HomeMy WebLinkAboutT2M DAILY FIELD REPORTS (2) - 03-00015 - BYUI - Student Housing 16 Buildings (160 units)P.O. Box 143
Rexburg, ID 83440
Daily Field Report
Pru)ect: Student Family Housing Facility Date: 5/13/03
Location: 14, V1 T U
Client: BYU Idaho
Project No..: 03-0001
Equipment*
4
HK Contractors
Is
Work Force,
Bateman Hall
H K Contractors
Castle Electric
Page 1 of 2
Weather: Warm and partly cloudy
Temperature; Hi: .630; Lo: 360
Day of the Week: Tuesday
1 CAT 140G Grader 9.0 Hours
I CAT 966F Loader 9.0 Hours
4 10 Wheel End Dumps + pups 9.,0 Hours
I CAT 980C Loader 9.0 Hours
1 Water Truck 9.0 Hours
I CAT 330B Trackhoe 9.0 Hours
1 John Deere 710 Backhoe
9.0 Hours
I CAT 446B Backhoe
9.0 Hours
1 .18 Wheel End Dumps
9.0 Hours
I Superintendent 9.[l Hours
I Foreman 9.0 Hours
6 Qperators 9--0 Hours
6 Truck Drivers 9,0 Hours
4 Laborer 9.D Hours
I Grade Checker 9.0 Hours
I Foreman 9.{] Hours
I Electrician Apprentice 9.0 Hours
Special -Inspector vbs+ervatians: Contr-actors Hours; 7:00 am - 4:30 am
1 MCI;
Section 2202: Contractor continued excavating and stockpf ing blasted material from utility
trenches. Reject sand from Ashcroft pit wa�����
hauled in for trench becfdingand- bac�cfi1.
Contractor continued to placing backfill around exte -nor Bldg.#1.
Contractor performed grading on S. 2nd W.
Contractor completed rock removal on Bidg.#7.
Special Inspector:
Bret McGawan
Certification Nurnbers, 1035270
P.O. Box 143
Rexburg, ID 83440
Page 1 of 7
Daily Field Report
Project: Student Family Hmsing Facility Date: 5/13/03
Location: Rexburg, ID Weather: Warm and partly cloudy
Client: BYU Idaho Temperature: Hi: 63°; Lo: 48°
Project No... 03-0001 Day of the Week: Tuesday
Equipment:
NA
Work Form&M
Action Mechanical
1 foreman
4 Plumbers
6.0 Hours
6.0 Hours
bpeaai inspector ohsenrations. Contra
Crs Hours; 9:3U am - 3:3D P.M
Building #1
Section 15100: contractor compietedplumbing dor Bldg.#1.
Contractor completed backfilling plumbing for Bidg.#l,
Spoke with Randy/JHS Arch. about pressure testing storm drain and insulating water line thru 2•►
S Wes in townhouses under slab on grade, neither are required.
Plumbing inspector approved plumbing Bkig.#1
Nate: Unfess otherwise noted, all materials appeared to he placed as per plans and
specifications.
P.O. Box 143
Rexburg, ID 83440
Daily Field Report
Project; Student Family Housing Facility Date: S/14/03
Location: Rexburg, ID
Client: BYU Idaho
Project No.: 03-0001
Equipment:
HK Contractors
Warp Force:
Bateman Hail
HK Contractors
004
Page 1 of 2
Weather: Warm and partly cloudy
Temperature: Hi: 73°; Lo: 52°
Day of the Week: Wednesday
1
CAT 140G Grader
9,0
Hours
1
CAT 966E Loader
9.0
Hours
4
10 Wheel End Dumps + pups
9.0
Hours
1
CAT 980C Loader
9.0
Hours
1
Water Truck
9.0
Hours
1
CAT 3308 Trackhoe
9.0
Hours
1
CAT 350E Trackhoe
9.0
Hours
1
John Deere 710 Backhoe
9.0
Hours
1
CAT 446g Backhoe
9.0
Hours
1
18'Wheel End Dumps
9.0
Hours
].
Superintendent
9.p
Hours
1
Foreman
g.0
Hours
5
Operators
9.0
Hours
6
Truck Drivers
9.0
Hours
4
Laborer
9.D
Hours
te a, inspector vbservaativns: Contractors Hours; 7.00 am - 4:30 am
Site Grading
Section 2242: Contractor continued excavating and stvckpiing basted material from utility
drenches. Reject sand from Ashcroft Pit was hauled in for trench bedding and backfulk
Contractor continued tO baCkfill for of Bldg. #2.
Contractor continued grading north side of Bldg.#1%
Excavated far thickened subs an Bldg..#1.
SPedal Xn-spector: Bret McGowan
Certification Number: 103,5270
I raj' --[W
-2
.J
P.O. Box 143
�l�fbu[g. ID 81940
Daily Field Report
Project: Student Family Housing Facility
Date"a 5/13/03
AP.
zbpeciai itnspectar Observations:
Utilities
Page 2 of 2
Section 2401: Contractor pressure tested water 1ine from W. 7th S. to 'T' for secondary loop,, All
tem were approved by Coleman/BYU Idaho.,
Note: Unless otherwise noted, all materials appeared to be placed as per pians and
specifieations.
Special Inspecinr: Bret McGowan
Ce cation Number: 1035270
P-0, Box 143
Rexburg, ID 83440
Daily Field Report
Project: Student Family Housing Facility Date: 5/14/03
Special Inspector observations.
Page 2 of 2
2 freed densities were taken around penmeter of Bid 2' &OW subygrade. All bests
were found to meed minimum compaction requirement.
Nate: Unless otherwise noted, all materials appeared to be placed as per plans and
speacifeat'rons.
Special Inspector: Bret McGowan
CerMcation Num r;.1035270
at
I
Page of
Field Density -Report
Datew .S �/Y- U3
WPagIer. /P4 r
Tec*WcL-M:
P.O. Box 143
Rexburg, ID 83440
Page 1 of 2
Daily Field Report
Project: Student Family Housing Facility Date: S/14/03
Location: Rexburg, ID Weather*
Client: BYU Idaho s Warm and partly cloudy
Tempereture: Hi: 73°; Lo: 5211
Project No.: 03-0001 Day of the"Week.U Wednesday
Equipment:
R. E. Beck Const. 1 Generator 9.0 Hours
1 Grove RT500C Crane 9.0 Hours
HK Contractors1 CAT 140G Grader 9.0 Hours
1 CAT 966E Loader 9. 0 Hours
4 SO Wheel End Dumps + pups 9.,0 Hours
1 CAT 980C Loader -9.0 Hours
1 Water Truck 9.0 Hours
1 CAT 3308 Trackhoe 9.0 Hours
1 CAT 350E Trackhoe 9.0 Hours
1 John Deere 710 Backhoe 9.0 Hours
1 CAT 4466 Backhoe 9.0 Hours
Work Force: 1 18 Wheel End Dumps 9.0 Hours
R. F. Beck Const. 1 Foreman
9.0 Hours
13 Concrete laborers 9.0 Hours
HK Contractors 1OPerator 9.0 Hours
1 Foreman 9.0 Hours
5 Operators
9,.0 Hours
6 Truck Drivers 9.0 Hours
4 Laborer 9.0 Hours
Action Mechanical 1 Foreman
4 Plumbers 6.0 Hours
Jeft I'll 1 12 - 9 4w, - :7 6-0 Wni ir
%m#fflcmal r Observations: Contracrs Hours-
jr- 4:3
Suild*no #2
Section 7115: Contractor completed placement of damDBidgm#210 praafng on exten*or stem wars for
Section 15].].{]: Contractor continued plumbing underground for B�d9.#2.
Section Z602. Contractor core drilled 8`1 drain conductors for tie -ion Bidg.#2,ns to 4" PVC o� roof drain system
Special Inspector: Bret McGowan
Certification Number;, 103-52-70
Prof
P.O. Box 143
Rexburg, !D 83440
Daily Field Report
Student Fami y Housing FacifitVDate: 5/14/03
°spector Observations:
i
w
Page 2 of 2
Section 33D0: 2"*�°gid insulation appeared do he causing separatian between slab on rade and
sten wall, (see attached photo}- NamedConbzctor of deficdienc�+►. �
Nate: Unless otherwise noted, all materials appeared to be placed as per plans and
sPecifications.
