HomeMy WebLinkAboutARCHITECT'S SUPPLEMENTAL INSTRUCTIONS - 03-00015 - BYUI - Student Housing 16 Buildings (160 units)ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
3YUE-Idaho
Student Family Hntlhj
OWNER." BYU-1daho
Rexburg, Idaho
TO CONTRACTOR: Bateman -Hall, Inc.
P.O. Box i464
Idaho Falls, Idaho 83403
ARCHIiEC"�'S SUPPL5Mr=N'TAL
INSTPUCTION NO' ASI -16
DATE'. 22 august 2003
ARCHITECT: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO". 7200-35
CONTRACT FOR; General Construction CONTRACT DATED: 19 February 2003
The Work shall he carried out in accordance with the following supplemental instructions issued in accordance with the
Contract Dccuments without change in contract Sim or Contract Time. Pricr to proceeding in accordance with these
ins#rL�tiers, indicate yoU; acceptance of these inst1wouctions for minor change, to the Work as consistent with the
Contract Documents and return a copy tothe Architect.
Description:
1. The attached drawing give's the elevations dor the fence pasty at the extreme east end of the site.
The elevations for the balance of the fence along the north side of the site will follow as soon as possible.
Attachments: .4S 1- 1 6-1
ARCHITECT: en o Hayes o Shropshire Architects, P.A.
BY:
��ArchitE)ct
ACCE ED: Bateman -Hall, Inc.
Co ntracto r Date
Lf -04 4v�-�
M
aLLI
I�
Y
q
R
ii
i
Y
q
„o-,o�
0
iii
a
i
a
I r
I
PROJECT: BYU-Idaho
Student Family Housing
OWNER: BYU-Idaho
Rexburg, Idaho
0
i0 CONTRACTOR: gateman -Hall, Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION N-0: ASI -8.
DATA: os May 2003
ARCHITECT: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECh.',"iT NO: 7200-35
CONTRACT FOR: General Construction CONTRACT SATED: 19 February 2003
The Work shall be carried out in accordance with the fallowing supplemental instructions issued in accordance with the
Contract Documents without change in contract Sum or Contract Time. Prior to proceeding in accordance with these
instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
Description:
Resolution of Questions that have arisen from the Contractor concerning the framing of the
Buildings.
Attachments'.
ASI -8 Resolutions
Sketch ASI -8-1 Typical Hold. -downs
ARCH ITECT:� _`4
sen
K:Wnjes
7
Shropshire
i-chitect
chitects PA ACCE ED: Bat m n -H 11 Inc.
BY:
Contractor pale
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
rMQdE0T2T DYUIdano
Student Family Housing
OWNER: BYU-Idaho
Rexburg, Idaho
i0 CONTRACTOR: C.
Bat M_
P.O. Box 1464
Idaho 83403
ARCHITSCT'S SUPPLEMENTAL
INSTRUCTION NO-. ASI -6
DATE: 25 Aproll 9801
ARCHITECT.: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO'.' 7200-35
CONTRACT FOR: General Construction CONTRACT DATED: 19 February 2003
The Work shall be carded out in accordance with the following suppMai instruct'ons issued in accordance with the
Contract Documents without change in contract Sum or Contract Time. Prior to proceeding 'in accordance with these
instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
Description.2
Shop drawing reviews have prompted the following revision to dwg,I'
.1. Refer tl�1111111111111111wg.dA2.1,
upper right hand corner ,Footing & Foundation Plan for buildings #6, #9 & #13.
The T.O.P. (top of pier) elevation at the left hand side of these three buildings should be 96'.411
not 96'-0". The two left hand piers of these buildings should be a4 96'-4".
This change will also affect Submittal #05-2, dwg. AB1 at the upper right hand corner.
Attachments:
ARCHITECT:
BY'
es zq==-- Shropshire Ar hit t , P.A.
itect
0
ACCEPTED: Bateman -Hall, Inc.
