Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 4 - The Grove at Thomson FarmsInspection Date: 06/24/2021 File Name: 20001DFR06242021BB Inspector's Signature:Inspector's Name: Ben E. Ball Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/24/2021 5bb6bb008ab71bc7-1624547306584 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: The Grove Start Time: 08:00 AM Client: Stillwater Equity Partners Contractor: H-K Contractors End Time: 11:30 AM Inspection Type(s): Other Location(s): The Grove the road farthest west and the east west street Observations/ Remarks: Arrived on site approximately at 08:30. Was informed that the hot plant was broke down for the day at approximately 11:00 Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/24/2021 File Name: 20001DFR06242021BB Inspector's Signature:Inspector's Name: Ben E. Ball Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/24/2021 5bb6bb008ab71bc7-1624547306584 2