culvert. The culvert should be graded'at a 5°fQ slope and the west end should be raked for about 8 ft, to allow the water to flow out of the west end. No. D3: Shop Drawing and Submittal Reviews have prompted the following minor revisions.... 1. Refer to Wall Section IO/A6.5. The top of Stud Wal!/Truss Bearing elevation at the Utility Rooms on the Rear of the townhouse unity is to be 11.0f - 5 1/2'• above the main floor of the townhouse units. Change the 10?'- 9"' dimension to 10' - 5 1/2"'10 2. Refer to dwg. A3.2. Change the truss designations for truss types 3 & 4. Type TR3 will change t�o TR4 and hype TR4 will change to TRI 3. Refer to column detail I/A3.2. Revise the Truss Bearing elevation to 24' - 0"' above the first floor of the center units. No. 04; The attached information was requested by the contractor. This information pertains to Building #8 and the revision made by the Addendum #1 during the Kidding period.. See attached ASI -4 dwg,"s #1 & #2. No. DS: The attached drawing answers a question rased earlier by the contractor and pertains to Building #5. See attached ASI -5 dwg. #1. No. D6: Shop drawing reviews have prompted the following revisions to dwg. A2.1 Refer to dwg. A2.1, upper right hand corner � Footing & Foundation Plan far buildings #6, #9 & #13. The T.Q.P. elevation at the left hand side of These three buildings should be 961. 4" not 96" - 0'". The two left handed piers of these buildings should be at 96' - 4"'. This change will also affect Submittal #05-2, dwg. A131 at the upper right hand corner. No. 07. Shop drawing reviews have prompted the following revisions to dwg, A2.2 Refer to dwg. A2,,2, lower right hand corner, Footing & Foundation Plan for building #15. The T.O.P. elevation at the right hand side of this buildings should be 103'- 8"' not 100' - Off, The tap of the two right hand piers at this building will be 103' - $", The top of boating at these piers should be at elevation 99"- 8"" . This change will also affect 5ubmittai #D5-2, dwg. AB2 at the center right hand area of the dwg. 0 ARCH. SUPP. INST'. SU�MMARY P it 0 . Box 143 ReAurg, ID 83440 208-757-9172 Project: BYU Idaho Student Family Housing Project No.: 03-0001 Architect: JHS Architects Contractor: Bateman -Hall Inc, Na, a8: Resolution of framing questions.., Item 1. Shear Wall Location: The location of shear wail hold -clowns at the furnace raom closets are incorrectly shown on Addendum No. 1 sketches. Correct location is the rear of the closets and over the bearing wall footing. See attached sketch ASI -8-1. Item 2, Center Shear Wall Hold -dawns: The center party wall is a shear wall on both sides at the two lower levels and thus needs anchors at both ends, dee attached sketch ASI -8-1. At exterior foundation wall, an alternate detail is included herein which would eliminate the two Simpson hold-downs on the exteriorised of the double shear wall items 3. J Bolts: .]HS has re��ewed the use of a 7j8" x �.�" J boil for use with hold -dawns. the capacity of the J bolt is not adequate for PHDS's or PHD6"s. Use 28r/1 deformed anchors as scheduled. Idem 4. Wind Lift: a. At bottom of walls, SPI's will not be required if wail sheathing laps past the plate and is nailed to either the rim foist or wail studs below the floor system. Suggest use of 9 ft, or 10 ft. long sheathing. Any horizontal joints in sheathing panels which occur over the stud walks must be solid blocked for shear nailing. b. At tap of wars, along the Truss bearing side, an H10 hard -dawn at each tress and to the wall plates is adequate to transfer uplift load's into the waif below, The H10 may be mounted at inside face of wall plates or at the exterior face. SP2-'s at each stud palate is not necessary. C. At the top of wally along the gable ends of the buildings, an SP2 hold-down between plates and spud below is required due to extreme uplift loads. 