BY:
Contractor Date
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
PROJECTO BYU-Idaho
Student Family Housing
OWNER: BYU-Idaho
Rexburg, Idaho
T0 CONTRACTOR: Bateman -H 11, Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO: ASI -7
DATE: 28 April 2003
ARCHITECT: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITE'CT'S PROJECT NO: 72-00-35
CONTRACT FOR. General Construction CONTRACT DATED.- is February 2003
The Work sell be carried out in accordance with the following supplemental instructions issued in accordance with the
Contract Documents without change in cantract Sum or Contract Time, Prior to proceeding in accordance with these
instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
Description:
Shop drawing reviews have prompted the following revision to dwg, A2.2. Refer to dwg., R2.2,
lower right hand corner ,Footing & Foundation Plan for building #16.
The T.O.P, {top of pier} elevation at the right hand side of this building should be 103 2.,811
nQt
100I-0". The top of the two right hand piers at this building will be 103'-6". Thetonoffooting
at these piers should be at elevation 99' -8".
This change will also affect Submittal #05-2, dwg, AB2 at the center right hand area of the
dwg.
Attachments:
ARCHITECT:
;; Hayes a Shro
r h t+ t
ire Architects, P.A. ACCEPTED: Bateman -Hall, Inc.
nt rt r
Date
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
PROJECT: E3YU-Idaho
Student Family Housing
OWNER: BYU-1daho
Rexburg, Idaho
TO CONTRACTOR: Bateman -Hall, Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO.' ASI - 5
DATE: 22 April 2003
ARCHITECT,: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO: 7200-35
CONTRACT AOR: General Construction CONE'21'RACT DATED,, 19 February 2003
The Work shall be carried out in accordance with the following supplemental �nstructions issued in accordance with the
Contract Documents without change in contract Sum or Contract Time. Prior to preceeding in accordance with these
instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
ri pti o .
The attached drawing answers a question raised earlier by the Contractor and pertains to
building #5.
Atlachments-
ASI
-5 DRAWING 1 OF 1 :
FOOTING & FOUNDATION PLAN AND FRONT ELEVATION
ACCEPTED: Sletten Construction
BY:
Contractor Date
ARCHITECT'S
SUPPLEMENTAL
PU0T16N1!-..Lj
PROJECT: BYU-Idaho
Student Family Housing
OWNER' BYU-Idaho
R exbu rgT Idaho
TO CONTRACTOR: Bateman -Hall 3 mc.
P.O. Box 1464
Idaho Falls, Idaho 83403
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO'.' ASI - 4
DATA: 22 April 2003
ARCHITECT: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 8320-1
ARCHITECT'S PROJECT NO: 7200-35
CONTRACT FOR: General Construction CONTRACT DATED: 19 February Zoos
The Work shatl be carried out in accordance with the following supplemental instr
C ions issued in accordance with the
Contract Documents without change in contract Sim or Contract Time. Prior to proceeding in accordance with these
instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
Description:
The attached information was requested by the Contractor. This information pertains to
building #S and the revision made by Addendum #1 during the bidding period'.
Attact"errits
a
ASI - 4 DRAWING 1 OF 2: PARTIAL SITE PLAN AND FLOOR PLANS
ASI - 4 DRAWING 2 OF 2.- FOOTING & FOUNDATION PLAN AND FRONT ELEVATION
Shropshire Architects= P.A. ACCEPTED-. Sletten Consiruction
BY -0
chit
Hutt
Date
PROJECT: BYU-idaho
Student Family Housing
OWNER: BYU-Idaho
Rexburg, Idaho
TO CONTRACTOR:,
Bateman -Hall, Inc.
P.O. Box 1468
Idaho Falls, Idaho 83403
CONTRACT FOR: General Construction
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO: ASI -3
6AYr=: 15 April 2003
ARCHITECT: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO'. 7200-35
CONTRACT SATED: is February
The Work shall be carded out in accordance with the following supplemental instructions issued in accordance with the
Contract documentswithout change in contract hum or Contract Time_ Prior to proceeding in accordance with theseir�struetions, indicate your acceptance of these instructions dor minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.,
Description:
Shop Drawing and Submittal Reviews have prompted the following minor revisions:
1. defer to Wall Section 1 0/A6.6. The Top of Stud Wall/Truss Bearing elevation at the
Utility Rooms on the rear of the townhouse units is to be 110'-5 1/21' above the main
floor of the townhouse units. Change the 10'-9" dimension to 10'-5 112".