Spedal Inspector: Bret McGowan
CertifiC;3tion Nurnbera. 1035270
1 17
P.O. Box 143
Rexburg,lD 83440
Page 1 of I
Daily Field Report
Project: Student Family Housing Facility Date: 5/14/03
Location: Rexburg., ID
UWAftM_%*&%
' - • - -
Client: BYU Idaho
Project No.: 03-0001
Equipment:
R -v E. Beck Const,
Work Force;
R.
E. Beck Const,
1 Generator
= an
; warm a party cjouU/
Temper'ature:ek:
Hi: 730; Lo: 52°
I Day of the WEWednesday
9.5 Hours
i ' I C1 "CA" 9.5 Hours
13 Concrete laborers 9-1; Hniim
ovemao anqMclor obsmoyabonsaw CtrWrs Hours, 7:00 am � 51.00 PM
Buifdina #3
Section 3300: Contractor placed reinforcing steel and
anchor
half of Bldg.#3,
Contractor Placed 28.0 c.Y. of concrete In this area.
Contractor placed reinfordng Fiber mesh in mixer truck on Job site.
Note: Unless otherwise noted, all MateriaLs appeared to be placed as per plans and
Specifications.
a
Special Inspector. Bret McGowan
Certification Number: 1035270
P.O. Box 143
Rexburg, ID 83441.
Daily Field Rep
ort
Project: Student Family Housing Facility Date: S/15/03
Location: Rexburg, ID Weather* Warmand cloudy
Clients. BYU Idaho Temperatures. Hi: 7311w, Lo: 540
Project No.: 03-0001 Day of the Week: Thursday
Equipment:
HK Contractors 1 CAT 140G Grader
9.0 Hours
1 CAT 966E Loader
9.0 Hours
4 10 Wheel End Dumps + pups 9-.0 Hours
1 CAT 980C Loader 9.0 Hours
1 Water Truck 9.0 Hours.
1 CAT 330B Trackhoe 9.0 Hours
1 CAT 350E Trackhoe 9.0 Hours
1 John Deere 710 Backhoe 9.0 Hours
1 CAT 4468 Backhoe 9.0 Hours
1 18 Wheel End Dumps 9.0 Hours
Work Form:
Bateman Half I Superintendent
HK Contractors 9.0 Hours
i Foreman 9.0 Hours
5 Operators 9,0 Hours
5 Truck Drivers 9.0. Hours
4 laborer 9.0 Hours
%mv=%Ao, anspecfor vbservations; Contractors lours; 7:00 am - 4:3U am
Site Aradi
Section 2202,:CContractor Ccontinued ex�;avating and stockpiling blasted rnateriai from uti�ittrenches. Reject said f,�vm Ashcroft Pit was thauledin for trench bedding and backfill.�
Contractor continued to backfill interior of Bldg.#2.
Special InSpector.0 Bret McGowan
Certification Number: 1035270
P.O. Box 143
Rexburq, ID 8344
.,Op. I
Page 1 of 1
Daily Field Report
Protect: Student Family Housing Facility Date: 5/15/03
Location: Rexburg, ID Weatherm. Warts and cloudy
Client: BYU Idaho Temperature; Hi, 730@-
ThLo: 54°
Project No.: 03-0001 Day of the Week:ursday
Equipment:
R. E. Beck Const.
Work Force.*
AcUon Mechanical
R. E. Beck Const.
&M�_&. _5.�
I Generato r
1 Grave RT500C Crane
1 Foreman
4 Plumbers
1 Foreman
13 Concrete laborers
1 Operator
5.5 Hours
6.5 Hours
69
OUTS
6,D
Nouns
G.5
Hours
6.5
Hours
C.5
Hours
ouservations: Cmtractor-s Hours, 5:30 am - 12000 W
BuRding.#1
Section 330x: Contractor pieced approxifnateiy of cora-ete, �" gid insulation and #4
dowels around perimeter, dor slab cin -grade.
Fiber mesh was adder to the mixer truck at the fob site
Note: Unless otherwise noted, all materials appeared to be placed as peg- plans and
speci�ications.
SPecial Inspec€Dr: Brei McGowan
Certffication Number: 1035270
P.O. Box 143
Rexburg, ID 83440
Daily Field
Project: Student Family Housing Facility
Location: Rexburg,, ID
Client: BYU Idaho
Project No..: 03-0001
Equipment,0
HK Contractors
Work Fare:
Bateman Haid
HK Contractors
Page 1 of 1
]ate: 5/ 16/O3
Weattte#': Coo[ and overcast
Temperature; Hi: 52°; Lo: 49°
Day of the Week:, friday
1
CAT
140G Grader
4.0
Hours
1
CAT
966E Loader
4.0
Hours
4
10 Wheel End Dumps + pups
4.0
Hours
1
CAT
980C Loader
4.0
Hours
1
Water Truck
4--0
Hours
1
CAT
3306 Trackhoe
4.0
Hours
1
CAT
350E Trackhoe
4.0
Hours
1
John
Deere 710 Backhoe
4.0
Hours
1
CAT 4468
Backhoe
4.0
Hours
1
18 Wheel
End Dumps
4.0
Hours
1
Superintendent
4.D
Hours
1
Foreman
4.Q
Hours
5
Operators
4.0
Hours
6
Truck Dn-vers
4.0
Hours
4
Laborer
4.0
Hours
SPecial Inspector abservations: COntractors Hours; 7a.00 am - 11:00 am
Nite Grading
Section 22p2: Contractor continued excavating and stvckpilxng blasted material from utili
trenches. ReiW sand from Ashcroft Pi ►vas hauled in for trench bedding and backfill. ty
Contractor Deegan backfifing east 1l4 of interior for Bidg.#3.
Contractor begin grading north side exterfor of Bldg -.-#2.
Section 2400: Bacteriological besting for water main fire hydrants and service lines from W. 7'h S.
to `T' for secondary 100P were found to meet requirements as per Coleman SteeVByu Idaho.
Began pressure testing wader line services to Bldg.#1. thru Bldg.#4
Nate: All materials appeared to be placed
as per plans and specifications.
Seal Inspector; Bret McGowan
CeffifiCation [umber: 1035270
P.O. Box 143
Rexburg, iD 83440
Daily Report
Field
Project,: Student Family Housing Fa "am. any Date: 5/16/03
Location: Reacburg, ID
Client; BYU Idaho
Project No,: 03-0001
Equipment:
Re E. Beck Const.
Work Force:
R. E. Beck Const.
Cq�.�����
Page I of 1
Wea#her: Cool & overcast
Temperature: Hi: 62c; Lo: 49P
Day of the Week: Friday
1 Generator
1 Grove RT5aDC Crane
1 Foreman
13 Concrete laborers
1 Operator
4.0 Hours
4.0 Hours
4.0 Hours
4.0 Hours
4.0 Hours
�t�a� 1F1si)ca4ct)w observations: Contractors Hours; 7:00 am - 11:[3€} pm
Building #1
5effivn 3300: Contractor sawcut slab on -grade,
Note: Unless otherwise noted, all materials appeared to be placed as per plans and
specifications.
Special Inspector:
Bret McGowan
Certification Number: 1035270
P.O. Box 143
Rexburg, ID 83440
Daily '
Projects Student Family Housing Facility
Location: Rexburg, ID
tient: BYU Idaho
Project No.: 03-0001
Equipment:
HK Contractors
Work Force:
Bateman Hall
Field Report
Date: 5/19/03
Page I of I
M
Weather: Warm and breezy
Temperature: Hi: 550; Lo: 391
a
Day of the Week: Monday
I
CAT 1406 Grader
10.0
Hours
1
CAT 966F Loader
10.0
Hours
4
10 Wheel End Dumps + pups
10.,0
Hours
1
CAT 980C Loader
10.0
Hours
I
Water Truck
10.0
Hours
1
CAT 330B Trackhoe
10.0
Hours
I
CAT 350L Trackhoe
10.0
Hours
1
John Deere 710 Backhoe
10.0
Hours
I
CAT 446B Backhoe
10.0
Hours
1
18 Wheel End Dumps
10.0
Hours
-1 Su�nntendent
HK -Contractors 10.0 Hours
1 Foreman 10.0 Hours
5 Operators 10.0 Hours
6 Truck Drivers 10.0 Hours
_ _ _ _
4 Laborer in nl4ni arc,
bPeclal JftspecWr Observations;: Contractors Hours* 7:00 am
- 5:30 pm
F -
Site Grading
Section 2202: Contractor began grading for bottom of footing elevation on Bldg,#1U ,west half.