4utloakers need to be attached to the plates with an HIO yr H7 as scheduled. Item 5. Foundation Anchor Bolts: All wafts with sheathing are carrying some shear loads. Thus, those wolfs need anchor bolts sized and spaced per the "Shear Wail Schedule". The Shear Wail Schedule shows 5/8"' x 12"' AB at various spacings. The drawings show the same and refer to the schedule for spacing except in two cases.,. Wall section 7/A6.4 and Section 8/A6A, Wall Section 8/A6.4 agrees with the Schedule at 48" o.c. At wail Section 7/A6.4 either the scheduled 5/8" x 12"' at 48" o,c, or the drawing 5/8"' x 10" at 32" v.c. may be used. At wolfs not shown with sheathing, anchor baits shall be contractor standard 48" a.c_ and may employ anchor devices other than bolts and may be 'Jz" diameter if desired. N9, 09: Floor slab control joints. The attached plan shows a layout of floor, coi joints for a typical building- See attached sheet ASI -9 Page 2. L ARCH. SUPP, INSTm SUMMARY P. 0 Box 143 Rexburg, ICS 83440 208-757-9172 BYU Idaho Student Family Housing Architect: JHS Architects project No.: 03-0001 Contractor: Bateman -Hall Inc. No. IQ: GFS Soffit Outlets. The attached plan shows a layout of GFI duplex outlets in the soffits of a typical building. See attached sheet ASI -10 Page 2. No. 11: 1. Framer proposed to use 1 31a.' x 117/8' LVL headers at townhouse stair in lieu of the 85's shown. This change is approved. 2. Transverse header nearest the townhouse entrance door shall extend to nearest continuous floor joist. At the floor joist, the header shah be supported with a HU11 min, F oist hanger or bitter. Floor joist shall be reinforced with full thick shear blocking per joist manufacturers recommendations. Floor joist shah be a J1 or ]3 in lieu of adjacent JA's and may,be procured by swapping a )2 with a 31 at the head of the stair. 3. Transverse header at the tap of stair shall bear on the wall below. Header or beam from kitchen walk shall bear an wail below. 4. Longitudinal headers showy without sizeidentifier may be 12 joists at top of wall or LVL at contractor's option. 5. In order for stairway wall to support the two transverse headers, the header over the pantry closet doors needs to be a minimum of (2) Z' x 6-'s. No. 12: Observation #14 Issues... Issue#1: FOUNDATWON WALL REPAIR. See attached sketch ASI42 #1 for repair of "swaled" foundation walls. Issue#2: DRAG STRUT SPLICING. A single drag strut option is offered if material is full length. Two splicing options are shown. See attached sketch ASI -12 #2 & #2-A, Issue#3: STAIR SKIRT STRINGER. Framing contractor discussed several construction options at stair skirting. The attached sketch ASI -12 #3 shows agreed upon option. Issue#4: HEADER LOCATION. At Double Drag Strut, window header shall be located at inside face of stud. See attached sketch ASI -12 #4. No. 13: Blacking at the end of trusses, See attached drawing. This detail would replace I/A4,1 on the construction documents, This detail could be used at every third truss spare. If this detail is not used, then detail I/A4.-1 on the Construction documents Shall be used. No. 14: 1. Duct Penetrations through the delta 22 walk at rear of Utility Closets, The sheathing and nailing for the 18" x 1211 duct through the delta 22 shear wall should be handled as indicated on the response to RFI -27. The nailing around the duct opening would be 2_1" o.c, Add shot stud framing next to the duct if it is more than 4" to the nearest stuff. Z. 14"" x 14" Return Air from Dinging Room to Mech/Utility at Townhouse Units. Create a framed opening at the exterior walk for the duct penetration. Use the edge PnOw Box 143 Rexburg, ID 83440 "Wir 208-757-9172 ARCH. SUPPO INST. SUMMARY Project: BYU Idaho Student Family Housing Project No.: 03-0,001 •-a � 7} .li' 6i TlOiiii�ao'_ Mi fta- Architect: JHS Architects Contractors Bateman-Half Inc. No. 14: 2. (Continued) nailing all around the opening. Avoid a rim joist splice above the return sir area. The sheathing on the outside of the wolf should run up along the rim joist and be nailed to it, A foist hanger at any joists that is over the duct should be used. Again, the response to RFI -27 works for this opening too. 3. Dryer Vent at Bottom Floor Center Units. Provide 2"' x approx. 24" furred area at the turner of the gantry #110 to allow the dryer to pass behind the blocking in the wolf behind the W/D. The upper units should not be a problem since the vent can drop dawn and doesn't have to pass behind the blacking. 