2. Refer to dwg. A3.2. Change the truss designations for truss types 3 a 4. Tvpe TR3 will
change to'TR4 and type TRS will change to TD3.
3. Refer to Column Detail 1 /A3.2. Revise the truss fearing Elevation to 24'-0" Above the
first floor of the center units.... ,,this would also be 20' -4" above the top of the column
foundation.
Attachments.-
A,R C H ITEC Jen n # Hayes� Shrop�i�ire Architects, P.A.
rh itt
ACCEPTED: Sfetten Cvnstructior,
BY:
Contractor
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
PHOJECTE BYU-Idaho
Student Family Housing
OWNER: BYU-1daho
Rexburg, Idaho
TO CONTRACTOR:
Bateman -Hall, Inc.
P.O. fox 1464
Idaho Falls, Idaho 83403
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO: ASI -2
DATE.,q 10 April 2003
ARCHITECT: JHS Architects, P.A.
1 25 No. Garf i eld Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO: 7200-35
CONTRACT FOR: General Construction CONTRACT DATED: 79 February Zoos
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the
Contract Documents without change in contract Sum or contract Time. Prior to proceeding in accordance with these
i n structi ons, indicate your acceptance at hese instructions dor miner chane to the Work as consistent with the
Contract Documents and return a copy to the Architect.
De sc ri ptio n '
We received word on the afternoon of March 9, 2003 that the City of Rexburg has again
placed requirements on the project after work was in place.
The 18 inch culvert at the NW corner of the site needs to be placed deew%
per. The invert at the
east end of the culvert needs to be at approximately the grade of the existing ditch at the east
end of the culvert. This may have to be adjusted down to get below the new sewer line. The
culvert should be graded ata .5'/o slope and the west end should be " raked" for about 8 ft. to
allow the water to flow out of the west end.
The costs for the removal and reinstallation of the should be included in the costs. for Proposal
Request #5.
With the culvert a4 a lower depth, thereis no need for the concrete protection cover that was
discussed in the Const. Mfg. an April 9th.
Attachments,
None
ARCHITECT' Anse Hayes* Shropshire Architects, P.A. ACCEPTED: Sletten Construction
BY:
� Contractor ! 5�i3 ire.-a.u.
to
ARCHITECT'S
SUPPLEMEN7ALINSTRUCTIONS
PROJECT: BYU-Idaho
Student Family Housing
OWNER: BYU-Idaho
Rexburg, Idaho
TO CONTRACTOR:
Bateman -Hall, Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO-. ASS -1
DATE: 10 April 2003
ARCHITECT: -HS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO', 7200-35
CONTRACT FOR: GeneralConstruction CONTRACT DATED. 19 February 2003
The Work shall be carried out in accordance with the following su�piernental instructions issued in accordance w[�[� the
Contract Documents without change in contract Sum or Contract Time. Prier to proceeding in accordance with these
instruc#ions, i-nd [cate your acceptance of th ese Fns#ructions for minor change to the Wo rk as consistent with the
Contract Documents and return a. copy to the Architect.
Description:
A question has been raised concerning the layout of the buildings and their dimensions.
As clarification:
the civil information given to the Contractor's
in each direction than the foundation plans.
surveyor shows the buildings 2 inches 1ar9V1j0%
This is due to a 1 inch overhang of the brick all
around the buildings. The civil layout received by the surveyor indicates the outside of brick
dimension. The Contractor's surveyor should " split the difference".
A ffachm, e-nts-.
ARCHITE/GrTo! Jen n s Hayes* Shropshire Architects, P.A.
BY00 6
Architec-
ACC F PS " E - Sleften Construction
BY:
Contractor
PROJECT.- BYU-ldaho ARCHITECT'S SUPPLEMENTAL
Student Family Housing
OWNER: BYU-Idaho
Rexburg, Idaho
TO CONTRACTORM- gateman -Hall, Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
INSTRUCTION NO-. ASI -10
DATE' 09 May 2003
ARCHITECT-, JHSArchitects, P.A.
125 No. Garfield Ave.
Pocatello. Idaho 83201
ARCHITECT'S PROJECT NO: 7200-35
CONTRACT FOR: General Construction CONTRACT DATED: 19 February 2003
The Work shall be parried out in accordance with the following supplemental instructionsissued ire accordance with the
Contract Documents Without change in contract Sum or Contract Tirme. Prior to preceeding in accordance with these
instructions, indicate your acceptance of these instructions for miner chane to the Work as consistent wish the
Contract Documents and return a copy to the Architect.
Description:
GFI Soffit Outlets
The attached plan shows a layout of GFI duplex outlets in the soffits of a typical building.
Attachments-,
Sketch ASI -10-1 Typical GFI Soffit
Outlet Locations
ARCHIT-
ow-
i e
BY:
'sen is Hayes* Shr�q�hire Architects, RA, ACCEPTED: Bateman -Hail, inc.
SAPP, I rhe .�
Co ntrto r Date
d
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
r
r
5�
10
i
msim 0 Pan, o. 2
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
PROJECT: BYU-1daho ARCHITECT'S SUPPLEMENTAL
gludent Family ousiI
ng
OWNER: BYU-Idaho
Rexburg, Idaho
TO CONTRACTOR:
Bateman -Hall, Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
CONTRACT FOR: General Construction
INSTRUCTION NO'. ASI -12
DATE: 27 May 2003.
ARCHITECT: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO.- 7200-35
CONTRACT DATED: is February zoos
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with tete
Contract Documents without change in, contract Sum or Contract Time. prior to proceeding in accordance with these
instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
Description:
Per some issues discussed during Observation #14, the following answers are provided.-
Issue
#1: FOUNDATION WALL REPAIR:
See attached sketch ASI -12 #1 for repair of "swaled" foundation walls.
Issue #2.-, DRAG STRUT SPLICING:
A single drag strut option is offered if material is full length. Two splicing options
are shown. See attached sketch ASI-12 #2 & #2A.
Issue #3: STAIR SKIRT/STRINGER:
Framing contractor discussed several construction options at stair skirting. the
attached sketch ASI -1 2 #3 shows agreed upon option.
Issue #4: HEADER LOCATION:
At double Drag Strut, window header shall be located at inside face of stud. See
attached sketch ASI-12 #4.
Attachments: ASI -12#1,423#2A,#3.
ARCHIT::"' - den en • Hayes e
BY:
Shropshire Architects, P.A.
ACCEPTED: Bateman -Hall, Inc.
BY:
Contractor Date
ff
JIIVSIN■ HAYES m SHROPSHIRE,
ARCHITECTS. P.A.
�cSI �2�/
I
I
E
L� M I L.`( � � S l lei C�
I �
W4Li— 5/z��fz
I
5�,�rr�� Na1�MEi1Gb of Sorl4wr
L
f
T
ff
IVA OrM j0t:1lomLe sid
r �,�s�ra
�r pd24 T6l /til �°, i
Gc�� 18?c[ 3% Awl
W
w
JIIVSE�Iim HAYES■ SHROPSfURE
ARCnITECTS, P.A.
A5I•� ��y -
�,�, u�i �v� s tea✓,
�R� y 5 i2u -T
1
�"/L7° / ruS iN
�IC�r�M r a F• f i I! I
Flo�q LAO of.0; LE; /Z /M gid c I s rs
T�
�V 77 gvmoow5r&lz Ve� AS A4 (4A ����
77�:p "ojiN/tf-0 0 5; vNi TS.
�V�'S%!O/Y ��� ���j 17i�.li� ,87E J���l���o � r
ME
w� o��� ��.� o�T ops (�� i � ��„�y
S,MPL�ST,
': �� 4%5£if% L ��
NI ILL CAfL�`(
Tfr 7wENS an! Loe 0 AOd9 Te4j'
I..r% I f i t -,o om r-- I awv 'do Aff .i. _� A p A—mob b mbmmmve —AOL A
m
OF
'V A PP,doo VW wil 100'!T v
l2 /
FRX" roc. f1a'�a 27 X003 02; 46PN P2
!za 0 L 1 cml-� E
t C6 ,,� i 6:p k) A I ).,-S
2..5 --r q 1,57 n ir- 6 )
II
N7A LL,.,
AC
A K nIt_s .