Contractor began grading on the north side of BidgAtl & #2.
Contractor began excavating S.W. corner of Project basted rock removal.
Sectian 2400: Carrtractor performedPressurefest an water line secondary iovp-
Note:
Unless otherwise noted, all materials appeared tv
�&-* IN
speorications. p�ac+ed pans an'r
Special inspector: Bret McGowan
Certification Number: 1035270
Mh
POOL Box 143
Rexburg, ID 83440
Daily Field Report
Project: Student Family Housing Facility Date: 5/19/03
""•y, "' Weather: Warm and breezy
tient: BYU Idaho:.,
Project No.: 03-0001
Equipment:
R. E. Beck Const.
Vilfe 6+
I#.,
1 Generator
I =ffJ1PCF-4XUFet1l: b!) ; LO: 39v
DaY 4Df the Weeks. Monday
9.0 Hours
-L Fur eE I Id 9.0 Hours
afth- - - 11 Concrete laborers 9..0HnI erc
NMGal Inspector vbsen►ations: Contractors Hours; 7:30 am - 5:oo ,fin T - --
Builain #4
Section 3300: Contractor placed 20..0 c.y. of concrete, anchor bolts and reinforcing steel for east
half of Bidgvr#4r stemwalls.
Section 33D0: Concrete was sampled and (1) set of 4 cylinders was cash. The test resutts were as
followsm v a
Slump= S 1/4"'
Air Cont.= 3.0%
Conc. Temp.= 60°
Air Temp.= 55°
Note: ung otherwise rioted, a materials ap�ared tc�
bep..bcedspecifications'. as per plans and
SPecial Inspector: Bret McGowan
Certification Number: 1035270
P.O. Box 143
Rexburg, ID 83440
Page 1 of 2
0
Daily Field Report,
Project: Student Family Housing facility Date: 5/20/03
Location: Rexburg,, IDWeatherm Cool and overcast
Cfient.n BYU Idaho Temperature: Hi: 65°; Lo: 46°
Project No.: 03-000.1
Equipment
Day of te& k. Tuesday
HK Contractors 1
CAT 1906 Grader
10.0
Hours
1
CAT 966E Loader
I0.0
Hours
4
10 Wheel End Dumps + pups
10.0
Hours
1
CAT 9800 Loader
10.0
Hours
lWater
Truck
10.0
Hours
1
CAT 3306 Trackhoe
10.0
Hours
1
CAT 350E Trackhoe
10.0
Hours
1
John Deere 710 Backhoe
10.0
Hours
1
CAT 4466 Backhoe
10.0
Hours
1
18 Wheel Enid Dumps
10.0
Hours
Work ForceIt
:
Bateman Hail 1
5uperintendent
1i3,0
Hours
HK Contractors 1
Foreman
10.0
Hours
5
Operators
10.E
Hours
6
Truck Drivers
1(3.D
Hours
4
Laborer
10.0
Hours
Castle Eledric 1
Foreman
10.Q
Hours
.,.... ,....,�,_...?- tledan ,'4pprentice 10.0 fours
Special Xnspector observations: Contractors Hours; 7:U(3 am - 5:3D Prn
P!rl ��rjt; I -t I I I.L;t
Section 2202.: Contractor performed grading west of Bldg.#7., #10, #13, & 14.
Existing stardrain has only U.4` of coverat CB#6.
Contractor continued excavating blasted rock from S.W. corner of project parking lot area,
Special In-pectar: Bret. McGowan
Ceftification Numbers. 1035270
SBUGOU Own- 371 [ ul!4
Rexburg, ID 83440
Daily Field Report
Project: Student Family Housing Facility Date: 5/20/03
Special Inspector observations:
ft
Page 2 of 2
Existing storm drain has only 0.4' of cover at CB#Fi. Rocky Mountain Eng. will advise on how tv
corred deficiency.
Section 16111: Discussed inadequate cement content on red dye concrete for power duct banks
WM LloydJBYU, Idaho.:Notifed Tim/Castle Bectric that ZS0OpsiWA concrete is required.
Note:
Unless otherwise noted, all materials appeared to be placed as per plans and
Specifications.
Special Inspector: Bret McGowan
Certification Numbers. 1035270
P.O. Box 143
Rexburg, ID 83440
Daily
Project: Student Family Housing Facility
Location: Rexburg, ID
Clients. BYU Idaho
Project No.: 03-0001
Equipment.
NA
Work Fotre.
Ambassador
Field Report
Mtes. 5/20/03
Weather: Cool and ov
1 Foreman
12 Carp e-ni
Temperature: Hi: 65°; Lo: 2-6"
Day of the Weeks. Tuesday
8.0 Hours
8-.0 Hours
Spedal InVector observations: Contractors Hours; 7:00 am - 3.3D pm
Bui'ldipg
Division 06: Contractor began framing 1A floor-..
Discussed adding fiber mesh into trucks at job site with LJoyd/BYU, Idaho and Randy/]HS Arch.;
both agreed fiber mph should be added at Batch Plant.
Note,: Unless otherwise noted, all materials appeared to be placed as per plans and
specifications.
Spedall I liect": Bret McCowan
Certification Number: 1035270
P.O. Box 143
'Rexburg, ID 83441
Daily Field Report
Project: Student Family Housing Facility Date: 5/20/03
Location: Rexburg, ID Weather: Cool and overcast
Client: BYU Idaho
Project No.: 03-0001
equipment:
HK Contractors
Work Force:
Bateman Hal!
HK Contractors
Page 1 of 1
Temperature: Hi: 65°; Lo: 46°
Day of the Week: Tuesday
1
CAT 140G
Grader
10.0
Hours
1
CAT 966E
Loader
10.0
Hours
4
10 Wheel
End Dumps + pups
10.0
Hours
!
CAT 980C
Loader
10.0
Hours
i
Water Truck
10.0
Hours
1
CAT 3306
Trackhoe
10.0
Hours
I
CAT 350E
Trackhoe
10.0
Hours
1
7ohn Deere 710 Backhoe
10-.0
Hours
1
CAT 4456
Backhoe
10.0
Hours
118
Wheel
End, Dumps
10.0
Hours
1
Supedntendent
10,0
Hours
I
Foreman
10.0
Hours
5
Operators
10.0
Hours
fi
Truck Drivers
10.+0
Hours
4 poorer 10.0 Hours
Spedal Inspector observations.. Contractors Hours; 7:00 am - 5:3n pm
Building.*2
Section 2602: Contractor placed 6.0 c.y and (15) 8-" drain conductors around exterior of building.
Section 151t}0: Contractor began plumbing dor underground.
Note: Unless otherwise noted, all materials appeared to be placed as per pians and
specifications.