4, Shower Curtain Rod Blocking. Provide solid the 2 x 6 blocking at the end walls of the tub enclosures at outside edge of shower where the god ends would be placed. Top of the blocking should be placed at 72"" AFF. (Nate: Please remember to insudate the delta 22 wars before installing the sheathing on the backside.) No. 15: The attached details wail clarify the construction of the corners of the gable and the raoFs where they meet the soffits and the framing of the entry canopy soffits, See attached details ASS -15-1 & ASI -15-2. Na. 160 The attached drawings will give the elevations for the fence posts at the extreme east end of the site. The elevations for the balance of the fence along the north side of the site will follow as soon as possible. See attached drawing ASI -16-1. No.. 1i: 1. The attached drawing shows elevations for the brick ledges at the brisk posts and the wrought iron fence along the north side of the site. Drawing ASI -127-1 incorporates dwg. ASS -1C-1 and corrects the elevation at the far eastern brick post. The fence follows a straight slope along the north side of the site and is at a higher elevation than shown an the construction documents. This reduces the amount of excavation, etc, at the fence location. The fence has also been shortened by two posts and two wrought iron panels. This is also a credit item to the project. 2. The concrete mow strip between the brick pasty will be set with the top at 6"" below the brick ledge on the polis. 3. The sidewalk elevation will follow and be adjacent to the mow sfr;p. (6" below the brick ledge at the posts) 4. The concrete foundations for the posts may rest on the existing lava rock. The lava rock must be sound and solid. If the lava rock is above the tap of the post footing. The concrete pier can utilize the lava rock in lieu of a footing. The vertical bars would than be drilled and epoxied into the lava rock. The surface of the rock must be gleaned prior to placing the concrete jest as where the building foundations rested directly on the rock. Reviewed Sy: Bret L. McGowan/President CC: BYU Idaho, City of Rexburg, JHS Architects, Gateman Ha1I IL V ME PRO.POSAL REQUEST SU'MMARY P.O. Box 143 Rexburg, ID 83440 208-757-9172 Project: BYU Idaho Student Family Housing Project No.: 03-0001 Architect; JHS Architects Contractor: Bateman -Hall Inc.. No., al; Provide an 18 inch HDPE culvert approximately 110 feet long at the existing grade in the bottom of the existing barrow pit along 7' sough across the new entrance drive to the Student Housing Project. The City of Rexburg will tie to this culvert when they reconstruct 7 t" South in the future. No. az: Add approximately Z32 linear feet of HDPE storm drain line,, When the existing storm drain line was excavated, it was determined that the end of it was not as detailed in dwg. C4.1. The actual end of the existing storm line is located approx. 232 feet south of SDM H # I . Con nect the new line to SD M H # 1 with a matching size of HDPE and grade it at approx. 4.9°/0 as per PR#2, Na. 03; Add a 12 inch diameter storm drain stub dine from SDMH #7 on dwg. C4,3 for possible future developmeft. This new stub dine will extend 70 ft. from SDMH #7. extend the stub from SDMH #7 at approx. 1°Ia grade and mark the end with a marker per detail M on dwg. CS. I The invert at the end of the stub should be set at 4967.84, See attached sketch. No. d4: Modify the conduit system formerly intended for the telephone and CATV as shown on the attached drawing. conduits will be stubbed -up in the location that were formerly telephone and CATV pedestal locations, See attached sketch. No. 05: defer to dwg. C4. 1 Change the culvert along Pt' South at the extreme west corner of the site from a 15 inch diameter to a 18 inch diameter culvert. This culvert will be approx. 