March24,, 200-1
Willowbrook Partners
Kirby Forbush
3800 W. 1000 N.
Rexburg, Idaho
834 4 0
Re: Letter of Understandn19,
49/ J'ILV X M1/°�
0
STATE OF l PAHO
P.O. Bax 280
12 North Center Street
Rexburg, Idaho 83440
Phane (208) 359-3D20
Fax (20$) 359-3022
e-mail rexburg@srv.net
v, rt- Z, 630 L -e -
J.
��t330
The city of Rexburg is in the process of construction water ani ,�Nrastewateir lines �.n. the .area of your
proposed development. As discussed with you., the lines will need to crass thio your land and an
easement will be required. �
The costs fox' water and wastewater seryice for you area will be divided into two ( 2 ) parts. The first
is a front footage charge that is assessed for the frontage of your property along 12th West street.
This will be assessed at $10.00 per front foot far water and vt�rastewater lines as the property is
developed. The proposal is that these fees would be set at the cost now exist* and would needto
be paid when the development is ready to sell Tats. The wastewater line south of the wastewater line
entering your property will not be constructed at this iime, but the cons will be set at the $ 10. DD per
%v �. Vixvii ��-it T, �!"i� i� uvii�{ii iii.L4.0 fii'.u� [L���7J�,u CL111VE.litC V L .gyp 1 V. VV #3G,f 1! V1R� lVll.l W�#Il UG UL1G L�. L�Ii1Lfime,.
The cost to run the wastewater gravity lime thru your property will be assessed at the $20. 4�3 per fool
as normally charged. This cast will be due an the portion of the line that is i�cluded in the plated area
prior to the time dots are sold within that phase of the subdivision.
The casts for the area capacity charges will be not more than $500-00 per developed acre, less the
250 foot. depth associated with the area included 7n the standard front footage changes. These costs
for the enure phase will be die prior to sellu.�g any Tots within ihphase of the subdivision being
developed'.
Wiffowbrook Partners wiH also P
rovide the land for the wastewater pumping station at no additional
costs to the city of Rexburg.
S J �
,f?C='
If you have any questions on these mems please get weith me at any, time..
Bruce`Sutherl'afid
Mayor, City of Rexburg
Q6, jt4
I
March 24, 2003
Willowbrook Partners
Kirby Forbush
3 800 W. 1000 N.
Rexburgjdaho
Re: Letter of Understanding,
STATE OF IDAHO
PC. Box 280
12 North Center Street
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax (208) 359-3022
e-mail rexburg@srv.net
The city of Rexburg as in the process of constxuciion water and wastewater lines in the area of your
proposed development. As discussed with you, the dines will need to cross thru your Viand and an
easement will be required.
The costs for water and wastewater service for you area will be divided into two ( 2 ) pars. The first
is a front footage charge that is assessed for the frontage of your property along 12"' west street.
This will be assessed at $10.00 per front foot for water and wastewater lines as the property is
developed. The proposal is that these fees, would be set at the cosi now existing and would need to
be paid when the development i's ready to sell lots. The wastewater line south of the wastewater line
entering your property will not be constructed at this time, but the casts will be set at the $10.00 per
foot.. When the lire is constructed this assessed amount of $10.00 per front fool will be due at that
time.
The cosi to run the wastewater gravity line thru your property will be assessed at the $Z0. 00 per foot
as normally charged. This cost will be due an the port�an aft�e line that is �included in the plated area
prior to the time lots are sold within that phase of the subdivision.
The cons for the area capacity charges vcrilX be not more than $500.00 per developed acre, fess the
ESQ foot depth associated with the area included in the standard front footagre charaP.q_ TheqP rnctc
for the entre phase will be due prior to
developed.
selling any dots within the phase of the subdivision beim
Willowbrook Partners will also provide the land for the wastewater pumping station at no additional
casts to the city of Rexburg..
