HomeMy WebLinkAboutJOIST - 04-00250 - 424 S 5th E - AdditionTrus Joist
rim board
A3
Web stiffeners
required each
side at E1W
B" diameter maximum hole for
IP/" - Win joists; 6" diameter
maximum for 62" joists or for
blocking panels less than 12"
long. bo not cut flanges.
Filler block; Nail with ten
104 3" box nails, clinched.
Use ten 16d (3�`) box nails
from each side with 3%"
TJIe joist flange widths.
Use fifteen nails with TJIe
joist depths greater than
16". � .
Trus Joist rim
board closure
Backer block; Install
tight to top flange
(tight to bottom flange
with face mount
hangers). Attach with
ten 10d (3") box nails,
clinched when possible.
Backer block
both sides of
web with single
TJI° joists
TJ-Xpert framing plan re,
E_= --, cist Framer's Pocket
INS Trus
Prodccc '
Framer's
Information
Sri
Pc5
ee
L�
i
A14 _ r
.- 16" A1- N
13— B r —
t
H4
�z b
—RM
1 I H2 A6 v^ H9 _
Pc3 Pc4
DO NOT allow workers
to walk or joists until
braced
WARNING
Joists are unstable until braced laterally
Bracing Includes:
• Blocking • Sheathing
• Hangers • Rim Board
• Strut Lines • Rim Joist
DO NOT stack building
materials on unsheathed
WARNING NOTES: joists.
Lack of proper bracing during construction can result in serious accidents. Under
normal conditions if the following guidelines are observed, accidents will be avoided.
1. Install all blocking, hangers, rim boards and rim Joists at TJI 'o joist end supports.
2. Establish a permanent deck (sheathing), nailed to the first 4 feel of joists at the end of the bay or braced end wall.
3. Safety strut lines of 1x4 (minimum) must be nalled to a braced end wall or sheathed area.
4. Sheathing must be property nailed to each TJI ® joist before additional loads can be placed on the system.
5. Ends of cantilevers require strut lines on both the top and bottom flanges.
6. TJI'a joist flanges must remain straight within a tolerance of Y2" from true alignment.
NAILING REQUIREMENTS
TJI® joists at bearings: Two Bd (2Y") box nails (1 each side), 1Y"
minimum from end.
Blockina Panels. rim foist or rim board to bearing Plate:
TJI® blocking panels or rim joist: 10d (3") box nails at 6" o.c.
Trus Joist rim board: Toenail with 10d (3") box nails at 6" o.c. or
16d (3Y") box nails at 12" o.c.
Shear transfer., Connections equivalent to decking nail schedule
Rim board, rim joist or closure to TJI® 21st:
1314' width or less: Two 10d (3") box nails, one each at top and
bottom flange.
21',e" thru 2%Z" widths: Two 16d (VV) box nails, one each at top and
bottom flange.
3;12" width: Toenail joist to rim joist with one 10d (3") box nail each
side of joist top flange.
2x4 minimum squash blocks: Two 10d (3") box nails, one each
at top and bottom flange.
4UTJAXPert,
CREATED BY
&NC WES^
202 WEST NA'H ST
REXBURG, ID 83940
(2081356-9292
FAX; (208)356-3299
LEVELNOTES
JASON HARRIS.JOB
Plotted: 7/20/2004 16:21
Design Status:
MAIN FLOOR... 7/20/2004 16:18
NOTE: Level design times indicated above provide.
assurance for proper level stacking.
