Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00016 - Gringo's Restaurant - New BuildingJP CITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building official, upon notification from the permit holder or his agen#, shall make or cause to be made any necessary inspections and shah either approve that portion of the construction as completed or shall 'notify the Dermit holder or his went wherein the game fails to comply with this rode. I . LAYOUT: Lot corners staked, staking in place for building, prior to excavation - 2. FOOTING: Commonly made after poles or piers are sed or trenches or basement areas are excavated_ Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on jab site or tied in place. 3. FOUNDATI�N INSPECTION: I1 5. lei 7. The foundation inSDection shall included excavations for thickened slabs intended for the support of hearing wars, partitions, structural su�p�orts, or equipment and special requirements for ,mood foundations. Al! forms and reinforcing steel, etc., shah be in place. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set,, and Drior to frcqminn in-cnar-fion TRUSS INSPECTION: Inspections of trusses. FRAME INSPECTION: Commonly made after the roof, all' framing, bracing are in place and after the plumbing, rough inspections are approved. (Electrical State of Idaho Electrical Bureau) LATH ANDILR WALLBOARD INSPECTION firestopping, draftstopping and Mechanical and -electrical inspection performed through Commo'nly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. FINAL PLJJMBJNG AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS : After forms are set, prior to placing concrete. 10. FINAL INSPECTION.- Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced by the building department. ]INSPECTION CARD The permit holder or his agent shall post the inspection rece jab site in an accessible and conspicuous place to allow the building offic+ai tom equired entries. The record shall be maintained by the permit holder until the final inspection h2Sbeen mace end 2pproved. I have read the above and w111 comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: X24 -3i67 Bullding: 35g-�p�p ex 326 or 313 Plumbing: 359-3020 ex 326 or 313 or 359-3x34 Signature: