Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PLANS - 21-00472 - 645 Park St - Solar Panels
CONTRACTOR INFORMATIONDESIGNED BYSOLAR PHOTOVOLTAIC SYSTEMDATEISSUED FOR: PERMIT PROJECT INFORMATION, VICINITY MAP www.bigdogenergy.com P V - 1 6/4/2021 ALL CONDUIT TO RUN ON EXTERIOROF HOUSE UNLESS OTHERWISE NOTEDOCCUPANCY:R-3CONSTRUCTION TYPE:VBUNSPRINKLEREDALL MODULES WILL BE GROUNDED IN ACCORDANCE WITH THECODE AND THE MANUFACTURES INSTALLATION INSTRUCTIONS.ALL PLACARDS REQUIRED BY NEC 2017 CODE MACHINEPRINTED LETTERS IN A CONTRASTING COLOR TO THE PLACARD.LIQUID TIGHT FLEXIBLE CONDUIT SHALL BE SUNLIGHTRESISTANT. ELECTRICAL INSTALLATION WILL COMPLY WITH NEC2017 CODE. ALL SOLAR MODULES EQUIPMENT AND METALLICCOMPONENTS ARE TO BE BONDED. ALL PLUMBING ANDMECHANICAL ROOF VENTS TO CLEAR FROM PHOTOVOLTAICARRAY, OR EXTEND ABOVE SOLAR PANELS. SOLARPHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIALSTRUCTURE. DESIGN COMPLYING WITH THE IBC 2018 CODEAND ALL LOCAL ORDINANCES AND POLICIES. THE PROJECT HASBEEN DESIGNED TO WITHSTAND A MINIMUM 110 MPH WINDLOAD. THE SYSTEM WILL NOT BE INTERCONNECTED UNTILAPPROVAL FROM THE LOCAL JURISDICTION AND A UTILITY ISOBTAINED. IF THE MAIN SERVICE PANEL DOES NOT HAVEVERIFIABLE GROUNDING ELECTRODE, IT IS THE CONTRACTORSRESPONSIBILITY TO INSTALL SUPPLEMENTAL GROUNDINGELECTRODE. EACH MODULE WILL BE GROUNDED USING THESUPPLIED CONNECTION POINTS IDENTIFIED ON THE MODULEAND THE MANUFACTURERS INSTALLATION INSTRUCTIONS. ALADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCEWITH OSHA REGULATIONS. PROPER ACCESS AND WORKINGCLEARANCE WILL BE PROVIDED "WARNING: PV POWERSOURCE" TO BE PLACED EVERY 10 FT.GFCI PROTECTION IN INVERTER.MSPSUBACDCSLCMINVJBCBFMC M A I N S E R V I C E P A N E L S U B S E R V I C E P A N E L A C D I S C O N N E C T D C D I S C O N N E C T S O L A R L O A D C E N T E R M O N I T O R I N G M E T E R I N V E R T E R J U N C T I O N B O X C O M B I N E R B O X F L E X I B L E M E T A L L I C C O N D U I T ( E ) ( N ) E X T I N T E M T R M T V O C V M P I S C N T S E X I S T I N G N E W E X T E R I O R I N T E R I O R E L E C T R I C A L M E T A L L I C T U B I N G R I G I D M E T A L L I C T U B I N G V O L T A G E O P E N C I R C U I T V O L T A G E A T M A X . P O W E R S H O R T C I R C U I T C U R R E N T N O T T O S C A L E I M P C U R R E N T A T M A X . P O W E R A L L W O R K T O C O M P L Y W I T H T H E F O L L O W I N G C O D E : N E C 2 0 1 7 C O D E I B C / I R C / I F C 2 0 1 8 C O D E P V - 1 P R O J E C T I N F O R M A T I O N , V I C I N I T Y M A P P V - 2 S I T E P L A N , A E R I A L V I E W P V - 3 E L E C T R I C A L L I N E D I A G R A M A N D N O T E S P V - 4 R E Q U I R E D S I G N A G E ADDITIONAL NOTES P L A N S E T L E G E N D A B B R E V I A T I O N S P R O J E C T I N F O R M A T I O N V I C I N I T Y M A P A P P L I C A B L E C O D E S S H E E T I N D E X 2 4 X 3 7 5 W J I N K O P H O T O V O L T A I C M O D U L E S 2 X 7 . 6 K W S E P R I S M S Y S T E M S I Z E : 9 K W D C S T C A R R A Y A R E A : 4 0 8 S F D A V I D N I B A R G E R 6 4 5 P A R K S T R E X B U R G , I D 8 3 4 4 0 5 0 9 - 2 1 8 - 3 5 2 5 DAVID NIBARGER 645 PARK ST REXBURG, ID 83440 509-218-3525 Big Dog Renewable Electric Energy Contractor Lic #017916 620 Pheasant Ridge Dr Chubbuck, ID 83202 208-242-3352 T 208-232-5935 F X____________________ N MTRMSP INV BATT INV BLOADS BI ACMTR WITHIN3' OF DISCONNECT AC RS CONTRACTOR INFORMATIONDESIGNED BYSOLAR PHOTOVOLTAIC SYSTEMDATEISSUED FOR: PERMIT SITE PLAN, AERIAL VIEW www.bigdogenergy.com P V - 2 SITE PLAN A E R I A L V I E W S C A L E : N T S S C A L E : 1 " = 3 0 ' - 0 " TOTAL # OF PANELS24 A B B R E V I A T I O N S I N V M S P A C I N V E R T E R M A I N S E R V I C E P A N E L A C D I S C O N N E C T M T R M E T E R Big Dog Renewable Electric Energy Contractor Lic #017916 620 Pheasant Ridge Dr Chubbuck, ID 83202 208-242-3352 T 208-232-5935 F X____________________ 6/4/2021 DAVID NIBARGER 645 PARK ST REXBURG, ID 83440 509-218-3525 B A T T B A T T E R I E S B L O A D S B A C K U P L O A D S ROOF TYPE:METAL B I B A C K U P I N T E R F A C E R S R A P I D S H U T D O W N WIRE AND CONDUIT CALLOUTS(2) #10 AWG PV/RHW-2(1) #6 AWG BARE COPPER GND IN FREE AIR(2)#10 THWN-2 IN 34" EMT/FMC(1)#10 THWN-2(3)#8 AWG THWN-2(1)#10 AWG THWN-2 GND IN 34" EMT(3)3/0 AWG THWN-2(1)#6 AWG THWN-2 GND IN 1 1/2" EMT(3)#10 AWG THWN-2 IN 34" FMC(2)#14 AWG THWN-2(1)#14 AWG THWN-2 GND IN 34" PVC600V RATED CAT 5 CABLE IN 12" EMT ELE C T R I C A L E Q U I P M E N T C A L L O U T S N E W 2 0 0 A M A I N S E R V I C E P A N E L ( W / B I D I R E C T I O N A L U T I L I T Y M E T E R ) P 4 0 1 S O L A R E D G E O P T I M I Z E R S O L A D E C K M O D E L 0 7 8 3 - 4 1 J U N C T I O N B O X / R O O F P E N E T R A T I O N , 6 0 0 V 7 . 6 k W I N V E R T E R U N G R O U N D E D S O L A R E D G E S E 7 6 0 0 H - U S W / P R I S M T E C H N O L O G Y ( 2 4 0 V ) I N V E R T E R 2 4 0 V A C , 3 2 A , N E M A 3 R , U L L I S T E D , ( W / I N T E G R A T E D D C D I S C O N N E C T ) W I T H I N T E G R A T E D G F P , W / I N T E G R A T E D A F P L G C H E M R E S U 1 6 H U L 1 6 4 2 & U L 1 9 7 3 , 1 6 K W H 2 0 0 A S U B P A N E L I N H O U S E F E E D I N G H O U S E R A P I D S H U T D O W N S W I T C H S O L A R E D G E B A C K U P I N T E R F A C E S Q U A R E D S A F E T Y S W I T C H , P / N 3 1 1 2 6 0 0 V D C , 6 0 A , N E M A 3 R , F U S I B L E , 1 0 , 0 0 0 A I C , U L , N E M A , C S A , N O M C E R T I F I E D W / 4 0 A F U S E S # H 2 2 2 N R B 12 9,000W TOTAL SOLAR ARRAY24 JINKO 375W MODULESARRAY 11 STRING OF 12 MODULES @ INVERTER SOLAREDGE 7.6KW W/PRISM1 STRING OF 12 MODULES @ INVERTER SOLAREDGE 7.6KW W/PRISM ABCINGNNGL1L1 4 4L2L2 _ ~ D 1 2 M O D U L E S I N S E R I E S B S T R I N G 1 T I L T : 2 8 ° A Z I M U T H : 1 7 0 ° O N E P E R P A N E L C 1 2 M P P T 1 M P P T 3 M P P T 2 LABEL TO SAYMANUAL DISCONNECT F O R PARALLEL GENERATION 2 O F 2 L G C H E M R E S U 1 0 6 E NNGF 200A 5NO LOADSOVER 25A G 7PAGE 143FOR COMPLIANCE WITHNEC 690.12 DH5EFGH45678200A40A 8 8 INNGA200AHOUSELOADSLABEL TO SAYMANUAL DISCONNECT FORPARALLEL GENERATION 1 OF 2 M P P T 1 M P P T 3 _ ~ D 4 M P P T 2 INGNNGL1L2L1L24 1 2 M O D U L E S I N S E R I E S B S T R I N G 1 T I L T : 2 8 ° A Z I M U T H : 1 8 0 ° O N E P E R P A N E L C 1 2 40A WITHIN 3' M O D U L E : J I N K O 3 7 5 W V o c = 4 4 . 