Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 03-00003 - 860 S 5th W - New 4-Plex Units 24-27CITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For cin -site construction, from time to time the building official, upon notification from the permit holder or his ent, shall make or cause to be made any necessary inspections and shall either approve that D'-o'rtion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to corr-�pPy with this rode. 1. LAYOUT: Lot corners staked, staking in piaci for building, ,prior to excavation: 2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizon-t2l reinforcing tied in place, vertical reinforcing cut and on dab site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspeC.3tion shall included excavations for thickened slabs intended for the suQport of bearing walls, partitions, structural supports, or equipment and special requirements for woad foundations. All farms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICALIP Rough inspection: Commonly made prior to covering or concealment, before fixtures are sed, and prior to framing inspection. 5. TRUSS INSPECTION: inspections of trusses. 6. FRAME INSPECTION-. Commonly made after the rood, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical bureau) 7. LATH AND/OR WALLBOARD INSPECTfON: Commonly mads after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made alter the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER IKSPJECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shall past the inspection record on the job site in an accessible and conspicuous place to allow the bLAding officiol to make the required entries. The record shall be maintained by the permit hollder until the final inspection has been made and approved. have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767 Building: X59-3020 ex 326 or 3 11 3 Plumbing: 359-3020 ex 325 or 313 or 359-3Q34 Signature: a e: