Loading...
HomeMy WebLinkAboutJOIST - 04-00410 - 260 Mark Ave - New SFR (2)1 Weyerhaeuser This layout and associated material list is based on the project plans and/or information provided to the Weyerhaeuser Company. It remains the responsibility of the lumber dealer, builder, architect, designer or other responsible persons to review this information to assure that it is appropriate, accurate and complete. 8 Web stiffeners required each side at E1W B" diameter maximum hole for Il7/" - 20" joists; 6" diameter maximum for 9t/z" joists or for blocking panels less than 12" long. Do not cut flanges. Trus Joist rim board closure Filler block: Nail with ten JOIST AND BEAM LIST Rod (3") box nails, clinched. Use ten 16d (3tz") box nails Length Product from each side with 3%" Plies TJI® joist flange widths. 48' Use fifteen nails with TJI® Backer block: Install joist depths greater than tight to top flange 16". (tight to bottom flange .joist with face mount 4 hangers). Attach with 42' ten 10d (3") box nails, > t. 'Backer clinched when possible. 2 A4 block 9 1/2" TJI 110 both sides of 1 web with single H2 TJI® joists r DO NOT allow workers to walk on joists until WARNING Joists are unstable until braced laterally Bracing Includes: • Backing • Sheathing • Hangers • Rim Board • Strut Lines • Rim Joist DO NOT stack building materials on unsheathed braced. WARNING NOTES: joists. Lack of proper bracing during construction can result in serious accidents. Under normal conditions if the following guidelines are observed, accidents will be avoided. 1. Install all blocking, hangers, rim boards and rim joists at TJI s joist end supports. 2. Establish a permanent deck (sheathing), nailed to the first 4 feel of joists at the end of the bay or braced end wall. 3. Safety strut lines of 1x4 (minimum) must be nailed to a braced end wall or sheathed area. 4. Sheathing must be properly nailed to each TJI s joist befo-e additional loads can be placed on the system. 5. Ends of cantilevers require strut lines on both the top and bottom flanges. 6. TJI" joist flanges most remain straight within a tolerance of '/z" from true alignment. NAILING REQUIREMENTS TJI®joists at bearings: Two 8d (2Y") box r s (1 each sic minimum from end. Blocking panels, rim joist or rim board tobearing plate: TJI® blocking panels or rim joist: 10d (3") box mails at 6" o.c. Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or 16d (3Y2") box nails at 12" o.c. Shear transfer- Connections equivalent to decavng nail schedule M uurnpie le rd -nperl Ir'uriuny pruri regw r'ec ine rruo �vue i r-urtier� rvuner ouiue, See Trus joist orame,'s Pocket Guide for Product Trademark Information Rim board rim joist or closure to TJI ® joist 1314" width or less: Two 10d (3") box nails, onE each at top and bottom flange. 21116"thru 2%2" widths: Two 16d (3Y2') box nail one each at top and bottom flange 3%2" width: Toenail joist to rim joist with one 10d (3") box nail each side of joist top flange. 2x4 minimum squash blacks: Two 1 Old (3") Cox nails, one each at top and bottom flange. E ix ux pertf, ��Ve HEADER LIST Plot ID Length Product Plies Qty Hall 10' 3 1/2" x 9 1/2" 1.7E TimberStrand LSL 1 2 HANGER LIST - Simpson Strong -Tie Company, Inc.® Plot ID Qty Product Label Top Nails Face Nails Member Nails Notes H1 3 IUT9 8-N10 2-N10 (5) Hanger Notes: (5) Backer Blocks Required ACCESSORIES LIST Plot ID Length Product Plies Qty Rml 16' 1 1/4" x 9 1/2" 1.3E TimberStrand LSL 1 13 Bbl 1' 5/8" or 3/4" Backer Blocks 1 6 Bkl 1' 5 7/16" 9 1/2" TTI 110 Blocking Panels 1 11 Bkl* 1' 2 3/8" 9 1/2" TTI 110 Blocking Panels 1 1 Shl 4' x 8' 23/32" Structurwood Edge Gold (24" Span Rating) 1 59 Bk*, Random length blocking panel cuts Bk, Blocking Panels; Rim, Rim Board LEVEL NOTES File Name: Stock Rexburg - Dave Harris Const (04-U7730-433). JOB Level Name: Main Floor Framing Plotted: 11 / 16/2004 13: 10 Des* Stai Main Floor Framing... 