1 2 V I s c = 1 1 . 0 1 A V m p = 3 6 . 8 0 V I m p = 1 0 . 1 9 A A L L M O D U L E S W I L L B E G R O U N D E D I N A C C O R D A N C E W I T H C O D E A N D T H E M A N U F A C T U R E R ' S I N S T A L L A T I O N I N S T R U C T I O N S . ELECTRICAL SINGLE LINE DIAGRAM CONTRACTOR INFORMATIONDESIGNED BYSOLAR PHOTOVOLTAIC SYSTEMDATEISSUED FOR: PERMIT SINGLE LINE DIAGRAM P V - 3 S C A L E : N T S E L E C T R I C A L N O T E S R A C K I N G & M O D U L E S A R E G R O U N D E D V I A A C O N T I N U O U S # 6 A W G C O P P E R C O N D U C T O R C O N N E C T E D W / W E E B S - M O D U L E S A R E F A C T O R Y P R O V I D E D W / 2 T H R E A D E D H O L E S T O F A C I L I T A T E L A N D I N G O F T H E L U G S A L L E Q U I P M E N T S H A L L B E P R O P E R L Y G R O U N D E D A N D B O N D E D I N A C C O R D A N C E W I T H A R T I C L E 2 5 0 . A L L C I R C U I T S C O N N E C T E D T O M O R E T H A N O N E S O U R C E S H A L L H A V E O V E R C U R R E N T D E V I C E S L O C A T E D S O A S T O P R O V I D E O V E R C U R R E N T P R O T E C T I O N F R O M A L L S O U R C E S 6 9 0 . 9 ( A ) www.bigdogenergy.com Big Dog Renewable Electric Energy Contractor Lic #017916 620 Pheasant Ridge Dr Chubbuck, ID 83202 208-242-3352 T 208-232-5935 F X____________________ 6/4/2021 DAVID NIBARGER 645 PARK ST REXBURG, ID 83440 509-218-3525 1 . P V A R R A Y S A R E P E R S I N G L E L I N E . 2 . P V A R R A Y W I R I N G T O J U N C T I O N I S # 1 0 A W G U S E 2 W / F I E L D I N S T A L L E D M C C O N N E C T O R S T O I N T E R F A C E W / M O D U L E S . 3 . P V A R R A Y C O M B I N E R / J U N C T I O N B O X P R O V I D E S T R A N S I T I O N F R O M A R R A Y W I R I N G T O C O N D U I T W I R I N G . 4 . U S E U F E R G R O U N D E L E C T R O D E S Y S T E M F R O M I N V E R T E R T O E X I S T I N G M A I N S E R V I C E G R O U N D E L E C T R O D E P E R N . E . C . 2 5 0 . 5 8 . 5 . G R O U N D E L E C T R O D E C O N D U C T O R F R O M I N V E R T E R T O G R O U N D E L E C T R O D E T O B E M I N I M U M P R O T E C T I O N O F B A R E A R M O R S H E A T H E D C A B L E F O R A L L C O N D U C T O R S I Z E S . 6 . A L L G R O U N D C O N N E C T E D T O M A I N S E R V I C E G R O U N D I N M A I N S E R V I C E P A N E L . 7 . C O N N E C T O R S S H A L L B E P O L A R I S O R E U R O S T R I P I T C O N N E C T O R S . 8 . I N V E R T E R S H A L L B E P E R S I N G L E L I N E , S E E A T T A C H E D C U T S H E E T . 9 . I N V E R T E R I S P E R S I N G L E L I N E . 1 0 . A C D I S C O N N E C T S H A L L B E P E R S I N G L E L I N E . 1 1 . E Q U I P M E N T G R O U N D I N G C O N D U C T O R S O N A C A N D D C S I D E S I Z E D A C C O R D I N G T O N . E . C . 