Special Inspector: Bret McGowan
CeMfication r: 1035270
9R4+v�
P.O. Box 143
Rexburg, ID 83440
Daily Field Report
Project: Student Family Housing Facility Date: 5/21/03
Location: Rexburg., ID
Clients, BYU Idaho
Project No.: 03-0001
Equipme[!t:
HK Contractors
Werk Force:
Bateman Hall
HK Contractors
Page 1 of 1
Weather: Warm and breezy
Temperature: Hi: 74°; Lo: 47'
Day of the Week: Wednesday
I
CAT
140G
Grader
1
CAT
9,66F
Loader
CAT
10-.0 Hours
10.0 Hours
4
10 Wheel
End Dumps + pups
10.0
Hours
1
CAT
980C
CAT
Loader
10.0
Hours
1 Superintendent
I Foreman
5 Operators
fi Truck Drivers
10.0 Hours
10.0 Hours
10.0 Hours
10.0 Hours
10-.0 Hours
10.0 Hours
10.0
Water
Truck
L
CAT
33013
Trackhoe
10.0
CAT
350
ae
t
John
Deere 710 Backhoe
I
CAT
446B
Backhoe
1
18 Wheel
End Dumps
1 Superintendent
I Foreman
5 Operators
fi Truck Drivers
10.0 Hours
10.0 Hours
10.0 Hours
10.0 Hours
10-.0 Hours
10.0 Hours
10.0
Hours
10.0
Hours
10-0
Hours
10.0
Hours
10.0 Hours
Castle Electric 1 Foreman 10.0 Hours
,._,_ I Eleclrivan Appr�enfice 10,.0 Hours
Special ]Inspector observations: Contractors Hours; 7:00 am - 5:30- pm
.,01-cf =1-, f
Section 2202: Contractor placed pit run to sub -grade elevation north of Bldg.#1 & #2 in parking
lot area.
UtAties
Section 2202: Contractor placed 194' x 8" sewer line from sta. 11+83 to 13+27.
Note: Unless otherwise noted, all materials were placed as per plans and
specifications.
M
Aft.~
Special Iespector: Bret McGowan
Certification Number: 1035270
RO, Box 143
Rexburg, ID 83440
Daily Field Report
Projects, Student Family Housing Facility Date: 5/21/03
-a
Location* Rexburg,, ID Weather: Warm and breezy
Client: BYU Idaho Temperature: Hi: 74"; Lo: 47"
Project No.. 03-0001 Day of the Week: Wednesday
Equipent:m
NA
Work . owx:
Arn4bassador Const.
I Foreman
nters
lo.o ours
10.0 Hours
rs Hours; 7:00 am - 5:30 pm
Bulldin&Al
Section 2600: Contractor continued frarrEing 1.s' floor of building.
N'ote: Unless otherwise noted, all materials appeared to be placed as per plans and
spec tions_
Spedal Inspector• Bret McGowan
Certification Number: 1035270
P.O. Boz 143
Rexburg, ID 83440
Daily Field Report
Project: Student Family Housing Facility Date: 5/21/03
Locations. Rexburg., ID Weather: Warm and breezv
Client: BYU Idaho
ProjeCt NQ.: 03-0-001
Equipment
R. E. Bede Const
Work Force:
R. E. Beck Coast.
Page 1 of 1
Temperature: Hi: 74°; Lo: 4711
Day of the Week: Wednesday
I Generator
Grove RTSOOC Craie
1 Foreman
13 Concrete laborers
9.0 Hours
9.0 Hours
9.0 Hours
9,U Hours
i
Qj?grator 9.D Hours
Special InspectQr dbservationss Contractors Hours; 7:i1[] am - 4:30 pm
Building.#2
Section 7115: Contractor placed 14,0 c.y, of concrete, 2-"' rigid insulation,,, and #4 dowels around
perimeter of the east 1!4 of building for slab on grade.
Notes Unless otherwise noted, all materials appeared to be placed as per pians and
specifications.
Special Inspector: Bret McGowan
Certification Number: 1035270
P.O. Box 143
Rexburg, fD 83440
Daily Field Report --
Project: Student Family Housing Facility Date; 5/2.1/03
Location; Rexburg., ID Weather: Warm and
M
Page 1 of 1
%AMME D IV IUM-10mHi: 74°; Lo: 47Temperature11
a
Project Na: 03-0001, Day of the Week: Wednesday
HK Contractors
Work Force:
Bateman Hall
HK Contractors
1 CAT 14OG Grader
10.0 Hours
1
CAT 966F
Loa -der
10,.0
Hours
4
10 Wheel
End Dumps + pups
10.0
Hours
1
CAT
980C
Loader
10.0
Hours
1 Water Truck
1 CAT 330B Trackhce
1 CAT 350L Trackhce
1)ohn Deere 710 Backhoe
I CAT 446B Backhoe
1 18 Wheel End Dumps
1 Superintendent
I Foreman
5 Operators
6 Truck Drivers
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
4 Laborer 10.0 Hours
Special Inspector observations: Contractors Hours; 7:30 am - 5:30 prn
Building #3
Section 3300: Contractor core drilled 8"drain conductors for tie-ins to 4", PVC an roof
system around perimeter of building,
Note: Unless otherwise noted,, all materials appeared to bepaced r%jnspecifications. a pe;plans an
Special ]Inspector: Bret McGowan
Certification Number: 1035270
P.O. Box 143
�exburq, ID 83440
Daily Field Report
Project: Student Family Housing Facility Date: 5/21/03
Location: Rexburg, ID Weather. Warm and breery
Client: BYU IdahoTemperature: Project No.:03-0001 i.1P 740; Lo: 47"
-
-Day of the Week: Wednesday
Equipment:
RE E. Beck Const.
1 Generator
9.0 Hours
Work Force.a.
RE E. Beck Const., 1 Foreman 9.0 Hours
_ _ i 1 Concrete laborers
9.0 Hours
s�eceal inspector observations: Contractors Hours; 7:30 am - 4:30 pm - -
Building #4
If
Section 3300: Contractor placed 30.0 c. of concrete, rei
walls on west half of building. Y rang and anchor bQl�s for stem
lYQte: Unless otherwise noted, all materials appeared tv be placecf as pernd
specificationsk a,
Specka1 :Inspector: Brei, McGowan
Certlfimtlan Number. 1035270
P.O. Box 143
Rexburg, ID 83g40
Daily Field Report
Project: Student Family Housing Facility pate: Snwmz
Location: ReXburg, ID
Oient: BYU Idaho
Project No.: 03-0001
Equipment:
HK Contractors
Work Force:
Bateman. Halt
HK Contractors
Weathern: Warts and clear
Tem raWre.v Hi: 77°; lo: 46°
Day of Hie Weeks. Thursday
1 CAT 140G Grader
1 CAT 966E Loader
4 10 Wheel End Dumps + pups
1 CAT 980C Loader
1 Water Truck
1 CAT 3306 Trackhoe
1 CAT 350E Trackhoe.
o n eere. 710 l-.
CAT 446BB #
118 Wheel End Dumps
1 Superintendent
1 Foreman
5 Operators
fi Truck Drivers
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
HoUrrs
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
10.0
Hours
r observationsaw Contractors Hours* 7:00 am 5.30 pm
Site Grading
Section 2202: Contractor backfilled om
interior of the east half of Bldg. #A.
Contractor- backfilled for drain vanduct�rs ara�nd ex�er�or odg.#3.
Note: finless otherwise Hated, all materials appeared to be placed as per plans and
specifications.
rc
Special Inspectvr; gree McGowan,
CerbficatiQn Number: 10-35270
P.O. Box 143
Rexburg,, ID 83440
D aily Field Report
PI'o1Pri�e Cfi �`lon* F�...H6, u,..._.__ �'_
Page 1 of 1
.....y � ��u�niy racmry Date: 5/22/03
Location: Rexburg, ID Weather; Warm and dear
Cliento: BYU Idaho Temperature: Hi: 77°; Lo: 46°
Project No.:03-"l Day of the 1Neek; Thursday
Equipment -,0
R. E. Beck Const.
Work Force:
R. E. Beck Const.
1 Generator
I Grove RT500C Crane
1 Foreman
11 *� fp%ffl%�
9.5 Hours
9a5 Hours
9.S Hours
�..w1 Ra t-mLe raovrers 9.5 Hours
1 Q a�or --. 9.5 Hours
Spedal
IP��" �'v'a�i�ns: Cvn�ors Hours; 7:3U am - 5;3p pm,
Buihfian#2
Sedan 7115: Contractor placed 30.0 c,y. of concrete, �" rigid ir0$ufation, ani #4 dowels for slab
an grade,weSt 3/4 0f Building.