73 ft. long Na. 06. Refer to dwg. C3.1 Delete the 4" water shut-off values that were to be 5 f#, from each building. (16 valves - See addendum #2) Provide (S) 4"" water shut-off Wares that are to be located within 3 ft. of point where the building service lines connect to the water main line in the parking lots,. No. Q7: Remove mass rock beneath Building #i4 as required to achieve proper building elevation, the volume of rock has been measured and calculated by the Owner and earthwork contractor representatives. the calculated volume of rock to be removed is 8015 cubic feet. No. Q8: Revise the outside air grilles over the doors of the Utility closets at the center ked units from 12"" X 12'r t. 18" x S". Refer to dwg. MIJ & M1.2 Plan Nate 7 and dwg. M2.I Plan Note 4. W PROPOSAL R6 P.O. Box 143 ReAurgir ID 83441 20.8-757-9172 Project: BYU Idaha Student Family Housing Project No.,a 03-0001 VEST SUMMARY Architect: JHSArchitects Contractor: Bateman -Hall Inc., A� 6 T f flKII.M lI� �.e}!T f ERF4 m3'�C h No., D9: Change the closet, pantry., linen and washer/dryer closed shelving from fixed and adjustable painted particle board to fixed and adjustable 3I4" melamine panel product refinished shelving units as follows... Closet 517elving, Refer to detail 4/A 10 m 3 . Provide 314" melamine paned product verticals and shelving with 0.18"" PVC edge banding. Two top shelves should be fixed, Five bottom shelves should be adjustable. Closed rods should he in two section s with a "wall bracket"at each of the four ends. A 4"' toe kick should be provided. Pantry Shelving: Refer to detail 5 & 7/A10-3. Provide 3/a" melamine panel product verticals and shelving with 0,18"'r PUC edge banding. Tap and bottom shelves should be fixed and the dour intermediate shelves should be adjustable. Space at the inside corners of the shelving must be usable and not boxed in. Linen Closet Shelving. Refer to detail 6/A103. Provide3/4"" melamine panel product verticals and shelves with 0.18"' PVC edge banding. The six shelves should be adjustable. A 4" toe kick should be provided. W3sherlDrYel-Shelving- Refer to detail 8/A10.3 and attached sketch PR -9-1. Provide3/4"' melamine panel product verticals and shelves with 0.18"' PVC edge banding. The shelving units should be a 12"" rectangular box with both shelves fixed. No. 10; 1, Provide a 4 ft. x 5 ft. louver at the soffit above the main stair at each of the sixteen buildings. The louver mush include an insect screen and be refinished so that no painting is required, installed per the attached details PR -10-1 8c PR -10-2 , and be Metal Aire Series RHE -1 with insect screen or equal. 2. Provide six "tulle shell" vents at the rear center area of the roof of each of the sixteen buildings. These will have to be "cut in" at the roofs to Bldg.#1 & Bldg.#2. Turtle shelf vents should math the other vents an the roof or the dark brown valley meta. No, 11: Delete the landscaping rock retaining wail at the northwest corner 4f the site from the contract. The other rack retaining walls shalt remain in the contact and shall not be affected by this change in work. 1. The rock materials that are currently on site will remain there for the Owner"s use in constructing the northwest retaining waft after the construction of 2nd West Street,, The reinforcing fabric and drain pipe required for the retaining wall will also remain an site for the Owner's use. Z. The brick material for the large masonry sign at the corner will be kepi on site for the Owner to use in the futures that matching the brick wilt not be an issue. F. W R,0- BOX Rexburg, ID 83440 208-757-9172 Project: BYU Idaho Student Family Housing Project No.: 03-0001 No 11: (Continued) UEST SUMMARY ...=_... Architect: JHS Architects Contractor: Bateman -Hall Inc. 3. 1 he concrete for the base of the brick sign will be deleted from the Contract, 4, The berm of earth along the north west corner needs to be at the designed height and then slope off to the north and west ata 3-1 slope over the area where the regaining wall would have been. The 3:1 slope would run out until it meets existing grade. 5. the landscaping would be modified as follows: a. Delete 12 trees and 1+68 shrubs associated with the rock retaining wall, b. Extend the lawn dawn the 3;1 nope to a point were the future sidewalk will occur. 