Loading...
HomeMy WebLinkAboutRECEIPT - 03-00003 - 860 S 5th W - New 4-Plex Units 24-27I _1 U BE CONSTRUCTION TYPES Residential -Wood Frame Residenbal-Masonry 113asement-Serni Finished 4 Basement -Unfinished 5 Apartments -Wood Frame 6 Apartments -Masonry 7 Private Garage -Wood Frame 8 Private Garage -Masonry 9 Commercial 10 Commerciaf Parking A Kanstruction Cast Factor Factor = A (Residential, Commercial) Factor = B (Mini Warehouse) Factor = C (Shell only building) Price Quantity C?escripition Two Inch Meter $22.16 2 CF39-77 Brt Mtr Flange $0,i5 4 18X2-114 Mfr Mange Bolt $E1.25 4 518 Meter Mange Nut $0'65 2 2x'I18 Gasket Three Inch Meter $14.25 2 Std C1 Comp Finn ge F/Steel $4.00 2 Zinc Pf td Hex .3 olt & Nut Kit $1.52 2 3x1/8 Fig Ring RR Gasket $14.50 $63.84 $72.401 $24.30 $74.70 $36 70 t Price $44.32 $3.00 $1,0d $x.30 X A Building Kermit Valuation Fees City of Rexburg (208)359-3020 12 North Center Street Rexburg, Idaho $3440 Owner: Futures of Idaho Building Naas: Residential Four Ilex Unb -7 Address: 860 Som 5th west Date1117/2003 u� t-fermii jNumiDer MEMO Value of Construction: $211 A2 Const. Type A, Finished Sq Footage 33320 Sq Ft Cosi Unfinished Sq Footage Garage Square Footage 17 Sq Ft Cost = Construction Value Factor % Total Square Foot Cost Begin End Base Rate Chart-, 01 500 23.50 501 2000 23.50 2$001 25) 0006,9-25 251001 507000 391.75 50 jr1 1005000 643.75 1 0 X1 500,000 993.7 500,001 1 3000100 3233.75 110003001 , 999, 999 5608.75 Mechanical Valuati Plumbing Permit Rate Chart: Residential & Nora Commercial Number of Fixtures 28 Sprinkler Fee: $18,00 Rate Per Fixture $8.Q0 Base Fee $3p.00 Rate Chart: Commercial Cost of Plumbing: Rate Chart: Water & Sewer Permit Water Line Size 1. **Total Meter Parts Meter Box $70,00 Ring & Lid $32.00 Curb Stop $27.00 Setter _'$0 Begin 0 20,00 100,001 01 200,001 Inches 0.75 1.0 . 00 3.00 4.00 Hookup. ees Water Rate I ing PermR Fees ,minimurn & AM Homes $11100,00 Minimum & All Horner Apt f Students) $270.00 .APts (# of Students) t : (Family Housing) $4.x5.00 Apts (FamilyHousing) Water Front Footage $10.00 Sewer Front Footage Total Water & Sewer Permit Fees End 20x0-00 1 00a000 200,000 99,9'99 5999 Meter $125.00 $195.00 $1,327.79 $17868.00 $2,618.5 0 Sewer Rate $575.00 $437.5b $235.00 $10.00 Number K-O�--b i__61 Z11 Final or $194,389.32 Apartments $0.00 Cmer l $16 P 1 2.80' Parking $211 X302.1 1 Plus Per 0.00 100 3.05 100 14.00 1 000 10,10 1000 7.00 1000 5.60 1 000 4.75 1000 3.65 1000 Total Building Permit Fee: Plan Check Fee: Fixture Fee: 1Spdnkler Fee Base 'Fee Total Plumbing Permit Fee} Base .0 630.00 2230.00 3230.00 Parts" $182.00. $182.00 $49.62 $39.54 Plus Per .% 1 2.0% 1.0% .% 1 Total Plumbing Permit Fee: Number of Bldgs Tots I Water M titer a rid Pa rts: Students 0 JAN 1^• 2003 PAID CASH $ CHECK$ Units All Fees: Construction Type Residential Basement Apartments, Garage Commercial $0.00 $0.00 $0.001 Fees 0.00 0200 0.00 0.00. 0 0.00 1,617.04 i 00 0.00 $13617.04 $161.70 224,00 18,00 30.00 Fees 0,00 r 00 0,00 � 0 Gast Sq Ft 01-322.11 1-1322.17 01-322.14 $0.00 01-322.1 $0.00 $37i_00 $5,067.74 -346,20 4-346.30 -347.30 4-346.3 35-347.30 34-346.30 -347.30 34-346,42 -347.4