Loading...
HomeMy WebLinkAboutFOUNDATION DRAINAGE - 04-00323 - 54 Valley View Dr - New SFR'r .. N 'O O o C�o (U q Ir -I �'d > ba.i o .mw y A >cuo0 � bo.0 N q N° O�w0 .1 `� C U • N O O O 0 0 p y a� b � v0 kf) 41 � � j � a� cid b d' 0 •.1 i p v p > 0.0 O o (U a o o d Cd U ov°op c B o �•� �? °U° > ZJ QQ�3k°a c tom-" O O '' p �-I o � � � N � •y°7 «. oaoo=wou y�a 0 o a o„ .o y o aN .;a *- ow•p ' a4. o Y o W) o° A o El Z a G~ cn 5a a 0 ° u"' a a T VV 0 7 a id El r. 9>i u12Jou 3 av «'Cpq O O O _T 7 , N O A O O .G W .0 N 0 a �i '� > & OC Q. "y� 0 'C CCS � y e_A O VO .98 i'j E a N 0 O° V '.' �D ^.� y 81 E O d >°� WC w o.0 - N o FA koo 6u °r N c radE o> 3 'C O O y s N 0 U G°G CNN O 'i vOi O OO y� 0 b Q� O r-1 1 o O i 0 Q C: G o O Z w'�c 01� dSmg�Aa 13 o•o Pw w a�c yUN •C Qa$'� .�9.]A6Jj �gI :6m yOai Yy mOgao .2 vc oov� °N 14 C4 0 .x w 30 d is }y>d? .-... •s a`S o o q 01 •0�e t'J .O O•��•�60�'C O y�•41 o I o•O 1 0 o •os— C7 H 'wC hU yySo°w 0vy LLI 00 0 =•-°�°"��o ��°o cFO 0 H? Am y0 4c .0 •G m. PR g itl 09 > o 0 O v p •^J "w7 a) o« o a E �' ° E d 2.00 LU > y °= i s o a a, v 4 g o o'o y Z o ko o c G bog •G 0 a u n o 3 0- 0 0 3 PO ° LL far° °a"irzM,'M E °c Q jmC7 Q> C C &.8 E V y Ty O 99 N G 0>� W W 69'.07 04 a 5 t'P. 8 O O .° N k^ 9 N N U E Figure 4. Recommended construction details for APA portal frame bracing design with hold-downs (For use details see Table 2 PORTALFRAME---i FOR FRAMES OVER 8', PANEL SPLICE (IF NEEDED) SHALL OCCUR WITHIN 24" OF MID -HEIGHT. BLOCKING IS REQUIRED. IF 2X_ BLOCKING IS USED THEN IT MUST BE STITCH NAILED WITH ONE ROW OF 16D SINKERS AT 3" O.C. or 24" DOUBLE 2x_ POST 4200 LB HOLD DOWN STRAP APPLIED OVER SHEATHING INSTALLED IN CONCRETE PER MANUFACTURERS INSTRUCTION 5/8" DIA. ANCHOR BOLT WITH 7" MIN. I EMBEDMENT 4 2" X 2" X 3/16" PLATE WASHER FRONT ELEVATION BLE PORTAL 4 A FRAME 1000 LB .�, • ; , 3" X 11,26" MIN. HEADER (BUILT-UP, SOLIDSAWN, GLULAM, ETC) 6' TO 18' ..I i TYPICAL FASTEN TOP PLATE TO HEADER WITH TWO ROWS OF " 160 SINKERS AT 3" O.C. TYP. 2X— FRAMING �• 1000 LB HEADER STRAP OPPOSITE SHEATHING AS SHOWN i• 1000 LB HOLD (SEE SECTION A -A) TYP. I DOWN STRAP FASTEN SHEATHING TO HEADER WITH 8D COMMON „ NAILS IN 3” GRID PATTERN AS SHOWN AND 3„ O.C. 10' ... �_.__._... IN ALL FRAMING (STUDS, AND SILLS) TYP. FOR FRAMES OVER 8', PANEL SPLICE (IF NEEDED) SHALL OCCUR WITHIN 24" OF MID -HEIGHT. BLOCKING IS REQUIRED. IF 2X_ BLOCKING IS USED THEN IT MUST BE STITCH NAILED WITH ONE ROW OF 16D SINKERS AT 3" O.C. or 24" DOUBLE 2x_ POST 4200 LB HOLD DOWN STRAP APPLIED OVER SHEATHING INSTALLED IN CONCRETE PER MANUFACTURERS INSTRUCTION 5/8" DIA. ANCHOR BOLT WITH 7" MIN. I