If you have any questions on these items please get with me at any firneft
Sqf'ncerely,
Bruce'6utherra'fid
Mayor, Citi of Rexburg
Mr. Greg Eager
Division of Environmental Quality
900 North Skyline Drive
Suite B
Idaho Falls. Idaho 83402
�1
l �l/ �// l !' 1 �ll l'i�
STATE OF I DAHO
Re: VVillaw Brook Estates Subdivision Division No. 2
Dear Greg;
P.O. Box 280
12 North Center Street
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax (208) 359-3022
e-mail rexburg@srv.net
We have reviewed the plans and specifications for the proposed WffIow Brook Estates Division
No. 2 and have approved the engineering plans with minor revisions, sions. We have also determuned that
the city has adequate capacity m' our water systems and wastewater system to meet the demands
resulting from the development of this subdivision. The developer will be paying connection fees that
will be used for the expansion of our systems capacities. Water and waste water mains are adjacent
to this development and the city has planned four several years for this area to be developed. VVe are
requiring that as constructed plans and test results be submitted prior to our acceptance of this or any
other development. We wig see that you are also provided a copy of the final documents.
If you have questions or need further information please contact me at any time.
Sincerely'...,
John W. Millar P.E./L.S.
Public Works Director
cc: Kirby Forbush
STATS OF IDAHO
DEPARTMENT OF
ENVIRONMENTAL QUALITY
900 North Skyline, Suite B Idaho Falls, Idaho 83402-1-718 (208) 528-2650
June 19, 2003
Kirby Forbush
Willow Brook Partners, L.L.C.
P.O. Box 674
Rexburg,ID 83440
Re: Willow Brook Estates Div., No,, 2,, City of Rexburg City DEQ # 03-10-33
Dear Mr. Forbush
Dirk Kempthorne, Governor
C. Stephen Allred, Director
We lave reviewed the plans and specifications for the Proposed water and sewer design. The project plans
and specifications appear to meet State standards and are hereby approved conditional on the following
modifications to the project plans:
1. Ref, sheet I -. Water Notes, # 1 and 13: Nate 1 should clarify which specification will prevail
if there is conflicting information between the two listed. Note 13 should be modified to read
"The waterline constructions shall conform to IDAPA 58.01-08 Idaho Rule for public
Dra -nking Water Systems" .
2. Ref. Sheet 1: Sewer Nates 9, 18 and 24: Notes 9 and 24 are redundant. Note 1$ should be
modified and reference to the {City of Idaho Falls should be deleted in the context of this nvtx;.
Our approval is for the design. We will give final project approval after the systems are constructed.,
D ev - ti i a +T. iuns fi r
- ��� f34sig"M that 1 ij. �. . JL of TTdahoRegilafusons o, st Irl
reviewed by this office before field installation. This office must be kept informed of the s h d
a'. -- 1mg of
all construction phasesthat we can make spot m"spections
This approval will expire June 19, 2004. If construction is not complete by the expiration date, plans will
need to be resubmitted for approval before further construction proceeds. Within 30 days after
construction, a professional engineer registered in the Skate of Idaho must provide this office with
as -built plans, or a letter of certification stating that the project was installed substantially according the approved design.
A copy of the approved design and specifications will be kept on fide at this office. Please reference DhQ
No. 03-10-33 when submitting any future correspondence related to this project. If you have any �
questions regarding this letteror if we can be of further assistance, please call me at (208) 528-2650. c`n
03-10-33SLOW BROOK DIV
Sincerely,
./
William Teuscyer PE
Water Quality Engineer
Enclosures
: Jeff Frir , PE Haper Levitt Eng. P.O. Box 50691 Idaho Falls, 183405 (enclosure)
John Millar PE., City of Rexburg P.O. B ., Rexburg,, ED 83440
Craig Hammond, State Plumbing InSPMOT, Oo ion 1D
Plan le (enclosure)
Real file
-10-33 WELLW BROOK DIV