6. The irrigation sprinkler system at the northwest corner will be modified. a. Delete (12) TORO 570Z-PRX-6P-12. heads and associated piping. b. Delete (26) TORO 570Z-PRX-6P.15 heads and associated piping. c. Delete (49) TORO 5702-PRX-6P-10 heads and associated piping. d. Delete (5) TORO 5707, -P -RX -4P,15 heads and associated piping. e. Delete (8) TORO 5-70Z.PRX.4P,10 heads and associated piping. f. Delete (5) TORO 5702-PRX-4P-4-EST heads and associated piping. g. Delete (10) HUNTER I-20 heads and associated piping. (Note: Cap the water lines that lead to the deleted areas at a location that will allow the Owner to easily complete the north west turner area at a later time.) Reviewed By: E3ret L. McGowan/President CC: BYU Idaho, City of Rexburg, JHS Architects, Bateman Hall P.O. Box I43 Rexburg, ID 83440 208-757-9172 UEST FOR INFORMATION SUMM.__ -1 -RY Project: BYU Idaho Student Family Housing Project No.: 03-0001 Page 1 of 7 Architect: JHS Architects Contractor: Bateman -Mall Inc. No. 01: Details 4 thru 8 on sheet A10.3 shelving to be installed as per RFI#I,, 41A10.3 Top shelf to be 1 ft, deep and fixed. 2nd from top - 2 ft, deep and fixed. Lower 8 in. deep and fixed. 51A10.3 All shelves to be 2 ft. deep and adjustable as drawn. 6/A10-3 All shelves to be full depth of closet and fixed with "cheats" on the wafts for support. 7/A10-3 All shelves to be 1 ft. deep and adjUstabie as drawn. 8/A10-3 All shelves to be 1 ft, deep and adjustable on K1! vertical's and brackets,, No. 02. All of the columns should have 3/16" thick walls. A cursory review of the toilet accessories list attached to RFI -Z has been made. Without gong through each item, the Inst looks complete This is not an approval of the list..,.. Only the results of our cursory review. Na 03: Bldg.# 1, rock surfate in conflict with bottOM of footing elevation: Allow depth of footing to decrease ( bottom of footing rises and top of fooling stays leve ) as the rock rises into the footing area. The continuous reinforcing steel needs to rise and be approximately 2" above the rock surFace. The rock surface needs to be cleaned off so that no loose earth materials are between the rack and the new concrete....,. per Addendum #1 No. 04: Drawing A1.6 is correct, The east end of Bldg.#5 steps up 31- 8". No. 05§ Drilling and epoxying the anchor bolts at the party wars over the floor stabs is acceptable. Drilling and epnxying at the bald downs (PAHD42) is acceptable but may not be easy because the PAHD4Zs are designed to be cast into the floor concrete., it would also be acceptable to change to a different hold down such as LTT131 and then drill and epoxy the anchor into the concrete sfab/faotFng. If there are any questions concerning the fold downs..190make sure that answers are obtained before proceeding. No. a+5: The closets at the rear of each building will be identified as Electrical or Communication Closet by what the electrician pins into them. It does not make any difference to the, design tears which is which. No, 07: Windows, The nailing fin is tO be removed where the window are set dawn into the toy of foundation walls. This would be similar to detail 14/A8.1- The manufacturers representative indicates that screws through the window frame dawn into the concrete at the sill may be needed. Install per rr�anufacturer's recommendations. The manufacturer's representative indicates that the windows shouldb� �a���Ced yvith urethanE caulking. Install per manufacturer's recommendations. A IF �r�, R0v Box 143 Rexburg, ID 83440 208-757-9172 UEST FOR INFORMATION SUMMARY Project: BYU Idaho Student Family Housing Project No.: 03-0001 Page 2 of 7 Architect: QHS Architects Contractor: Bateman -Hall Inc. No. D8: Hold downs at the walls of the buildings above the foundat-Ion are only required at the locations shown (HI -1s. etc.). The straps do not necessarily continue at all places when a hold-down at the foundation occurs. Yes, the hurricane brackets from concrete to roof are sown with delta HI symbol. MST 37's and MST 48's are also used in the area near the stairs to the 3 story units. No. 09: SP2"s at 16/1 o.c. revery stud) are requi�-ed at the delta X locations,, The plywood shear walls (Crosshatched wars) need to be nailed per the Shear Wali Schedule too. An SPS at each stud and a A35 at each outlovker are required. No. 10: The stair landing and the stair stringers need to work as a sinrt gly member sup oed h the beams between the calumns. As the design of the stars proceeds., the stair desirsgne need to involve a structural engineer per the specs. No. 11: At building #3: There are three options available for the norm drain for this building. A) The drain for the enure building could be tied to the catch basin to the southwest of Bldg.