Note: Unless Otherwise noted, all materials appeared to be Placed as per plans and
specifications,,
SPecialInspectormet McGowan
CeMA&utiUMBr
cation Numbers. 1035270
P.O. Box 143
Rexburg, ID 83441
Daily Field Report
Project,: Student Family Housing Facility Date: 5/22/03
Location: Rexburg, ID
Client:Weather: Warm and clear
JUdrl()
Project No.: 03-0001
Equipment
NA
Page 1 of 1
Temperature: Hi: 77"; Lo: 46°
Day of the Week; Thursday
Work Fof re
Action Mechanical I Foreman 5.5 Hours
4 Plumbers
5--S Hni im
mpeuai Lnspector ObServaUons: COntractors Houm'* 9:00-�
I am -3:00 pm
Building #3
1gon46
.S
by ClitVSection 3300: Underground plumbinq aD rovedmwsw 111city -., ins�� pector,
Notes Unless otherwise noted, all materials appeared io be placed as per plans and
sPeCifications.
Spial Inspector: Bret Mc -Gowan
CeMficatlon Number: AM
,035270
_ _*moiIL F
ice•
E
,
AP
oa
16 7
- �_ � � - � 4 „r• - ." AMY•
a 4g 46.1
yyyy
SL
r
r.= `F
vz
qp
-11-7
'.. AW
q
_ � h
• i� ,, ", tee.
at
i•6 _ y-�
�x
atv
P.O. B13
Daily Field Report
Project: Student Family Housing Facility Date: 5/20/03.
LoCallor", ReXt)Urg,, ID
Client: BYU Idaho
Project Na: 03-0001
Equipment;
JL11 I , L4 1, 1 -41
Building #6
Page 1 of 1
Weather; Cool and overcast
Temperature: Hi: 650; Lo:26 0
Day of the 'Week: Tuesday
Section 3300: Contractor began laying out footings for, Bldg.#6. Observed acomer of
building's footing line would be bearing on power duct banks (see attached photo). Notified
contractor and Lloyd/BYU Idaho,,
a
Note'n'Unless otherwise noted, all materials a rxmn�red tn beSPecifications.vl;:;;u %-%.v placedplans an
Special ]Inspector: Bret McGawan
CAMfication Number. 1.035270
P.O. BOX143
Rexburg, ID 83440
Daily Field Report
Project: Student Family Housing Facility
:Date: 5/22/03
Location: Rexburg, ID Weather; yyarm
and clearr1;="6
BYU -
Project No.: 03-0001
Equipment:
Rs E. Beck Const.
Work Force:
R. E. Beck Const*
Tem rature: Hi: 77°;00 46 0
Day of tine WeekThursday
I Generator
I Grove RT50-0C Crane
1 Foreman
13 Concrete laborers
1 Operator
r7 r
9.5 Hours
9.5 Hours
9.5 Hours
9.5 Hours
19--F; Hnrlm
Section 3300: COntractvr placed 2.0 c.y,, of concrete and reinfOrcing steel for east 1/3 of south
footing line.
Contractor moved footing line to avoid bearing on power duct banks as per re]�"rt r%f% for Bldg.#6
dated 5-20-03 (armed is a photo of this dam concrete placement for that location),
appeared
Note.m. Unless otherwise noted, all materials
to 1a�; plaae�d
sPecification.s. a per pans and
SpealciInspector:
Bret McGowan
CertlNcation Number: 1035270-
,tr•
a
" sa s + •a.. r 4 - �y-��FF
�', _ - W�' - f • ' � ._. e n -eF � � � s s.e�aal_sev-
u. •
_ �, e•' r •ice r d ,x 4
$.
a �_ - ..w - .�., it F - • r amR 'R ' • �g• -'4 . ' e n of ' r - •.
of
id
p 4
, e
� Lam• ._k • _ r - _ ,.
Lz
e
� 4Z,•
1
s
- F
.. r• _ _Wt- d
e.
e
4A
400
ti M,
■# t ' Yep. Fj _ � ` n •.- .:� �`.� d �' R�
IL
44
_
de
e
I'
k
e.
• s
e ' S
}
_ a
i r
e -
e
.. - . _..r - � •' . : � ■ V � _rte ' - rt>
a •
r
r:
4
R r,,
Project: BYU Idaho Student Family Housing
Project No.: 03-0001
Mix No.: 192
Report No..: 1
Contractor: HK Construction
Supplier: Watters Ready Mix
Sdvchtres: Thrust Blocks
Mix Design Components Mix Design Proportions
Cement Type I & Il LA 564 lbs.
Water 33 gals./275 lbs.
C.A.: 3/4" Rock 3-F 96 ASTM C 33 1781 lbs,.
F.A.: Sand MA -22 ASTM C 33 1251 lbs,.
MB -AE 90 ASTM C 260 1 oz./cwt.
Prokrete N ASTM C 494 3oz./cwt. cement
Sand/Aggregate Ratio 43%
W/C Ratio .40
Air Content 3.0% +/-1.0%
Specified Yc (psi)= 4000
ID
Cyl.
Corr-
Cyl.
Date
Test
Test:
Total
Com
P
RwL
Diam.
Fact.
Area
Cast
Age
Date
Load
Sbren
Height
1005A
6"'x'12""
1.00
28.26
4-30
7
5-7
81500
2M
Neo.
Shear
1005A
6"'x'12"r
1.00
28-26
4-30
28
5-28
127000
Neo.
Shear
1005A
6ffxl2;"
1.00
28.26
4-30
28
5-28
130000
1 2880
Neo..
Shear
Neo-= Neoprene cap. Sul.= Sulphur cap ASTM C 617
Remarks.a
fteviaftql-"Vw lilffiffr
By: Bret L. McGowan/President
�C , J�/0%0 3
CC: BYU Idaho, City of Rexburg, Walters Ready Mix, JHS Architects, Batemab Hall, R.E. Beck
Const.
Rqx 143
-210 8, 0 3 - If
Re\?"iburg,r Tf'-7,,'F 3&�4A-j
Project: BYU Idaho Student Family Housing
Project No.; 03-0001
Mix No.: 902
Report No.: 1
Contractor: R. E. Beck Construction
SuRplier:lNalters Ready Mix
Structures: Footings &stem walls
Mix Design Components Mix Design Proportions
Cement Type I & If LA 480 lbs.
Water 29 gals./241 lbs.
C.A.: 3/4" Rock J -F 96 ASTM C 33 1794 lbs.
- F Sand MA -22 ASTM C 33 1260 lbs.
MB -AE 90 ASTM C 260 1 oz./cwt.
Prolvete N ASTM C 494 3oz./curt. cement
Sand/Aggregate Ratio 43%
W/C Ratio -DF�Uf%
Air Content 5.0% +/-1.0%
Spedfied
fc
2500
ID
CO
corr.
CO-
Date
Test
Test
TO tal
Compress.,
Cap
F ract
Diam. &
Fact.
Area
Cwt
Age
Date
Load
Sbvngth
lm�eiot
0998A
6""x1 "
1.00
28.26
4-14
7
4-21
52000
1840
Neo.,
Shear
-0999A
&xU"
1.00
28.26
4-16
7
4-23
53000
1875
Neo.
Shear
1000A
VxU"
1-00
28.26
4-17
7
4-24
71500
2530
Neo.
Shear
1001A
6�W2"
1.00
28426
4-18
7
4-25
64500
2285
Neo.Shear
1002A
6"xOrr 12
1.00
28.26
4-21
7
4-28
52000
1840
Neo
Shear
1003A
VxU"
1.00
28.26
4-23
7
4-30
95000
3360
Neo,
Shear
1004A
1.00
28.26
4-29
7
5-6
550,00
1945
Neo.
Shear
Neo_ = Neoprene
cap.
Sul.- Sulphur
cap ASTM
C 61-7
Remarks:
■r , F
77ETZ"T�hw' I
CC: BYU Idaho, City of Rexburg, Walters Ready Mix, JHS Architects,. Bateman Hall, R.E. Beck
Const.
COMPRESSIVE STRENGTH SUMMARY
F ti
J, Av
%J 1.5
z A
Project:
BYU Idaho Student Family Housing'
Project No.: 03-0001
Mix No.,: 902
Report No.: 2
Ccntractor: R. E. Beck Construction
Supplier,., Walters Ready Mix
Strutturws: Footings &stem walls
Mix Design Components
Mix Design Proportions
Cement Type I & II lA 480 lbse
Water 29 gals./241 lbs..