6 9 0 . 1 2 . P O L E O F P V A R R A Y R E F E R E N C E D T O G R O U N D A T T H E I N V E R T E R I N S I N G L E L I N E . 1 3 . A L L C O N D U C T O R S S H A L L B E 6 0 0 V , 9 0 C S T A N D A R D C O P P E R . A L L C O N D U C T O R S I N C O N D U I T S H A L L B E T H W N - 2 . 1 4 . M A X I M U M D C V O L T A G E D R O P S H A L L B E 2 . 5 % 1 5 . A L L C O N D U C T O R S S H A L L B E I N C O N D U I T U N L E S S O T H E R W I S E N O T E D . 1 6 . A L L W O R K T O C O M P L Y W I T H N E C 2 0 1 7 C O D E . 1 7 . D C A R R A Y C O N D U C T O R S A R E T O R E M A I N O U T S I D E O F B U I L D I N G P R I O R T O F U S I B L E C O M B I N E R B O X O R F U S I B L E D C D I S C O N N E C T M E A N S . 1 8 . E X A C T C O N D U I T R U N L O C A T I O N S S U B J E C T T O C H A N G E . 1 9 . 3 . 0 P S F M A X ( . 5 P S F F R O M R A C K I N G , 2 . 5 P S F F R O M M O D U L E S ) D E A D L O A D C O N T R I B U T E D F R O M S O L A R A R R A Y . 2 0 . A R C F A U L T I N S T A L L E D A T I N V E R T E R O R I N C O M B I N E R B O X . 2 1 . D C G R O U N D F A U L T P R O T E C T I O N I N T E G R A T E D I N I N V E R T E R . 2 2 . P O I N T O F C O N N E C T I O N B R E A K E R T O B E L O C A T E D O P P O S I T E E N D O F B U S B A R F R O M M A I N U N L E S S O T H E R W I S E N O T E D . 2 3 . A N Y U N D E R G R O U N D W I R I N G M E T H O D S W I L L C O M P L Y W I T H N E C 3 0 0 . 5 ( J ) , 3 0 0 . 7 ( B ) , 3 5 2 . 4 4 , A N D O T H E R S E C T I O N S O F C H A P T E R 3 A S A P P L I C A B L E . 2 4 . A N Y E X P O S E D P V C C O N D U I T S H A L L C O M P L Y W I T H N E C 3 5 2 . 1 0 2 5 . A L L P V S Y S T E M D C C I R C U I T S R U N I N S I D E A B U I L D I N G S H A L L B E C O N T A I N E D I N A M E T A L R A C E W A Y I N A C C O R D A N C E T O N E C 6 9 0 . 3 1 ( G ) 2 6 . C O M P L I E S W I T H 7 0 5 . 1 2 ( B ) ( 2 ) ( 3 ) ( B ) 2 7 . S U P P L Y S I D E C O N N E C T I O N W I T H L I S T E D I N S U L A T I O N P I E R C I N G C O N N E C T O R S I N A C C O R D A N C E W I T H 7 0 5 . 1 2 ( A ) A N D 2 3 0 . 8 2 2 8 . C O N N E C T I O N A T P A N E L S E C O N D A R Y S E R V I C E L O C A T I O N CONTRACTOR INFORMATIONDESIGNED BYSOLAR PHOTOVOLTAIC SYSTEMDATEISSUED FOR: PERMIT REQUIRED SIGNAGE www.bigdogenergy.com P V - 4 REQUIRED SIGNAGE1. PROVIDE A PLACARD WITH THE FOLLOWING WORKING IN 14"HIGH LETTERING PER NEC 690-17.2. LABEL FOR SOLAR AC DISCONNECT:FIRE DEPARTMENT REQUIRED SIGNAGE3. THE FOLLOWING SIGNAGE MUST HAVE A MINIMUM OF 38" HIGHLETTERING, IN ARIAL FONT (NON-BOLD), WITH CAPITAL LETTERS,WHITE ON RED BACKGROUND AND A REFLECTIVE, WEATHERRESISTANT MATERIAL.AT THE MAIN SERVICE DISCONNECT PROVIDE A SIGN WITH THEFOLLOWING WORDING:WARNING:ELECTRICAL SHOCK HAZARD.DO NOT TOUCH TERMINALS. TERMINALS ONBOTH THE LINE AND LOAD SIDES MAY BEENERGIZED IN THE OPEN POSITION."SOLAR AC DISCONNECT" 6/4/2021 DAVID NIBARGER 645 PARK ST REXBURG, ID 83440 509-218-3525 Big Dog Renewable Electric Energy Contractor Lic # 017916 620 Pheasant Ridge Dr Chubbuck, ID 83202 208-242-3352 T 208-232-5935 F X____________________ WARNINGDUAL POWER SUPPLYSOURCES: UTILITY GRIDAND PV SOLAR ELECTRIC SYSTEMTHE SIGN SHOULD BE PLACED ON THE OUTSIDE COVER IF THEMAIN SERVICE DISCONNECT IS OPERABLE WITH THE SERVICEPANEL CLOSED.4. LABELS TO BE INSTALLED ON FACE OF THE UTILITY ACDISCONNECT:CUSTOMER OWNEDONSITE POWER GENERATIONSYSTEM DISCONNECT5. LABEL INSTALLATION AT INTERCONNECT BREAKER:WARNING:INVERTER CONNECTION.DO NOT RELOCATE THISOVERCURRENT DEVICE. A L L S I G N A G E M U S T B E P E R M A N E N T L Y A T T A C H E D A N D B E W E A T H E R R E S I S T A N T / S U N L I G H T R E S I S T A N T A N D C A N N O T B E H A N D - W R I T T E N . N E C 1 1 0 . 2 1 ( B ) 6. REFLE C T I V E P L A C A R D A T S E R V I C E S T A T I N G : 7. AT PV D I S C O N N E C T S W I T C H A S R E Q U I R E D P E R N E C 6 9 0 . 5 6 ( C ) ( 3 ) : 8. THE F O L L O W I N G S I G N M U S T B E P R O V I D E D ON THE O U T S I D E ( O R W I T H I N 3 ' O F ) T H E S E R V I C E PANELB O A R D , A S R E Q U I R E D P E R N E C 6 9 0 . 5 6 ( C ) ( 1 ) : 9 SIGNA G E R E Q U I R E D A T S E R V I C E P A N E L B O A R D P E R N E C 6 9 0 . 5 4 : 10 SIGNA G E R E Q U I R E D A T S T R I N G I N V E R T E R P E R N E C 6 9 0 . 5 3 : P H O T O V O L T A I C S Y S T E M E Q U I P P E D W I T H R A P I D S H U T D O W N R A P I D S H U T D O W N S W I T C H F O R S O L A R P V S Y S T E M T O T A L R A T E D A C A M P S : 8 0 A S Y S T E M A C V O L T A G E : 2 4 0 V DIRE C T C U R R E N T P H O T O V O L T A I C S O U R C E S Y S T E M D C V O L T A G E : 2 4 0 V M A X D C C I R C U I T C U R R E N T : 3 2 A MA X D C C U R R E N T P E R O P T I M I Z E R : 1 5 A • NYSE-listed since 2010, Bloomberg Tier 1 manufacturer • Best-selling panel globally for last 4 years • Top performance in the strictest 3rd party labs • 99.9% on-time delivery to the installer • Premium solar panel factories in USA and Malaysia EAGLE 66TR G4 370-390 WATT TILING RIBBON MONO MODULE Positive power tolerance of 0~+3% KEY FEATURES BUILDING YOUR TRUST IN SOLAR. JINKOSOLAR.US SOLAR BRAND THE MOST DEPENDABLE TR Technology Tiling Ribbon eliminates cell gaps to increase module efficiency and power. 9BB Half Cell Technology Uniquely designed 9 busbar mono half cut solar cells deliver ultra-high power in a small footprint. Shade Tolerant Twin array design allows continued performance even with shading by trees or debris. Designed for Long Life Uses the same DuPont protective film as the Space Station, Mars Lander, and jetliners. Leading Warranty 12-year product and 25-year linear power warranty; 98% guaranteed first year, max 0.55% annual loss. 25 S T O R E D G E ® solaredge.com Optimized battery storage with HD-Wave technology Record-breaking 99% weighted efficiency with 200% DC oversizing Integrated arc fault protection and rapid shutdown for NEC 2014 and 2017, per article 690.11 and 690.12 Embedded revenue grade production data, ANSI C12.20 Class 0.5 Small, lightweight, and easy to install Modular design, future ready with optional upgrades to: DC-coupled storage for full or partial home backup Built-in consumption monitoring Direct connection to the SolarEdge smart EV charger Multi-inverter, scalable StorEdge® solution Single Phase Energy Hub Inverter with Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US 12-25 YEARWARRANTY SE3000H-US SE3800H-US SE6000H-US SE7600H-US UNITS OUTPUT - AC ON GRID Rated AC Power 3000 3800 6000 7600 W Maximum AC Power Output 3000 3800 6000 7600 W AC Output Voltage Range 211-264 Vac AC Frequency Range (min - nom - max)59.3 - 60 - 60.5(2)Hz Maximum Continuous Output Current 12.5 16 25 32 A GFDI Threshold 1 A Total Harmonic Distortion (THD)<3 % Power Factor 1, adjustable -0.85 to 0.85 Utility Monitoring, Islanding Protection, Country Configurable Thresholds Yes Charge Battery from AC (if Allowed)Yes Typical Nighttime Power Consumption <2.5 W OUTPUT - AC BACKUP(3) Rated AC Power in Backup Operation 2400 3050 4800 6100 W Peak AC Power (<10 sec) in Backup Operation 2700 3400 5400 6900 W AC L-L Output Voltage Range in Backup 211-264 Vac AC L-N Output Voltage Range in Backup 105-132 Vac AC Frequency Range in Backup (min - nom - max)55 - 60 - 65 Hz Maximum Continuous Output Current in Backup Operation 10 12.7 20 25.5 A Peak AC Current (<10sec) in Backup Operation 11.25 14.2 22.5 30 A GFDI 1 A THD <5 % OUTPUT - SMART EV CHARGER AC Rated AC Power 9,600 W AC Output Voltage Range 211-264 Vac AC Frequency Range (min - nom - max) 59.3-60-60.5 Hz Maximum Continuous Output Current @240V (grid, PV and battery)40 Aac INPUT - DC (PV AND BATTERY) Transformer-less, Ungrounded Yes Max Input Voltage 480 Vdc Nom DC Input Voltage 380 400 Vdc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600kΩ Sensitivity INPUT - DC (PV) Maximum DC Power 6000 7600 12000 15600 W Maximum Input Current(4)8.5 10.5 16.5 20 Adc Max. Input Short Circuit Current 45 Adc Maximum Inverter Efficiency 99.2 % CEC Weighted Efficiency 99 % 2-pole Disconnection Yes INPUT - DC (BATTERY) Supported Battery Types LG Chem RESU10H Number of Batteries per Inverter 1 or 2(5) Maximum Battery Capacity per Inverter 19.6 kWh Continuous Power Per Inverter 5000 W Peak Power 6900 W Max Input Current @240V 18 Adc 2-pole Disconnection Yes Single Phase Energy Hub Inverterwith Prism Technology for North America SE3000H-US / SE3800H-US / SE6000H-US / SE7600H-US(1) S T O R E D G E ® solaredge.com Backup Interface for Flexible Backup for North America BI-EUSGN-01 / BI-NUSGN-01 Seamless integration with the StorEdge inverter to manage and monitor both PV generation and energy storage Built-in Auto Transformer and Energy Meter for easier and faster installation Generator connection support Automatically provides backup power to home loads in the event of grid interruption Scalable solution to support higher power & higher capacity Full flexibility in which loads to backup - the