#3. 8} The drainage for the upper end of the building could be tied to the stub from SDMH#I. This stub is already installed:- The drainage for the lower end of the building could be tied to the catch basin to the southwest of Bldgw#3. C) The stub from SDMH#1 could be reinstalled at a lower elevation to allow the buildin drain to be deep enough to meet the 3' of cover, g At building #7: Rug the storm drain for this building to SDMH #3. The building drain layout would be similar to a mirror image of building #5., The.invert of the drain stub would be approximately 57-.5. Na. 1Z: item #1. See attached details. item #2., These columns only occur at building #12, TwO columns are required, Item #3. The beam bearing elevation at the seat calculates at 108' - 1129/32"". This must be verified by the genera! contractor. See drawing on sheet 2 of RFI#12, No. 13: Diniensions for typical 2 BR floor plan, the string of dimensions in ue ion should be revised as shown on the attached Sketch. The end dimensions are to the centerline of the "parley wads'", The centerline of the party wra«s. Is typically the face of the plywood shear sheathing. No. 14: Residential sprinklers with orifice sizes of 7/f6" or 318f`are approved ashmee# �VFPA13RY N V 0 a a Lu-, i "`��, , a R E P.O. Box 143 Rexburg, ID 83440 208-757-9172 0 UEST FOR INFORMATION SUMMARY Page 3 of 7 Project: NYU Idaho Student Family Housing Architect: JHS Architects Project No.: 03-0001 Contractor: Bateman -Hall Inc. Na 15. Bldgir#1 windows, concrete in window opening Gr' too low, Drill & epoxy (3) #4 bars into the existing concrete sill and (1) #4 bar into each jam. At Sills: three evenly spiced - 8" long with 4"" embedded into the existing foundation. At Jambs: 1 bar each jamb - 8"' fang with 4"-' embedded into the existing foundation. Our primary concern is that the new sill patch blend into the surrounding foundation as much as possible. No. 16: The pipe sizes for Water Closets may meet the UPS for Water Closets in residential construction, 3" toilet flanges may be used. The pipe sizes mush meet the UPC for the designated type of construction, No. 17: 7t1,�4�� . The ft. wAl [1f th krcaeiir�r..� ---------�U��wI��9� vv"".[ t:! ane rounaation is already in place will have to be "ground out" a little to accommodate the vent pipe. Item #2, On the subsequent buildings a small block-out should be added to the concrete farms for that wall so that the went Ione can be accommodated. The block-out could be a piece of half inch plywood or something similar. No. 18: The reasonthat the dimensions on detail 3/A7.3 are noted " NOMINAL" is because the plate, thicknesses, spud heights, joist heights and floor sheathing thicknesses is not known exactly. E�_H, will provide exact dimensions of the various components. We recommend that we wait until 131dg.#1 is. framed. Floor to floor = 97 1/8", HoOr tO roof = 109 1/8"d Na. 19: City of Rexburg Fire Inspection, The pull stations were added by addendum. They reed to be shown an the Fire Alarm System shop drawings. The Fire Alarm System can be programmed by the installer however the dire Inspector wants it rnnrarnme e detectors are clearly shown in the 2T unity on drawing. E3.1. Monitoring of smoke defectors is not required, this item is not applicable. There is no gate at the entrances to the project after construction is complete. Someone has, misread the drawings. Node: the electrical engineer (Todd Payne] his discussed and reviewed these items. with the Fire Inspectvr (Chris Huskinson} and Nelson Fire Stictyems on �1 May �003. The above response is the outcome of those discussions. No. zo. The attached drawings RFI -gyp -1 and RFI -20-2 realise the grades at the parking lot east of Bldg.