Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00012 - 609 S 5th W - Apartment RemodelCITY QF REXBURG BUILDING INSPECTION SEQUENCE hype of Insoections-For n-�construction from time to time the building official, upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall ether approve that portion of the construction as comaleted or shall notify the permit holder or his agent wherein the same faits to comply with this code. 1. LAYOUT; Loi corners staked, staking in piace dor building, prier to excavation: 2. FOOTING: Commonly mads after poles or piers are set or trenches or basement ares are excavated. Forms and horizontal reinforcing lied in pace, vertical reinforcing cud and on ,job site or tied in place.. 3. FOIJNDATION INSPECTION: The foundation insaection shall included excavations for thickened nabs intended for the supoart of bearing walls, partitions,, structural supports, or equipment and saecial requirements for woad foundations. All forms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL ASID ELECTRICAL: Routh inspection-, Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5, TRUSS INSPECTION: Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, bracing are in place and after the plumbing, rough inspections are approved. (Electrical State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: firestoppilng, draftstopping and mechanical and electrical -isp+ectian performed through commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are gaped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: issued when, on final inspection, building 'is ready to occupy. 12. ETHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this cede and other Laws enforced by the building department. INSPECTION CARD The permit holder or his agent shall past the inspection record on the job site in an accessible and conspicuous place to allow the building official to made the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. have read the move and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made.. Electrical: 624-3767 Building: 359-3D20 ex 326 or 313 Plumbing: 359-3020 ex 326 or 313 or 359-��34 Signature: B Ui'R I d in n Permit Fees Cost of Constructlon:E7 35,000 14" Rate Chart: Plumbinq Permit Begin 0 501 2,001 25,001 50,001 100,001 500,001 110001001 UU-10 Ung IMIC NU M rf � [K7�39wol-0� End Base 500 2,000 251000 Hate ChartM Res"dent-al & Non Commercial Number of Fixtures 14.Q4 Sprinkler Fee. 18.00 Rate Per Fixture 8.00 Base Fee 34.O0 Rate Chart: Commercial Cost of Plumbing: Rate Chart: ZE ❑1 A n U 20,000 1 00J00 200,000 Water & Sewer Permit 23.50 23.50 69.25 391.75 643.75 993.75 3233.75 5608.75 Tota I B Number Plus Per 0.00 100 3.05 100 14.00 1000 10.10 1000 7.00 1000 5.60 1600 4,75 1000 3.65 1000 uildirtg Permit Fee: r Plan Check Fee: r$ 0.00 0.00 0.00 492.74 0.00 0.00 0.00 0.00 492.74 Fixture Fee,-. 112.00 Q Sprinkler Fee: 0.00 Base Fee.- 3p.�p iotas Plumbin Permit Fee: 1$pp End I base Plus Per ;:p�q 20,000 100,000 200,000 99,999,999 30.00 3.0% 1 0.00 630.00 2.0°k 1 0.00 2230.00 1.0% 1 0.00 3230.00 0.5% 1 0.00 Total Plumbing Permit Fee: $ 0.00 **Total Meter Parts Meter Box $70.00 Ring & did $32.00 Curb Stop $27.00 Setter $53.00 0.75 $125.00 $182.00 1 1.00 $195.00 $182.00 0 1.50 $337.71 p 2.00 $1,368.00 p 3.00 $17868.00 p 4.00 $2,618.50 p Hookup Fees Water Rate Digging Permit Fees Minimum & flli Hames $1,100.00 Minimum & All Homes Apt (# of Students) $270.00 Apts (# of Students) Apts (Family Hauling) $425,p4 Apts (Family Housings Water Frond Footage $101.00 Sewer Front Footage Total Water &Sewer Permit Fees Total Water Meter and Parts: Sewer Rate Studen r�its Lei $575.00 p 0 0 $437.50 p 0 3 $235.00 PA. D 0j $10.00 � 0- $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 _j $0.00 $0.00 $0.00 $0.00 $1,275.00 $705.00 $0.00 $0.00 ••^,� y `t CUU3 $1,980.00 Total All Fees: $ 2664_o� CITY GF R �X?�UFiG 01-322.11 01-322.14 01-322.14 25-346.20 34-34G.30 35-347.3Q 34-34fi.30 35-347.3t} 34-346.30 35-347.3Q 34-346.42 35-347.42 5550 Solftude Lane Idaho 'Fees, Idaho 83406 Associates Pone: (20-8) 589-9967 Fax: (20$) 523-7E40 BUILDING FOR: IDAHO L al Project. Date Reprised 7- 12110/02 'cc's 75 N f