Design Methodology: ASD
Floor Area Loading. Is:
40p5f Live Load and 12 psf Dead Load
Maximum Joi at Deflection:
L/4BO Live Load
L/240 Total Load
TJ -Pro Rating Information:
Weighted Average: 51
Lcwest Rating: 44
Highest Rating: 71
Glued 6 Nailed Decking is Required
Suspended Ceiling is Assumed
Floor Decking: 23/32" Panels (24" Span Rating)
Normal O.C. Spacing = 16"*
Standard Blocking: Bkla
*Unless noted otherwise
Layout Scale: 1/4" = 1'
SYMBOL LEGEND
Point Load
Line Load
Area Load
O1eta_1 Cal lout Label
(See framer's Focket Guide)
HANGER LIST - Simpson
Strong -Tie Comport_,
:_...._
Plot ID
Plot 1,3
Procuct --abel Top
Nails Face Nails
MemerHails
Nates
HI
3 I-JT9
8-N10
2-N10
(5)
H2
7 rJT9
8-N10
2-N10
1 1
H3
1 I"UT29
8-N10
2-N10
Pct
H4
2 IUT29
8-N10
2-N10
(5)
Hanger Notes:
15) Backer
Blocks Required
P
5'
- '_/2'
CREATED BY
&NC WES^
202 WEST NA'H ST
REXBURG, ID 83940
(2081356-9292
FAX; (208)356-3299
LEVELNOTES
JASON HARRIS.JOB
Plotted: 7/20/2004 16:21
Design Status:
MAIN FLOOR... 7/20/2004 16:18
NOTE: Level design times indicated above provide.
assurance for proper level stacking.
Design Methodology: ASD
Floor Area Loading. Is:
40p5f Live Load and 12 psf Dead Load
Maximum Joi at Deflection:
L/4BO Live Load
L/240 Total Load
TJ -Pro Rating Information:
Weighted Average: 51
Lcwest Rating: 44
Highest Rating: 71
Glued 6 Nailed Decking is Required
Suspended Ceiling is Assumed
Floor Decking: 23/32" Panels (24" Span Rating)
Normal O.C. Spacing = 16"*
Standard Blocking: Bkla
*Unless noted otherwise
Layout Scale: 1/4" = 1'
SYMBOL LEGEND
Point Load
Line Load
Area Load
O1eta_1 Cal lout Label
(See framer's Focket Guide)
JOIST AND BEAM LIST
Plot ID
Length
Product
Plies Qty
A
See Layout
9 1/2" TJI 110 foist
1
B
SeeLayout
9 1/2" TJI/Pro-150 ioist
1
M1
12'
1 3/4" x 9 1/2" 1.9E Mlcrollam LVL
1 1
ACCCSSORIES LIST
Pct
Paz
P
5'
- '_/2'
1
-_r9
Smi
ax 0 ° r'B" r re-F..r .:. -:,,,
1
?]l
11/2"
or 5/8" Cackle 3=oeks
1
-/2" TJI 110 Blocking Panels
1
3k -4S'
'
9 -/2" TJI 110 Blacking Panels
1
B,,, Randoc
-PaeClocking
panel cute
Bz, Blocking Panels;
In, Rim board; Is, Paraile'_ Closure
CREATED BY
&NC WES^
202 WEST NA'H ST
REXBURG, ID 83940
(2081356-9292
FAX; (208)356-3299
LEVELNOTES
JASON HARRIS.JOB
Plotted: 7/20/2004 16:21
Design Status:
MAIN FLOOR... 7/20/2004 16:18
NOTE: Level design times indicated above provide.
assurance for proper level stacking.
Design Methodology: ASD
Floor Area Loading. Is:
40p5f Live Load and 12 psf Dead Load
Maximum Joi at Deflection:
L/4BO Live Load
L/240 Total Load
TJ -Pro Rating Information:
Weighted Average: 51
Lcwest Rating: 44
Highest Rating: 71
Glued 6 Nailed Decking is Required
Suspended Ceiling is Assumed
Floor Decking: 23/32" Panels (24" Span Rating)
Normal O.C. Spacing = 16"*
Standard Blocking: Bkla
*Unless noted otherwise
Layout Scale: 1/4" = 1'
SYMBOL LEGEND
Point Load
Line Load
Area Load
O1eta_1 Cal lout Label
(See framer's Focket Guide)