#8 & #11. The revision is required dui to the lack of adequate cover for the existing storm drain line. This revision is required due to the lack of adequate cover for the existing storm drain dine, The attached drawings adjust the finished parking lot grades to provide the needed cover, A grade ring at SDMH#5 wiff have to be added. Please see drawings RFI -20-1 and RFI -2Q.2 for details. P.O. Box 143 Rexburg, ID 83940 208-757-9172 UEST FOR INFORMATION SUMMARY Project: BYU Idaho Student Family Housing Architect, JNS Architects Project Na,: 03-0001Contractor; gateman -Hal! Inc. No. 21: The Mooring contractor must have submitted incorrect installation information for the sheet vin yi flooring. Submittal 1�9-1 refers tv heat welded seams or welding rods in at least 16 places. Please have the flooring contractor submit the correct installation information for the Commission Plus flooring and a sample of a cemicaliy welded seam that we can review. No. 22: Paul Jensen met with Val Christensen on 5/5/p3 and received approval to use the existing anchor bolts for the PHD5 hold-downs. Cut off lower 16" on the king stud to gain access to the existing halts, Assure that hold-down straps form above are nailed to the (2) column studs (which are attached to the hold-down, device) and not the king stud, This approval applies only to the first (3) buildings or to the extent the anchor bolts are misplaced at this point in, time,, No. Z3: The contractor/supplier for the framing chose to substitute the rim joist material for the joists shown. This is fine except for the front wolf of the townhouses which are to be a continuous drag strut. Other than the drag struts, the rim joists may have joints in them. No. 24; The STC dips shown at detail 9/A10-2 need only be installed at roof trusses.. No., 25: GFI outlets at the stair landings should he 18" above the landing, Es, the main entry switches should be at the latch side of the door. Yes, the closet switch can move around the corner. dight fixture at the Pantry may be ceiling mounted. Gang the closet light switch with the bedroom light switch... -only occurs at the 2 "d bedroom not the Master Bedroom. Should add a single toggle switch at the nearest "side wall"to the range hood.. This. would occur at 37 lower fever units'. Microwave at accessible units will be located on countertop or a tenant furnished cart. Fire alarm gong shall be located above the Utility Closet 107 at the rear of a townhouse unit, see 3/A5.1 Light fixture heights... F15, Upper (approximately 17' above main floor) rear of townhouse centered. F14. Tap of fficture to be level with top of door frame. F8, 4 ft,. back from main entry walk and 7 ft, above the stair riser, Thi locations of the TV vutleis are OK as shown on the drawings. The electrical panels in all units should be mounted at the standard height. Four units on the project reed to be totally accessible. These are 2A units which are at Building #7 (2), Building #S (t), and Building #12 The other dower level unitsnot townhouses) need to be adaptable if the need arises, � V INA PsOm B%ONA1143 r% Kexburg, M 83440 208-757-9172 Project: BYU Idaho Student Family Housing Project No.: 03-0001 Page 5 of 7 Architectu JHS Architects ContractorAg Bateman -Hall Inc. Na. 25. (Cont) The light flxture in Pantry 102, at the townhouse units needs to be changed to a 2' fixture due to the sloped ceiling under the stair. 1.41 No. Z6: Smoke detectors ars only required in the bedrooms and jest outside bedrooms. Smoke defectors are not required at the Vt floor of the: townhouses. Revised The architectural Reflected CejJ169"PlaTSn. drawing A2_1 shows smoke r detect townhouse units. The electrical drawings°�"�� bottom level o� the refer to the architectural for quantities and location, No. 27: Duca work penetrations at b22 vyall, Drop the duck work below the double plate.. this will result in the ceiling being 3 inches lower in the area were the ductwork occurs. Refer to attached sketch RFI#27,, No. 28.