Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00011 - East Idaho Credit Union - RemodelCITY OF R'EXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, tram time to time the buildin official u on notification from the permit holder or hi's'went, shall make or pause to � � �inspect,gns anc �hall either apr�rove that portion of the construction amade any necessary the permit holder or his agent wherein the same tails to camply wit# this � leted or shall notify 1. e. LAYOUT. Lot Corners staked, staking in place for building, prim to excavation: 2. FOOTING: Commor�ry� made of#er pales aers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing #led in place, vertical reinforcing cut and on jab site or fled in place. 3. FOUNDATIfON INSPECTION: foundatian insoec#ion shall included excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or eauipment and special requirements for woad foundations. All forms and reinforcing steel, etc., shalt be in place. 4. PLUMB1�iC.�, fV{ECHANICAL AND ELECTRICAL: R0, g inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. S. TRUSS INSPECTION: Inspections of trusses, 5. FRAME INS-3PF-CTION: Commonly made after the roof, all framing, firestooping,� draftstopping and bracing are in place and after the plumbing, mechanical and electrical sough inspections are approved. (Electrical inspection perfor d through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners. are tapeta and finished. 8. FINAL PLUMBING ASVD HEATING INSP C ION- All systems in piace, fixtures set, ready tor occupancy 9. SIDEWALK INSPECTIONS: After farms are set, prior to placing concrete. 10. FINAL INSP�CTION: Commonly made after the building is completed and ready for occupancy. 11. QPERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other insgectians to ascertain compliance with this code and other laws enforced by the building department. INSPECTION CAPD The permit holder or his agent shall post the inspection record on the jab site in an accessible and conspicuous place to allow the building Official to ma ke the required entries. The record shal�j�t��n fined by the permit holder until the final inspecti l�k�an has been made and a roped. I have read the above and will comply in my requests for inspe�ctions b PP NOTICE prior for inspections to be made. Y 9�V�n9 �� HQUR Electrical: X24-3767 �uifdin4: 35g -3Q24 ex 326 or 313 Plumbing: 35g -3p20 ex 326 or 3 3 or 359-3034 Signature: D