L I D '.) jjA...1LS
CIO
L bP�!'lorJ
S PLIc� 1,
11 1 r _ c _ _
�.r
TITLE:
TETON
STRUCTURAL IEN"GINEERS AT- r
y 4L
L-1 0 10 f -v
SHEET
v
Ir
4-4--
JR�S�w HAFFS ■ SHROPSFURiE
AD.LxxTCTS, P.A. f
ON
4L
1p
FA M I L -T o U SIAJ
P
%
AW
�
cx
'r-7 A 4�V
JENSENim HAYES a SIMOPS=
ARCHITECTS., P.A.
�_~-------_-__�__AST4wM
-
-4
___-
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
PROJECT: BYU-Idaho ARCHITECT'S SUPPLEMENTAL,
Student Family Housing INSTRUCTION NO: ASI -11
OWNER: BYU-1daho
Rexburg, Idaho
Bateman -Hall', Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
DATE: 27 May 2003
ARCHITECT: JHS Architects, P.A.
126 No. Garfield Ave.
Pocatello, Idaho 8.3201
ARCHITECT'S PROJECT NO-. X200-35
CONTRACT FOR. General Construction CONTRACT DATED: 19 February Zoos
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the
Contract Documents without change in contract Sum or Contract Time. Prier to proceeding in accordance with these
instructions, indicate your acceptance of these instructions dor miner change to the Workas consistent with the
Contract Documents and return a copy to the Architect.
Descri"ption.:
As documentation of the conversations that have taken place on site, the following is submitted..
1. Framer proposed to use 1 3/4" x 11 7/0" LVL headers a4 townhouse stair in lieu of the
B5's shown. This change is approved.
2. Transverse header nearest the townhouse entrance door shall extend to nearest
continuous floor joist. At the floor joist, the header shall be supported with a HU1 1 min.
joist hanger or better. Floor joist shall be reinforced with full thick sheer blocking per
joist manufacturer's recommendations. floor joist shall be a J1 or J3 in lieu of adjacent
J2's and may be procured by swapping a J2 with a J 1 at the head of the stair.
3. Transverse header a4 top of stair shall bear on the wall below. Header or beam from
kitchen wall shall bear on wall below.
4. Longitudinal headers shown without size identifier may be J2 joists at top of wall or AVL
at contractors' option.
5. In order for stairway wall to support the two transverse headers, the header over the
pzntry closet doors reeds to be a minimum of (2) 2 x 6's.
Attachments:
ARCHITECT sen s Hayes c
BY-
ArchftE
,
Shropshire ,architects, P.A.
ACCEPTED: Bateman -Hall, Inc.
PROJECT: BYU-1daho
�Student
Family HousingA,'
OWNER: BYU-Idaho
Rexburg, Idaho
Bateman -Hall, Inc.
P.O. fox 1464
Idaho Falls, Idaho 83403
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO: ASI -13
DATE: 23 June 2003
ARCHITECT. JHS- Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCH"ITECT'S PROJECT NO: 7200-35
CONTRACT FOR: General Construction CONTRACT DATED: is February Zoos
The Work shall be carred out in accordance with the following supplemental instructions issued in accordance with the
Contract Documents without change in contract Sum or Contract Time. Prior to proceeding in accordance with these
instructions, indicate your acceptance of these instructions for minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
Description-
After
reviewing the request from the framer for a different way to accomplish the blocking at the
ends of the trusses, we submit the attached sketch detail for your use. This detail would
replace detafl 1/A4.1 on the construction documents.
Th -is detail could be used at every third truss space.
on the construction documents shall be used.
Attachments: ASI -i3 #1
ARCHITECT:
BY:
Hayes s Shropshire Architects, P.A.
If this detail is not used, then detail 1/A4.1
ACCEPTED: Bateman -Hall, Inc.
BY:
trtr
qw
fie
i t + t v a t
* I
i ! —
JESNA KkYESRs-ll-MOPSFdRE
ARCH11
W141
F
ARCHITECT'S I
Q�Appv aF_m t=,N
C:pL TA 9 1
LN NS %go -9 fl� log
A w
PROJEC I :
BVU-1daho ARCHITECTS SUPPLFMENTAL
Etude. + i l ing
OWNER: BYU-I�o
Rexburg, Idaho
TO C9NTRACTOR'gateman-Half, Inc.
P.O. Box 1464
Idaho Falls, Idaho 83403
INSTRUCTION NO: A5H5
DATE: 22 August 2003
ARCHITECT- JHS Architects, P.A.
125 No. Gartield Ave -
Pocatello, Idaho 83201
ARCHITECi'S PROJE� T f�i�: 7200-35
CONTRACT FOR Genera! Construction CONTRACT DATED. 19 February 2003
The Work sh-call be carried out ire accordance with the foilowing su lemental Instructions issued ire accordance with the.
Contract Documents without change ire contract Sum or Contract Time. Prior to proceeding in accordance with these
OL
instructions, indicate your acceptance of these'Instructions #or minor chan e to the Work as consistent W1
Contract Documents and return a copy to the Architect.
aescription:
I The attached details will clarify the construction of the corners of the gable end roofs where they meet the
"f't^ and the framing/detailing of the entry canopy soffits.
soT I -..) I
Attachments.- AtS(-15-1 and ASI -1 5-2.
ARCHITECT:
M
ensen -66
ayes o
Shropshire Arphitects, P.A.
ACCEP-TED: Bateman-Hali, Inc.
Contractor Date
In
0
L
F EFI ISH M7L.
EDGE FLASHING
A5FHALT 5H INGLES
RAF OVER 2X5FAS A .
z
7.
� w
OL < IL
LLJ- .70 ...
CL fl)
LL
LU LU
-A LL z < Z,
LL LL
�V x D� Lu
ci iL LL rpt L 7
It-
ARCHITECT'S
SUPPLEMENTAL INSTRUCTIONS
PROJECT: BYU-Idaho
Student Family Housing—
OWNER: NYU -Idaho
Rexburg, Idaho
TO CONTRACTOR,-
Bateman -Hall, Inc.
P.O. Box 1464
Idaho Falls, Idaho X3403
V.q C,4oiAmnkos,
ARCHITECT'S
SUPPLEMENTAL
INSTRUCTION NO: ASI -17
DATA: 27 August 2003
ARCHITECT: JHS Architects, P.A.
125 No. Garfield Ave.
Pocatello, Idaho 83201
ARCHITECT'S PROJECT NO', X200-35
CONTRACT FOR: General Construction CONTRACT DATED: 19 February 2003
The Work shall be carried out in accordance with the followin. supplemen#ains- cions issued in
accordance with the
Contract Documents without change in contract Sum or Contract Time. Prior to proceeding in accordance with these
instructions, indicate your acceptance of these instructions dor minor change to the Work as consistent with the
Contract Documents and return a copy to the Architect.
Description:
1'. The attached drawing provides elevations for the brick ledg'es at the brick posts and wrought iron fence along
the north side of the site. Drawing ASI -1 7- 1' incorporates dwg. AS! -1 6-1 and corrects the elevation at the far
eastern brick posh. The fence follows a straight slope along the north side of the site and is at a higher
elevation than shown on the construction documents. This reduces the amount of excavatio, etc. at the
fence location. The fence has also been shortened by two posts and,two wrought iron panels. This is also a
credit item to the project.
2. The concrete mow stip between the brick posts will be set with the top at 6" below the brick ledge on the
posts.
3. The sidewalk elevation will follow and be adjacent to the mow stip. (6" below the brick ledge at the posts)
4. The concrete foundations for the posts may rest on the existing Iowa rock. The lava rock must be sound and
solid, if the kava rock Js move the top of the post fooling, the concrete pier can utilize the lana pock in lieu of a
footing. The vertical bars would then be drilled and epoxied into the lava rick. The surface of the rock must be
cleaned prior to placing. the concrete just as where the building foundations rested directly on the rock.
Attachments' ASI -17-1
ARCHITEC
BY:
Hayes Shropshire Architects,P.A.
Architect
0
ACCEPTED: Bateman -Hall, Inc,
BY:
0
T Contractor � Date