entire home or selected loads Backup Interface YEARWARRANTY 12-25 Backup Interface for North America BI-EUSGN-01 / BI-NUSGN-01 BI-EUSGN-01 BI-NUSGN-01 INPUT FROM GRID AC Current Input 200 A AC Output Voltage (Nominal)240 Vac AC Output Voltage Range 211 - 264 Vac AC Frequency (Nominal)60 Hz AC Frequency Range 59.3 - 60.5 Hz Microgrid Interconnection Device Rated Current 200 A Service Side AC Main Circuit Breaker Rated Current 200 N/A A Service Side AC Main Circuit Breaker Interrupt Current 10k N/A A Grid Disconnection Switchover Time <100 ms OUTPUT TO MAIN DISTRIBUTION PANEL Maximum AC Current Output 200 A AC L-L Output Voltage (Nominal)240 Vac AC L-L Output Voltage Range 211 - 264 Vac AC Frequency (Nominal)60 Hz AC Frequency Range 59.3 - 60.5 Hz Maximum Inverters AC Current Output in Backup Operation 78 A Imbalance Compensation in Backup Operation 5000 W AC L-N Output Voltage in Backup (Nominal)120 V AC L-N Output Voltage Range in Backup 105 - 132 V AC Frequency Range in Backup 55 - 65 Hz INPUT FROM INVERTER Number of Inverter Inputs 3 # Rated AC Power 7,600 W Maximum Continuous Input Current @ 240V 32 A Rated AC Power in Continuous Backup Operation 6,100 W Maximum Continuous Input Current in Backup Operation 26 A Peak AC Power (<10 sec) in Backup Operation 7,000 W Peak AC Current (<10 sec) in Backup Operation 30 A Inverter Input AC Circuit Breaker 40 A Upgradability Up to 3 X 40A CB(1) GENERATOR(2) Maximum Rated AC Power 15,000 W Maximum Continuous Input Current 63 Adc Dry Contact Switch Voltage Rating 250/30 Vac/Vdc Dry Contact Switch Current Rating 5 A 2-wire Start Switch Yes ADDITIONAL FEATURES Installation Type Suitable for use as service equipment For main lug only Number of Communication Inputs 2 Communication RS485 Energy Meter (for Import/Export)1% accuracy Manual Control Over Microgrid Interconnection Device Yes (1) Each 40A CB supports an 7600W inverter; CB upgrade kit is available with the following part numbers: for 40A CB CB-UPG-40-01(2) Requires supporting inverter firmware P O W E R O P T I M I Z E R Power Optimizer P370 / P401 / P404 / P405 / P485 / P500 / P505 solaredge.com PV power optimization at the module level Specifically designed to work with SolarEdge inverters Next generation maintenance with module-level monitoring Module-level voltage shutdown for installer and firefighter safety Superior efficiency (99.5%) Up to 25% more energy Mitigates all types of modules mismatch-loss, from manufacturing tolerance to partial shading Fast installation with a single bolt Flexible system design for maximum space utilization 25 YEARWARRANTY Power Optimizer P370 / P401 / P404 / P405 / P485 / P500 / P505 © SolarEdge Technologies, Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 06/2020/V02/ENG ROW. Subject to change without notice. (1) Rated power of the module at STC will not exceed the optimizer “Rated Input DC Power”. Modules with up to +5% power tolerance are allowed.(2) For other connector types please contact SolarEdge.