- After reviewing the entire situation with the ductwork and the efectrieal panel and the available space at the bottom of the stair; we feel that it is best to locate the electrical panel at the townhouses behind the door in the small bedroom an the upper floor, This will allow the dint to turn while in the toilet room and not be above the panel. No. 29. Drawing A3.3 is correct. Delete the delta 44 symbol at the wolfs between the 2BR units and the townhouses, The delta 4 wail occurs at hath sues an the lower leve! only. Y Na. 30: Utilize H1 1Z brackets when possible.. Use (2) H71s, one on each side, at the 2 or 3 trusses an Buildings #1 & #2 where the H1 1Z'$ won't work. No. 31: At the delta 22 shear wall behind the Utility Closets, the hold-down should be delta H10. The hold-down strap is CM 12 90"+. Delta H10 applies to hold-down devices from foundation tO top of top wall. 1110 is a hold-down at perimeter of roof holding trusses to the wall. No. 32: Use HU7MAX bracket at the ends of the g4 beams that bear on the building wall. The 134 beams are 7 1/2" high and the 137 beam is g" high. This will only be a problem if a truss happens to fall right above the! B7 beam. No. 33= The attached drawing RFI -33-1 revises the grades at the parking lot at the southeast corner of the site.. This revision is required due to the lack of adequate cover dor the existing storm drain dine. The attached drawing adjusts the finished parking lot grades to provide the caner at the corner of the site. Thee grades and elevations in front of Build Ing s #16 &. #12 all shay as indicated in the construction documents. See attached drawing RFT -33-1 for details. 1-4 W P. 0 . Box 143 Rexburg., ID 83440 208-757-9172 Project: BYU Idaho Student Family Housing Project No.: 03-0001 Page fi of 7 Architect: QHS Architects Contractor; Bateman. -Hall Inc, No, 34: The F5 fan/light units need to remain in the project, The exhaust dans at the toilet rooms shown on the mechanical plans can be deleted. Please provide a detailed cost proposal dor deleting (52) EF -1 fans and (155) Ef-2 dans. No. 35: 1. Refer to ASI -14 for the first issue of this RFL Z. The 2f]00 IMC -504-6-.1 allows 25' fess 5' for each 90 degree elbow. The dryer vent outlet is approximately 8' up and 10' out from the dryer location. Even with the elbows, it should be below the 25' limit. No. 36: Please refer to letter dated 15 August 2003. See attached tetter dated 15 august 2003 regarding RFI #36, BYU of Idaho Family, Housing. No. 37: Relocate dryer vent to the exterior wolf and adjust framing as required to accommodate fire rating between units. No. 38: the wrought iron and brick pier fence will follow the slope of grade. The wrought iron fence panels will be "trapezoids" rather than "rectangles". The rough grading should be done in accordance with the addendum drawings (Addendum #1), The tops of the concrete foundations for the brick piers should be 4,"Fto 51'r above the finished grade - tYPically. The area near the rawer pole at approximately the center of the site along 7ffi South will need to be adjusted to protect the pole. No. 39m- Although i haven't seen the Almond calor handles and edge banding.,..,.. Ken and I agreed over the phone that the Almond color would probably be tie best edge banding and handle color. RFI -3g indicates that a re -submittal has been received. ,As of now, i have not received it. No. 40: Item #1. Lintels to have 8" bearing. No attachment to the building. Item #2. "Tyvek" Wrap to overlap lintels. Item #3. Colorof brick at rear of townhouse mechanical room to be brick color #2 and the brick feature to he brick color #1, Na. 41: item #1. The brick color at the elect rica!/communication claret to be brick color #1 (Dark Back). Idem #2. There needs to be a moulding at the transition between brick and stucco at the header on electrical/communication closet. 14 P.0% Box 143 Rexburg, ID 83440 208-757-9172 UEST FOR INFORMATION SUMMARY Page 7 of 7 Project; 6YU Idaho Student Family Housing Architect: JHS Architects Project No,,,, 03-0401 Contractor: Bateman -Hall Inc. No. 42: The feature relied at the rear Mechanical Rooms will be aceamplished W1th additi onal layers of sheathing prior to application of stucco. Refer to attached drawing RFI -42-1 for relief depths. The wall plane directly mound the door frame will be at 011r. The arch and the plane around the firs alarm device will be at 1/2"r out. The column faces will be at 1rf out. Provide control joint and tooted Joints as noted on attached drawing RFI -42-1. See attached drawing RFI -42-1 for details,, Reviewed By; Beet L. McGowan/President CC; BYU Idaho, City of Rexburg, JHS Architects, Bateman Hall