C.A.: 3J4" Rock) -F 96 ASTM C 33 17941bs.
F.A,: Sand MA -22 ASTM C 33 1260 lbs.
MB -AE 90 ASTM C 260 1 Oz./cwt.
Prokrete N ASTM C 494 3oz./cwt, cement
Sand/Aggregate Ratio 43%
W/C Ratio .-J"@"-U^
Air Content 5.0°x6 +/-lso%
Slump 4" +/-1"
'"fie -d Irc (P,�i 2500
ID Carr. CYIN Date Test: Test Total COMPE cap Fracture
Diem. FC Area cast Age Date Load Strength
Height
099,8B 6"x12" 1.00 28.26 4-14 28 5-13 8"0 2830 Neo. Shear
0998C 6jr",12-,rff 1.00 28-26 4-14 28 5-13 83060 2940 Neo. Shear
0999B 6firxl2,'v 1.00 28.26 4-16 28 5-14 96000 3400 Neo. Shear
0999C 6""xV" 1.00 28.26 4-16 28 5-14 82000 2900 Neo.. Shear
1000B 6"Fx12"" 1.00 2 -
8.26 +17 28 515 72000
JOOrOC 1 2550 Nea. Shear
Vx12" 1.00 28--26 4-17 28 5-15 78000 2760 Neo, Shear
1001B 6ffx12" 1.00 28.26 4-18 28 5-16 92000 3260 Neo. Shear
1001C 6"'x'12" 1.00 28.26 4-18 28 5-16 97000 3430 Neo. Shear
1002B Vx12 1.00. 28.26 4-21 28 5-19 96000 3400 Neo.
28.26r Shear
1002C 6N12"' 1.00 4-21 28 5-1-9 86000 3040 Neo. Shear
1003B 6"'k12" 1.00 28.26 4-23 28 5-21 119000 4210 Neo. Shear
1003C 6""x12"" 1.00 28.26 4-23 28 S-21 118000 4180 Neo- Shear
1,006A 6"xl2l-' 1.00 28.26 5-2
7 5-9 76250 2700 Neo.
1007A 6"'xI2" 1-00 28.26 5-6 - Shear
7 513 76250 2700 Neo. Shear
1,008A 6"5(12 IF 1.00 28.26 5-8 7 5-15 62500 2210 Neo, Shear
1009A 6rx'l2 LOD 28.26 5-12 7 5-19 51000 1810 Neo- Shear
Neo'- Neoprene cap, SO.= Sulphur cap ASTM 617
Remarks:
A
Revi....ftsma
, BY: Bret L McGowan/President
CC: BYU Idaho, City of Rexburg, Walters Ready Mix, JHS. Architects, Bateman Hall
0 cyY� 71
'
.
I Ll I U 4 ININ 01 AL
Project: BYU Idaho Student Family Housing
Project No.: 03-0001
Mix No.: 902
Report No.: 3
Contractor: R. E. Beck Construction
pplier.: Walters Ready Mix
Structures: Footings &stem walls
Mix Design Components Mix sign Proportions
Cement Type I & II LA 480 lbs.
Water 29 gals./241 lbs.,
C.A.: 3/4" Rock 3-F 96 ASTM C 33 1794 lbs.
F.A.: Sand MA -22 ASTM C 33 1260 lbs.
MB -AE 90 ASTM C 260 1 oz./cwt.
Prokrete N ASTM C 494 3oz./cwt, cement
Sand/Aggregate Ratio 43%
W/C Ratio .50
Air Content 5.0% +/-1.0%
Slump 4" +/4"
SPeaffiled FC (psi)= 2500
ID CYIP come Date C
� YL Test Tftt Total COMP. Cap FerreDias FadL Area calst, Age Date Load Sb -e
Height
0
a
-.426
1004B 6"xU" 1.00 2 8 im '92-' tax 4-29 28 5-27 94000 3320 Neo.
I 7e Shear
1004C 6"xl.2"" 1.00 28.26 4-2-9 28 5-27 94000 3320 Neo. Shear
1006B 6"A2" 1.00 28.26 5-2 28 5-30 97000 3430 Neo. Shear
1006C 6"xlTr" 1.00 28..26 5-2 28 5-30 101000 3570 Neo. Shear
10070 6NIZ" 1.00 28.26 5-6 28 6-3 104000 4210 Neo
10070 6wx12" 1.00 28.26 5-6 28 6-3- 1,01000 3570 NeD. Shear
1008B 6"x12" 1.00 28.26 5-8 28 6-5 119000 4210 Neo. Shear
1008CVx-
U" Shear
1.00 28.26 58 28 6-5 IVA= 4070 Neo. Shear
1009B 6N12" 1.00 28.26 5-12 28 6-9
ff 1 110000 3890 Neo. Shear 009C 6'7"x!2 1.00 28P.26 5-12 28 6-9 112000 3960 Neo. Shear
1010A WIX121", 1.00 28-16 5-19 7 5-2-6 92000 2700 Neo. Shear
10108 6"xl2lw 1-00 28-2.6 5-19 28 6-16 130000 4600 Neo. Shear
1010C 6"xU" 1.00 28.26 S-19 28 6-16 134000 4740 Neo. Shear
1011A 6N12'w 1.00 28-26 5-27 7 6-3 74WO 2.620 Neo. Shear
1012A 6"x12" 1.00 28.26 6-9 7 6-16 94000 3330 Neo. Shear
1013A 6"x12'r 1.00 L 2826 6-10 7 6-17 71000
Neo-= Neoprene cap.2510 Neo. Shear
Sul.= Sulphur cap ASTM C 617
Remarks:
Bye R�ieweda
Bret L. McGowan/President
CSC: BYU Idaho, City of Rexburg,, Walters Ready Mix, JHS Archiiect�'Bateman Hail, R.E. Beck
Const.
I T I -
'NJ ■ �
i
`08-403-1866
e:.
K e.K b u r, ID 81"3'440
Project: BYU Idaho Student Family Housing
'a
Project Na; a3 -ODOR
Mix Na.: 902
Cement Type I & II LA
Water
C.A.: 3/4" Rock 3-F 96 ASTM C 33
F.A.: Saul MA -22. ASTM C 33
MB -AE 90 ASTM C 260
Prokrete N ASTM C 494
Sand/Aggregate Ratio
W/C Ratio
Air Content
Slump
filed fc
= 2500
Report No,: 4
Contractors. R. E. Beck Construction
Suppler: Walters Readynx
StTuctUres: Footings &stem walls
MiX Design PrvpOrtivns
480 lbs.
29, gals./241 lbs,.
1794 lbs.
1260 lbsw
I Oz./cwt.
3oz./cM. ,cement
43%
.50
S00% +/-J.O%
411 +/,lfr
ID CO. Corr. C"61 Date Test Test Total COMP. Cap FracWre
Age Dat Load Strength
Height
1.00 28-26 5-27 28 6-2-4 129000
1 4560 Neo Shear
1011C 6"txl2'rjr 1.00 28.26
- -
24
Shear
160"x12" 1. _ , _ Neo
1 28 - 119200
r# 1.00 26 6Shear
-1013B 6"xl2'rr 9 28 7-7 121400 w
28.26 6-104300 shear
1013C 6"xl7r" 1.00 28.26 6-10 28 7-8 115200 4080 NeO. Shear
1014A 6"jx'12"'r 1.00 28.26 6-12 7 6-19 114400 4050 Neo. Shear
1015A "# .1 "? 1 65000 2300Neo.
