HomeMy WebLinkAboutRECEIPT - 03-00003 - 860 S 5th W - New 4-Plex Units 24-27I
_1
U BE CONSTRUCTION TYPES
Residential -Wood Frame
Residenbal-Masonry
113asement-Serni Finished
4 Basement -Unfinished
5 Apartments -Wood Frame
6 Apartments -Masonry
7 Private Garage -Wood Frame
8 Private Garage -Masonry
9 Commercial
10 Commerciaf Parking
A Kanstruction Cast Factor
Factor = A (Residential, Commercial)
Factor = B (Mini Warehouse)
Factor = C (Shell only building)
Price Quantity C?escripition
Two Inch Meter
$22.16 2 CF39-77 Brt Mtr Flange
$0,i5 4 18X2-114 Mfr Mange Bolt
$E1.25 4 518 Meter Mange Nut
$0'65 2 2x'I18 Gasket
Three Inch Meter
$14.25 2 Std C1 Comp Finn
ge F/Steel
$4.00 2 Zinc Pf td Hex .3 olt & Nut Kit
$1.52 2 3x1/8 Fig Ring RR
Gasket
$14.50
$63.84
$72.401
$24.30
$74.70
$36
70
t
Price
$44.32
$3.00
$1,0d
$x.30
X
A
Building Kermit Valuation Fees
City of Rexburg (208)359-3020
12 North Center Street
Rexburg, Idaho $3440
Owner: Futures of Idaho
Building Naas: Residential Four Ilex Unb -7
Address: 860 Som 5th west
Date1117/2003
u�
t-fermii jNumiDer
MEMO
Value of Construction: $211 A2 Const. Type A,
Finished Sq Footage 33320 Sq Ft Cosi
Unfinished Sq Footage
Garage Square Footage
17 Sq Ft Cost =
Construction Value Factor % Total Square Foot Cost
Begin End Base
Rate Chart-, 01 500 23.50
501 2000 23.50
2$001 25) 0006,9-25
251001 507000 391.75
50 jr1 1005000 643.75
1 0 X1 500,000 993.7
500,001 1 3000100 3233.75
110003001 , 999, 999 5608.75
Mechanical Valuati
Plumbing Permit
Rate Chart: Residential & Nora Commercial
Number of Fixtures 28
Sprinkler Fee: $18,00
Rate Per Fixture $8.Q0
Base Fee $3p.00
Rate Chart: Commercial
Cost of Plumbing:
Rate Chart:
Water & Sewer Permit
Water Line Size
1.
**Total Meter Parts
Meter Box $70,00
Ring & Lid $32.00
Curb Stop $27.00
Setter
_'$0
Begin
0
20,00
100,001
01
200,001
Inches
0.75
1.0
.
00
3.00
4.00
Hookup. ees Water Rate
I ing PermR Fees
,minimurn & AM Homes $11100,00
Minimum & All Horner
Apt f Students) $270.00
.APts (# of Students)
t : (Family Housing) $4.x5.00
Apts (FamilyHousing)
Water Front Footage $10.00
Sewer Front Footage
Total Water & Sewer Permit Fees
End
20x0-00
1 00a000
200,000
99,9'99 5999
Meter
$125.00
$195.00
$1,327.79
$17868.00
$2,618.5 0
Sewer Rate
$575.00
$437.5b
$235.00
$10.00
Number
K-O�--b i__61 Z11
Final
or
$194,389.32
Apartments
$0.00
Cmer l
$16 P 1 2.80'
Parking
$211 X302.1
1
Plus
Per
0.00
100
3.05
100
14.00
1 000
10,10
1000
7.00
1000
5.60
1 000
4.75
1000
3.65
1000
Total Building Permit Fee:
Plan Check Fee:
Fixture Fee:
1Spdnkler Fee
Base 'Fee
Total Plumbing Permit Fee}
Base
.0
630.00
2230.00
3230.00
Parts"
$182.00.
$182.00
$49.62
$39.54
Plus
Per
.%
1
2.0%
1.0%
.%
1
Total Plumbing Permit Fee:
Number of
Bldgs
Tots I Water M titer a rid Pa rts:
Students
0
JAN 1^• 2003
PAID CASH $
CHECK$
Units
All Fees:
Construction Type
Residential
Basement
Apartments,
Garage
Commercial
$0.00
$0.00
$0.001
Fees
0.00
0200
0.00
0.00. 0
0.00
1,617.04
i
00
0.00
$13617.04
$161.70
224,00
18,00
30.00
Fees
0,00
r
00
0,00
� 0
Gast Sq Ft
01-322.11
1-1322.17
01-322.14
$0.00 01-322.1
$0.00
$37i_00
$5,067.74
-346,20
4-346.30
-347.30
4-346.3
35-347.30
34-346.30
-347.30
34-346,42
-347.4