HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00012 - 609 S 5th W - Apartment RemodelCITY QF REXBURG
BUILDING INSPECTION SEQUENCE
hype of Insoections-For n-�construction from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall ether approve that portion of the construction as comaleted or shall notify
the permit holder or his agent wherein the same faits to comply with this code.
1. LAYOUT; Loi corners staked, staking in piace dor building, prier to excavation:
2. FOOTING: Commonly mads after poles or piers are set or trenches or basement
ares are excavated. Forms and horizontal reinforcing lied in pace,
vertical reinforcing cud and on ,job site or tied in place..
3. FOIJNDATION INSPECTION:
The foundation insaection shall included excavations for thickened nabs
intended for the supoart of bearing walls, partitions,, structural supports, or
equipment and saecial requirements for woad foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL ASID ELECTRICAL:
Routh inspection-, Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5, TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing,
bracing are in place and after the plumbing,
rough inspections are approved. (Electrical
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
firestoppilng, draftstopping and
mechanical and electrical
-isp+ectian performed through
commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
gaped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
issued when, on final inspection, building 'is ready to occupy.
12. ETHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
cede and other Laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall past the inspection record on the job site in an accessible
and conspicuous place to allow the building official to made the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approved.
have read the move and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made..
Electrical: 624-3767 Building: 359-3D20 ex 326 or 313
Plumbing: 359-3020 ex 326 or 313 or 359-��34
Signature:
B Ui'R I d in n
Permit Fees
Cost of Constructlon:E7 35,000
14"
Rate Chart:
Plumbinq Permit
Begin
0
501
2,001
25,001
50,001
100,001
500,001
110001001
UU-10
Ung IMIC NU
M rf � [K7�39wol-0�
End Base
500
2,000
251000
Hate ChartM Res"dent-al & Non Commercial
Number of Fixtures 14.Q4
Sprinkler Fee. 18.00
Rate Per Fixture 8.00
Base Fee 34.O0
Rate Chart: Commercial
Cost of Plumbing:
Rate Chart:
ZE
❑1
A
n
U
20,000
1 00J00
200,000
Water & Sewer Permit
23.50
23.50
69.25
391.75
643.75
993.75
3233.75
5608.75
Tota I B
Number
Plus
Per
0.00
100
3.05
100
14.00
1000
10.10
1000
7.00
1000
5.60
1600
4,75
1000
3.65
1000
uildirtg Permit
Fee:
r
Plan Check
Fee:
r$
0.00
0.00
0.00
492.74
0.00
0.00
0.00
0.00
492.74
Fixture Fee,-. 112.00
Q Sprinkler Fee: 0.00
Base Fee.- 3p.�p
iotas Plumbin Permit Fee: 1$pp
End I base Plus Per ;:p�q
20,000
100,000
200,000
99,999,999
30.00 3.0% 1 0.00
630.00 2.0°k 1 0.00
2230.00 1.0% 1 0.00
3230.00 0.5% 1 0.00
Total Plumbing Permit Fee: $ 0.00
**Total Meter Parts
Meter Box $70.00
Ring & did $32.00
Curb Stop $27.00
Setter $53.00
0.75
$125.00
$182.00 1
1.00
$195.00
$182.00 0
1.50
$337.71
p
2.00
$1,368.00
p
3.00
$17868.00
p
4.00
$2,618.50
p
Hookup Fees
Water Rate
Digging Permit Fees
Minimum & flli Hames
$1,100.00
Minimum & All Homes
Apt (# of Students)
$270.00
Apts (# of Students)
Apts (Family Hauling)
$425,p4
Apts (Family Housings
Water Frond Footage
$101.00
Sewer Front Footage
Total
Water &Sewer Permit
Fees
Total Water Meter and Parts:
Sewer Rate Studen r�its
Lei
$575.00 p
0 0
$437.50 p 0
3
$235.00
PA. D 0j
$10.00 � 0-
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
_j
$0.00
$0.00
$0.00
$0.00
$1,275.00
$705.00
$0.00
$0.00
••^,� y `t CUU3 $1,980.00
Total All Fees: $ 2664_o�
CITY GF R �X?�UFiG
01-322.11
01-322.14
01-322.14
25-346.20
34-34G.30
35-347.3Q
34-34fi.30
35-347.3t}
34-346.30
35-347.3Q
34-346.42
35-347.42
5550 Solftude Lane
Idaho 'Fees, Idaho
83406
Associates
Pone: (20-8) 589-9967
Fax: (20$) 523-7E40
BUILDING FOR:
IDAHO
L al
Project.
Date
Reprised
7-
12110/02
'cc's
75
N
f