Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00008 - Targhee Medical - RemodelCITY OF REXBURG BUILDING INSPECTION SEQUENCE Tyae o� Insoections: For on-site construction, from dime to dime the building offec�a�l, upon notification from the permit holder or his agent, shah make or pause to be made any necessary inspections and shalt either approve that portion of the construction as completed or Shill notify I 1 1111 [UIJ 1. LAYOUTT Lot earners staked, staking in place for building, prior to excavation: 2. FOOTING: Commonly made after gates or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on jai site or tied in place- JNDATION 3. ��IINSPECTION: The foundation inspection shall included excavations dor thickened slabs intended for the support of bearing walls, Partitions, structural supports, or equipment and special reauirements for woad foundations. All farms and reinforcing steel, etc., shall be in gface. 4. Pl-UMBING., MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment} before fixtures are set, and prior to framing insQection. 5. TRUSS INSPECTION: Inspections of trusses. E. FRAME �SPECTION: P1 4L 7. �u, 1 11 1,u„ty mduu di tur me raor, ail rraming, tirestopping, draftstopping and bracing are in place and after the umbing, mechanicsl and electrical sough inspections are approved. ('Electrical inspection performed through State of Idaho Electrical Bureau) LATS! AND/OR WALLBOARD INSPECTION Commonly made after all lathing and/or ►nrafiboard in#erior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are sed, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building 11. OCCUPANCY PERMIT: is completed and ready for occupancy. Issued when, on finall inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced by the building department, INSPECTION BARD The permit holder or his agent shall post the inS.Dection record on the job site in an accessible and conspicuous place to allow the bLAding official to make the required entr;es. The record shall be maintained by the permit holder until the final insnection his been made and approved. I have read the above and will Damply in my requests for'inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: X24-3767 Building: 359-3020 ex 325 or 313 Plumbing: 359-3Q20 ex �326 or 313 or 359-3034 Signature'. Date: �1L/