28.26 6-17 -Shear
101 "1'F" �� 2330 ileo. Shear
7 6-25 7300 2580 . Shear
+� pr cap. Sul.= SU
- cap ASTM C 617
Remarks;
Reviewed By-,* Brei L. McGowan/President
CC: BYU Idaho, City of Rexburg., Wailers Ready Mix, ,QHS Architects, Bateman Mall, R_E. 6ec�C
Cons-,
P.O. Box 143
Rexburg, ID 8344.1,
Da_ily Field Report
Project: Student Family Housing FacilitydDate5/12/03
Location: Rexburg, ID •-----. CH t& BYU Idaho
Project No.: 03-0001
Equipment,
HK Contractors
Eagle Rock
Work farce;
Bateman Hall
HK Contractors
Page 1 -of 2
weamer: [cool and overcast
Temperature:Hi: 5�°; Lo. 4a°
Day of the Week: Monday
1
CAT 1406
Grader
9.0
Hours
I
CAT 966E
Loader
9.0
Hours
4
10 Wheel
End Dumps + pups
9.0
Hours
1
CAT 9800
Loader
9.0
Hours
1
Water Truck,
9.0
Hours
1
CAT 3306
Trackhoe
9.0
Hours
1 John Deere 710 Backhoe
1 CAT 4466 Backhoe
3 18 Wheel End Dumps
2 Drill Rigs
i Superintendent
.1 Forema n
4 Operators.
S Truck Drivers
3 Laborer
2 Blasters
2 Drillers
9.0 Hours
9.0 Hours
9.D Hours
9.D Hours
9,0 Hours
9.a Hours
9.a Hours
9.0 Hours
9.0 Hours
9.0 Hours
Q_n F-flni arc
av%"ai .Lnspectorobseryativns: Contractors Hours; 7:00am - 4.3Q pm .
Site Gradinq
Section 2202: Contractor continued excadating aid stockpiling blasted material from utility
trenches., Reject sand 'From Ashcroft pit was hauled in for trench bedding and hack#i�E.
Contractor continued excavating rock for Bldg.#7, rock removal was performed using a oe ram.
Contractor Completed drilling dor blasting on 8idg.#1% then blasted Bldg.#I3.
Contractor began backfilling around perimeter of 8fdg.#1.
Contractor completed excavation of blasted material for rack removal Bldg.#10.
Special Inspector: Bret McGowan
Certification Number: 1Q35270
P.O. Box 143
Rexburg, ID 83440
Daily Field. Report
Project: Student Family Housing Facility Date.,,, 5/12/03
v`_ ,
Page 2 of 2
Section 2601: Contractor plaCed 4"' PVC pipe around perimeter of f3ldg.#1 for roof drain systems.
Section 1.6111; Contractor continued p�a�mg etec�tieaiBldcl.#4�ondui�araund , #5 & #�.
Contractor died electrical conduit inti Bldg.,#3 & #4.
3 field densities were taken around perimeter of Bldg.#t at 1` below sub -grade. AI! tests were
found to meet minimum compaction requirements,
Note: Unless otherwise noted, all materials were placed as per pans and specifications.
Spedall Inspector: Bret McGowan
Certification Number: 1035270
P.O. Box 143
Rexburg., ID 8344o
Project: Studentr Daily FieldReport
Family Housing Facility Date; 5/12/03
Location:
Rexburg, ID
Client BYU Idaho
PrOTeCt No.: 03-0001
Equipment:
NA
Page 1 of i
Weather: Cool and overcast
Temperature: Hi: 55"; Lo: 400
Day of the Week: Monday
Work Force,a
Action Mechanical I Foreman 8.0 Hours
dE41hodh 9 jW 6 Plumbers R 1) Hni irc
z4icuidi u1spector Observations : Contractors Hours; 8:00 a 4:30 Pm
Buildin # 1
Section 15100: Contractor Continued piumbing South. east. and West Stem walls had to
be chipped out for vent Pipes.. Approved by Randyj]HS arch,
Spoke With Randy/JHS Arch. in regards to anchorbv�ts� R to
interior and exten"Or walls, I S/8jrl x 12"a i111.'..'111Lj1n 5/" X are on a
to LA-- placed on party walls only,
Note: Unless otherwise noted, all materials were Placed as per plans
and vurkiCimfir-ations.
Special InsPectOrR Bret McG,gwan
Certifica#ion Number: 10352,70
17
P.O. Box 143
Rexburg, ID 8r3440
Daily Field Report
Project: Student Family Housing Fadlity Date: 5/12/03
Location: RRexburg, ID Weather's Cod and overcastClient: BYU Idaho
Pn»ait Nn • m. -Mm Temperatures. H-1: 55°; Lo: 40°
- -'-� -._.. "' """� Day of the Week: Monday
Equipment:
R. E. Beck Const,
Work Farce;
R. E. Beck Const.
I Generator
1 Grove RT500C Crane
9.D Hours
9.0 Hours
1 Foreman 9.a Hours
13 Concrete laborers 9.0 Hours
� Operator 9.0 Hours
SPecival Inspector observations: �Cantraetars Hors; 7:00 am - 4:3Q pm
au.ildin # 2
Sedion 7115: Contractor began placing damp proofing on exterior stem wars for Bldg,#2,
1"�ate: Unless otherwise noted, all material's were placed as per pians and specifications
..
Special Inspector: Brei McGowan
Certification Number; 1Q35270
P.O. Box 143
Rexburg, ID 8344:1
Dmlay Fl.
aeld Report
Project: Student Family Housing Facility Date: 5/12J03
Location: Rexburg, ID Weather. cool and overcast
Client: BYU Idaho
Project No.: 03-0001
Equipment:
R. E. Beck Const.
Page 1 of 1
Temperature: SS°; lo: 40°
Day of the Week& Monday
1 Generator 8.0 Hours
IN
Work F"ce.
R. E. Beck Const. 1 Foreman
8.0 Hottts
13 Concrete laborers R_n Nn, fm
Ow"ud, JLnspector obselrvations* Contractors Hours; 7:30 am - 4:00 pm
Buildina #3
Section. 3300: Contractor placed approximately 22.5 c.y. of concrete for stem walls on east half of
BIdgv#3v Spoke with Randy/]HS Arch., 10,f anchor bolts shall be used on exterior walls only, 1
5/8" x 12" anchor bolts at 48'r o.c. for party walls.
TesUnq
Section 33D0: Concrete was sampled and {I} set U0 -11C 4 cylind
foollows... ers was cast. The test results were as
Slump= 4.0"
Air Cont.= 4.6%
Conc. Temp.= 60°
Air Temp.= 550
Nate; Unless otherwise noted, all materials were planed as per plans and specifications.,
Steal inspector. Bret McGowan
CeMfkation Number: 103527a
�{,�
tih. � y
5, Y
4
.0 Boy. 14.7t
"D 847; 0
-e.)(bu?
tr t �` i
Project Name: Student Family Houging
Project ® -0001
Repo rt D ,i its-* June 21 5 2003
Sample D�t: March 1 . 2.003
Location; Ashcroft Pit
Descrliprjon: 4" - Base
Sample #-. s- 1 Doo
% Moisture:
Sand Equivalency:
Ir
SIEVE ANALYSIS REPORT
Sieve She
mrn
Sieve Size
% passing specs
125
1"
100
119
6
12.5
,"
1
.
4.75
#4
31
236
#8
26
IA
1
0,600
#30
1
0-30
0.15
#100
-075
#200
3.6
Sieve Analysis
100
90
80
60
EL
so
40
30
20
AEL
25 19 1-6 9,5 4.76 1,18 0.
600 0.30 0.45
Sieve S ize
If you have any questions regarding this report, pleasefeel
free to contact U.,3-
Respectfiffly,
TM CONSULnNG,
Bret McGowan
President
Awl
IZ 3
ar
�xbu,T, 1D 8-..1- 1-10
PROCTOR ANALYSIS
MOISTUREDENSITY CURVE
MAX, DENS, PCF 126.9
OFT, MOIST % 11.2
CORRECTED DRY DENSIS'` =
CORRECTED OPT. MOISTURE
,0 7.010.0
Moisture contentx
0.0 C3 I)to Points. - ers-
11.0
12.0
MAX DENSITY
1f you have any questions regarding this report, please feel free to contact me at (248) T57 -91T2.
Respectfully,
T2M
Bret McGowan
President
14.0
128.0
SIEVE SIZE iVIM
°Ice PASS
SIEVE SERE IN150
126.0
124.0
122.0
37.5-
120.0
25
118.0
MOISTUREDENSITY CURVE
MAX, DENS, PCF 126.9
OFT, MOIST % 11.2
CORRECTED DRY DENSIS'` =
CORRECTED OPT. MOISTURE
,0 7.010.0
Moisture contentx
0.0 C3 I)to Points. - ers-
11.0
12.0
MAX DENSITY
1f you have any questions regarding this report, please feel free to contact me at (248) T57 -91T2.
