HomeMy WebLinkAboutRESPONSE TO RFI - 03-00015 - BYUI - Student Housing 16 Buildings (160 units)i Project: NYU -I Student Family Housing Architect's Project #0201 16 June 2003 Reference: RFI No.: 29 RSI Description/Title: TO: gateman - Hall Inc. RESPONSE TO RFI I I �- -° till, Reference: None Discrepancy on Shear Wall Locations Fax #'s 524-4435 & 3564753 Attention: Doil Clements Written Description of Proposed Solution/Clarification (Attach Sketches as Required; JHS Architects, P.A. Pocatello, ID 83204 Issued By.. (208)232-1223 Randy Hayes drawing A3.3 is correct. Delete the delta 44,symbol at the wars between the 2BR units and the Townhouses. The delta 4 wall occurs at both sides on the lower level only. By: s --Jr. 51 en -0 11 211, 11 1 �, I ljl�d� IZZA". Aft Mae" mm pocaftr& FaMicrwousiNc BYU IDAHO GRADING CHANGE GRADING CHANGE CRWIM NAW CO3 I M., :ZQ "n oft M rA _WMI­ Rem sibg.;7 ; m I .110 FjW A ki W.,k W� Ir U-91, t dw Is IN FW) 1 i1mch = so fL _0% i lip .4il, A - FAMILYMOUSING BYU IDAHO GRADING CHANGE CO3 smolom Project: BYU-1 Student Family Housing Mffdft Architect's Project #0201 Date: RFI Na.: 02 May 2003 1 13 pU- �D I 1l 4 "K- 7 _1 JHS Architects, P.A-,, 125 NGaffield Pocate Ile) ! D 83204 (208)232-1223 C C -�! RESPONSE TO �tFl-13 REVISED Project: BYU-f Student Family Architect's Prokect Date: 02 May 2003 Dwg. Reference: Housing #020 1 RFI No.: 11 R E C4.1, C4.2, A1. 1, A1.6 RESPONSE TO RFI ISED Spec. Reference; None JHS Architects, P.A. 126 North Garfie[d Pocatello, fa 83204 (208)232-1223 zX gk�L DD, RFI Description/Title: Question Concerning storm Drains at Bldg. #3 & #7 To: Bateman -Hall Inc. Attention. issued By: Fax 524-4435 10. Dail Clements Randy Hayes Written Description of Proposed solution/Clarification (Attach Sketches as Required)-. 1. Atbuilding#3,- There are three options availably for the storm drain for this building. a. The drain dor the entire building could be tied to the catch basin to the south west of building #3. b. The drainage forthe upper end of the building could be died to thestub from SDMH #1..... fhEs stub is already installed. The drainage for the Tower end of the building, could be tied to the catch basin to the southwest of building #;3. C' The stub from SDMH #1 could be reinstalled at a fewer elevation to allow the building drain to be deep enough to meet the 3'of paver. The most cosi effective solution should be pursued. Review with Brei McGowan. 2. At building #7: Run the storm drain dor this building to SDMH #3. The building drain layout would be similar to a mirror image of building #5. The invert of the drain stub wou7 ld be approx. 57.5 _4 7 -1 I&