EMBEDMENT 4 2" X 2" X 3/16" PLATE WASHER FRONT ELEVATION BLE PORTAL 4 A FRAME 1000 LB STRAP ..I i TYPICAL PORTAL FRAME CONSTUCTION j 2X— FRAMING I i i• 1000 LB HOLD I DOWN STRAP NOT TO SCALE SHEATHING FILLER IF NEEDED i6D SINKERS 2 ROWS @ 3" O.C. 3/8" MIN. THICKNESS WOOD STRUCTURAL PANEL 4200 LB HOLD DOWN STRAP APPLIED OVER SHEATHING Form TT -073 Page 9 of 10 1000 LB HEADER STRAP SECTION A -A SIDE ELEVATION I d N E O M w 9 00 w , �.mC d o N o 0 L N N O p Q LL LL p Z C O Z c U U U T 6. m m G — N U� O O c m a) O C C C OO.0 T m L O) O �r O N C iC C'0> C r CN c y — m O U N co 0 0 C w a7 c M Z �KUfn N Z T n i O C v0 p EC LL N O U -6 c FF2�� o O[2 QdLLOZ 0 N y > T 0 m T rn 3G U 0 <? o V = 3 N O) a E 0.= �o UM U0 U) LL N mNo2fOf0: Cl i- N m i c c m E me N 7 y N L NN U L QLLti0z v co } L U o v C w T T a0 to E 3 O o O c-0 0 M O 0 00 .p N D) N N 01 04E N V O C +0, NU N L V �o UM U fa a f0 U 'O LL N m N o i S W M >- C% % O) C O y N 3 °� da° C v_ d Nm y o m O y U(n C O .fl L co 0 R m [L F0F F- 0 LL O N o rn N o _� � c U U 6 N _w a c m a) m L O) O — m E ( 0 C w a7 c M m a U �[2 .N-. U -6 c y 2 „LO„ 0 Q) -O CLC U) �E f u-0 N c 0 m a$ rn 3G U 0 w V = 3 N o a E 0.= N N �� Qc t� N N L O O r C N 7 y N L NN U L V CD �O L U LL2via).0 = v C w C y to E 3 O o O c-0 O E N 0 00 .p N D) N O N V O C +0, NU N L V 0'— M2Nzfnan.w fa a f0 U 'O N N .� 0 R m [L F0F F- 0 LL Figure 5. Recommended construction details for APA portal frame bracing without hold-downs (For use details see Table 2) to 3" X 11.26" MIN. HEADER (BUILT-UP, SOLID SAWN, J. . � . ,., GLULAM, ETC) i ' FASTEN TOP PLATE TO HEADER WITH TWO ROWS OF 'I 16D SINKERS AT 3" O.C. TYP. j I 1000 LB HEADER STRAP OPPOSITE SHEATHING AS SHOWN •.I (SEE SECTION A-A)TYP. FASTEN SHEATHING TO HEADER WITH BD COMMON NAILS IN 3" GRID PATTERN AS SHOWN AND 3" O.C. 10' • •' -.' IN ALL FRAMING (STUDS, AND SILLS) TYP. •! FOR FRAMES OVER 6', PANEL SPLICE (IF NEEDED) SHALL OCCUR WITHIN 24" OF MID -HEIGHT. BLOCKING IS REQUIRED. IF 2X BLOCKING IS USED THEN IT MUST BE I j STITCH NAILED WITH ONE ROW OF 16D SINKERS AT 3" O.C. I.. 18., / SEE TYP. CORNER FRAMING DETAIL 1/2" DIA. ANCHOR BOLT WITH 7" MIN. EMBEDMENT & 2" X 2" X 3/16" PLATE WASHER, TYP. � t i ♦ A FRONT ELEVATION NOT TO SCALE SECTION A -A SIDE ELEVATION SHEATHING FILLER IF NEEDED 16D SINKERS 2 ROWS @ 3" O.C. 1000 LB HEADER STRAP /8" MIN. HICKNESS VOOD ITRUCTURAL ANEL CORNER FRAMING DETAIL Form TT -073 Page 10 of 10 FRAMING FOR 16D NAIL @ 24 GYPSUM WALL IN. O.C. BOARD (OPTIONAL) BD NAIL @ 6 IN, O.C. IN ALL PANEL EDGES NOT PART OF PORTAL FRAME PORTALFRAME WALL SEGMENTTYP. CORNER FRAMING DETAIL Form TT -073 Page 10 of 10