(3) For dual version for parallel connection of two modules use the P485. In the case of an odd number of PV modules in one string, installing one P485 dual version power optimizer connected to one PV module is supported. When connecting a single module, seal the unused input connectors using the supplied pair of seals. OPTIMIZER MODEL(typical module compatibilty) P370(60/72 Cell modules) P401(For high power 60/72-cell modules) P404(for 60/72-cell short strings) P405(for high-voltagemodules) P485 (for high-voltage modules) P500(for 96-cellmodules) P505(for highercurrentmodules)UNIT INPUT Rated Input DC Power(1)370 400 405 405 485 500 505 W Absolute Maximum Input Voltage(Voc at lowest temperature)60 80 125 80 83 Vdc MPPT Operating Range 8 - 60 12.5 - 80 12.5 - 105 8 - 80 12.5-83 Vdc Maximum Short Circuit Current (Isc)11 11.75 11 10.1 14 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.8 % Overvoltage Category II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 85 60 85 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power Optimizer 1 ± 0.1 Vdc STANDARD COMPLIANCE EMC FCC Part15 Class B, IEC61000-6-2, IEC61000-6-3 Safety IEC62109-1 (class II safety), UL1741 RoHS Yes Fire Safety VDE-AR-E 2100-712:2013-05 INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x H)129 x 153 x 27.5 / 5.1 x 6 x 1.1 129 x 153 x29.5 / 5.08 x6.02 x 1.16 129 x 89 x 42.5 / 5.1 x 3.5 x 1.7 129 x 90 x 49.5 / 5.1 x 3.5 x 1.9 129 x 153 x 33.5 / 5.1 x 6 x 1.3 129 x 162 x 59 / 5.1 x 6.4 x 2.3 mm / in Weight (including cables)655 / 1.5 775 / 1.7 845 / 1.9 750 / 1.7 1064 / 2.3 gr / lb Input Connector MC4(2)Single or Dual MC4(2)(3)MC4(2) Input Wire Length 0.16 / 0.52 m / ft Output Connector MC4 Output Wire Length 1.2 / 3.9 m / ft Operating Temperature Range -40 - +85 / -40 - +185 ˚C / ˚F Protection Rating IP68 Relative Humidity 0 - 100 % PV SYSTEM DESIGN USING ASOLAREDGE INVERTER(4)(5) SINGLE PHASEHD-WAVE SINGLE PHASE THREE PHASE THREE PHASE FOR 277/480V GRID Minimum String Length (Power Optimizers) P370, P401, P500(6)8 16 18 P404, P405, P485, P505 6 14 (13 with SE3K(7))14 Maximum String Length (Power Optimizers)25 50 50 Maximum Power per String 5700 5250 11250(8)12750(9)W Parallel Strings of Different Lengths or Orientations Yes (4) It is not allowed to mix P404/P405/P485/P505 with P370/P401/P500/P600/P650/P730/P801/P800p/P850/P950 in one string.(5) For SE15k and above, the minimum DC power should be 11KW. (6) The P370/P401/P500 cannot be used with the SE3K three phase inverter (available in some countries; refer to the three phase inverter SE3K-SE10K datasheet).(7) Exactly 10 when using SE3K-RW010BNN4 (8) For the 230/400V grid: it is allowed to install up to 13,500W per string when the maximum power diference between each string is 2,000W.(9)For the 277/480V grid: it is allowed to install up to 15,000W per string when the maximum power diference between each string is 2,000W MANUFACTURER SPEC SHEET - RAIL MANUFACTURER SPEC SHEET - RAIL MANUFACTURER SPEC SHEET - RAIL MANUFACTURER SPEC SHEET - RAIL