11/16/2004 13:05 NOTE: Level design times indicated above provid assurance for groper level stacking. Design Methodology: ASD Floor Area Loading Is: 40psf Live Load and 15 psf Dead Load Maximum Joist Deflection: L/480 Live Load L/240 Total Load TJ -Pro Rating Information: Weighted Average: 35 Lowest Rating: 34 Highest Rating: 35 Glued 8t Nailed Decking is Recuirec Direct Applied Ceiling is Not Required Floor Decking: 23/32" Structurwocd Edge Gold (24" Span Rating) Normal O.C- Spacing = 19.2"* Stardard Blocking: Bk1* *Unless noted otherwise Scale: 1I4" = V CREATED BY I Weyerhaeuser - SLC 2600 South 600 West Salt Lake City, UT 84115 (800) 283-9663 FAX: (801) 975-0958 JOB COMMENTS I Mike Birch C Stock Rexburg Ph: (208) 356-4626 Office # Job: Dave Harris Construction Alan Cook - Aerotech Design Ph: (208) 458-4452 Office # I SYMBOL LEGEND I Line Load Area Load O Detail Callout Label (See Framer's Pocket Guide) ii t Header, and -t indicates quantity of 2x_ trimmers required at ends Page 1 of 1 FOR THE TJ•XPERT WARRANTY SEE FRAMER'S POCKET GUIDE Preliminary Layout for Review and Approval TJ-Xpen 6.35 (#685) C6.35 06.35 S6.35 136.35 JOIST AND BEAM LIST Plot ID Length Product Plies Qty Al 48' 9 1/2" TJI 110 _foist 1 4 A2 46' 9 1/2" TTI 110 .joist 1 4 A3 42' 9 1/2" TJI 110 ,joist 1 2 A4 30° 9 1/2" TJI 110 ,joist 1 9 A5 28' 9 1/2" TJI 110 -joist 1 14 A6 4' 9 1/2" TTI 110 joist 1 1 A7 2' 9 1/2" TJI 110 joist 1 1 HEADER LIST Plot ID Length Product Plies Qty Hall 10' 3 1/2" x 9 1/2" 1.7E TimberStrand LSL 1 2 HANGER LIST - Simpson Strong -Tie Company, Inc.® Plot ID Qty Product Label Top Nails Face Nails Member Nails Notes H1 3 IUT9 8-N10 2-N10 (5) Hanger Notes: (5) Backer Blocks Required ACCESSORIES LIST Plot ID Length Product Plies Qty Rml 16' 1 1/4" x 9 1/2" 1.3E TimberStrand LSL 1 13 Bbl 1' 5/8" or 3/4" Backer Blocks 1 6 Bkl 1' 5 7/16" 9 1/2" TTI 110 Blocking Panels 1 11 Bkl* 1' 2 3/8" 9 1/2" TTI 110 Blocking Panels 1 1 Shl 4' x 8' 23/32" Structurwood Edge Gold (24" Span Rating) 1 59 Bk*, Random length blocking panel cuts Bk, Blocking Panels; Rim, Rim Board LEVEL NOTES File Name: Stock Rexburg - Dave Harris Const (04-U7730-433). JOB Level Name: Main Floor Framing Plotted: 11 / 16/2004 13: 10 Des* Stai Main Floor Framing... 11/16/2004 13:05 NOTE: Level design times indicated above provid assurance for groper level stacking. Design Methodology: ASD Floor Area Loading Is: 40psf Live Load and 15 psf Dead Load Maximum Joist Deflection: L/480 Live Load L/240 Total Load TJ -Pro Rating Information: Weighted Average: 35 Lowest Rating: 34 Highest Rating: 35 Glued 8t Nailed Decking is Recuirec Direct Applied Ceiling is Not Required Floor Decking: 23/32" Structurwocd Edge Gold (24" Span Rating) Normal O.C- Spacing = 19.2"* Stardard Blocking: Bk1* *Unless noted otherwise Scale: 1I4" = V CREATED BY I Weyerhaeuser - SLC 2600 South 600 West Salt Lake City, UT 84115 (800) 283-9663 FAX: (801) 975-0958 JOB COMMENTS I Mike Birch C Stock Rexburg Ph: (208) 356-4626 Office # Job: Dave Harris Construction Alan Cook - Aerotech Design Ph: (208) 458-4452 Office # I SYMBOL LEGEND I Line Load Area Load O Detail Callout Label (See Framer's Pocket Guide) ii t Header, and -t indicates quantity of 2x_ trimmers required at ends Page 1 of 1 FOR THE TJ•XPERT WARRANTY SEE FRAMER'S POCKET GUIDE Preliminary Layout for Review and Approval TJ-Xpen 6.35 (#685) C6.35 06.35 S6.35 136.35