Respectfully,
T2M
Bret McGowan
President
14.0
SIEVE SIZE iVIM
°Ice PASS
SIEVE SERE IN150
T
37.5-
25
�n
19
3{4" 96
12.5
117
9.5
4.75
13/87
# 4
2.36
# 8
'l-18
# 16
•60
# 30
_425
# 40
.30
50
.'i5i}
#ifs
.075
# 200
MOISTUREDENSITY CURVE
MAX, DENS, PCF 126.9
OFT, MOIST % 11.2
CORRECTED DRY DENSIS'` =
CORRECTED OPT. MOISTURE
,0 7.010.0
Moisture contentx
0.0 C3 I)to Points. - ers-
11.0
12.0
MAX DENSITY
1f you have any questions regarding this report, please feel free to contact me at (248) T57 -91T2.
Respectfully,
T2M
Bret McGowan
President
14.0
� b r!&Axl-u
*of
PROCTOR ANALYSIS
IL
116.0
114.0
12,0
110,0
108.0
_0
MOISTURE DENSITY CURVE
MAX. DENS, PCF 113.5
OPT. MOIST, % 13.5
CORRECTED DRY DENSITY
CORRECTED OPT. MOISTURE
. - i tiF
14-0 15.0 16-0
Moi
-
oi t rContent,,
Data Points DENSITY
If you have any questions regarding this report, PLease feed' free to contact me at (208) T51 -91i2.
Respectfuoy,
T2M
Bret McGowan
President
1 TO
bfC l�
O Box
43
�, rbc
r+
e,Xbu.,!,, D x
Project i Student Family hl u ire
Project -- 03-.0001
Report ate; Jun l
7 2003
Sample ate= Mafch 21., 2003
Location: Native on site material
1
Description: Bfown silty d
Sample : s03-1002
% Moisture: 10.1
Sand Equivalency: 1
So 1_1 Classification
SIEVE ANALYSIS REPOIRT
Steve. see
mrn
Sieve Size
% Passing
19
3 "
100
1.
1
100
-9.5
381`
100
4.x`5
.
1,18
#
97
0+600
#30
93
3#50
7
0.15
# 1100
55
+075
##200
32.0
Sieve Analysis
so
771,
Im 70
ICL
2 40
0
20
Steve Size
If you h e -any q uesti rr regarding d-xir lease fc l t o
to contact us.,
T2M CONSULTING,
Bret McGowan
President
Project N-arnr-: Student Family Housing
]Project #: 03-0001
1port Date: June, 212 2003
S,_i1rnp1c Date: March 273. 2003
Location: H -K Pit
Description-- Pit Run
Sample #: S03-1004
% Moisturt: 4.7
Atwrberg Limit,- Non Plastic
Soil Classification G W
SIEVE ANALYSIS REPURT
Sieve Sizel
Mm
Sleve S__Ize
% Passi Specs
Ing
275
77
19
3/4q
MOPENUM
72
12.5
I
9.5
3/8
63
4.75
#4
55
2-36
# 8
46
1.18
#16
33
0.600
#30
14
0_30
#50
6
0-15
4
0-075
#200
3.2
Sieve Analysis
100
so,
70
60
SO
40
30
20
.dkk,L
0
251.$ I 9.5 4 75 2.36 1,18 GAUD 030 0_16 0.075
Sieve Size
If you have anv questions regar&
tUS rePOM Please feel free to contact us.
Respectfijily
J1
T2M CONSULTING,
Bret McGowan
presadent
%J
ID 834-�-"O
a'q I fii
I EVE LYSIS
NEVE SIZE W I SIEVE SIZE I % FABS
50
T
37.E
1 112°
116.0
Z
to
114.0
3!4" 72
Q
112.0
9.5
0
110-0
a'q I fii
I EVE LYSIS
NEVE SIZE W I SIEVE SIZE I % FABS
50
T
37.E
1 112°
25
3!4" 72
12.5
112n
9.5
318 J]
4.75
#4
2.36
# U
.425
# 40
•3i3
# 50
.150
# 100
.075
# 200
MOISTURE DENSITY CURVE
MAX. DENS, PGS 115.6
OPT. MOIST, % 115
CORRECTED DRY DENSITY =126.5
C4RRECTED QST. MOISTURE = 9.3--
MV
0.0
f o
[a 11.0
Moisture Content, '°
Data Points --- iries
12.0
MAX DENSITY
If you have any quesfions regarding this report, please feel free to contact me at (Zt�j� 757-9172.
Respectfully,
T2M
Bret McGowan
President
13.0
Project Name: Student Family Housing
Prof-ect #: 03-0001
Report Date: June 21 2003
Samrfl.e Dar
K- - e - March 27, 2003
Location: 11- K fit
Description 3/4n Agg. B:ase
,Sample #: s03-1005
% Moisture: 03
Sand Equivalency: N/A
S'l I i
Ola GW
100
so
80
SIE`LIE ANA -Lysis REPO1tT
Siteve Slze
,0 Box 143
extaurg., ID
83440
Project Name: Student Family Housing
Prof-ect #: 03-0001
Report Date: June 21 2003
Samrfl.e Dar
K- - e - March 27, 2003
Location: 11- K fit
Description 3/4n Agg. B:ase
,Sample #: s03-1005
% Moisture: 03
Sand Equivalency: N/A
S'l I i
Ola GW
100
so
80
SIE`LIE ANA -Lysis REPO1tT
Siteve Slze
MM
Steve size
% Passing Specs
25
1"
100
19
3/4
94
12.5
1/2
mmmmb�
7 2
9.5—
3/8"
... MA
6 4
4.75
#4
50
2.36
#16
-)8
0.600
"0
#30
16
0.30
3 0
#50
9
0.15
#100
0.075
#200
4.22J
Sieve AnalVs-1,S
20
10
0
---r J. Its U.GG0 0.30 DA .5 DA76
Sieve Size
If YOU huLve any questions regarch-ng thjs report, Please feel free to contact us,
RespectUly,
T2M CONSULTING,
Bret McGowan
President
::xbur g--, 1D
nut
PRoeroRANaLvsis
SIEVE AN&YSIS
Client BYU of Idaho SI EW S12E MM
KW SIEVE SIZE IN % PASS
Pmject Name: Student Familv Hogs 50 2
PLDLect #: 03-001
37.5 1112
Sam "I L-Pitn: HK25
3/
Visual Descdpfion.' bwe 19 3/4
100
Tested By -w Cjwton Mww
12.5 1/2
Go mon Method: C
9.5 3t8n
Cylinder I., cf: 0.075
Lab #-9 03-1005
Date
ISI 27.1 2003 1.18 # 16
Ma,
sl
Date Tested 8Ln 17, 2003
.
NEENEEMMEbumpmp-M 60 # 30
Fractured Face: 1 side=68.-I50. -425 # 40
.30 # 50
.150 # 100
.075 # 200
--S'-Ar�--C MONO=
MOISTURE DENSITY CURVE
MAX. DENS, PCF 129.0
OPT. MOIST, % 9.5
CORRECTED DRY DENSITY
CORRECTED OPT, MOISTURE
W,
9.0 91.5 10.0
Moisture Content, %
0 Data Points --- Seri
eS2
10.5
MAX DENSITY
If you have any questions regarding this report, Please feel free to contact me at (208) 757-9172,
Respectfully,
T2M
Bret McGowan
President
11-0 11.5 12.0
130.0
CL
128.0
2�
2
16.0
124.0
122.0
MOISTURE DENSITY CURVE
MAX. DENS, PCF 129.0
OPT. MOIST, % 9.5
CORRECTED DRY DENSITY
CORRECTED OPT, MOISTURE
W,
9.0 91.5 10.0
Moisture Content, %
0 Data Points --- Seri
eS2
10.5
MAX DENSITY
If you have any questions regarding this report, Please feel free to contact me at (208) 757-9172,
Respectfully,
T2M
Bret McGowan
President
11-0 11.5 12.0