HomeMy WebLinkAboutINSPECTION TICKETS - 04-00199 - 107 Star View Dr - New SFRINSPECTION TICKET
0, Bldg.*��. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By EL Date 2 2
Req. By G(`cy.5-�� Phone No. —4-75 -7-4 ZOe
Project Permit No. _� q - Co j�n
Address W ,�N c..o
Inspection Type — ` Y
Day /Time Req. Z40
Inspector's Report Res. (a comm.
Fa
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECT R'S ACTION
APPROVED [j DISAPPROVED
061"'0. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Signed
Rec't Acknowledged
White - Office Copy
F•FIR-CO03
[] Y ❑ N ❑ NIA
0 FINAL
❑ DID NOT INSPECT
*Row • Job Copy Puck - frup om-s Copy
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By QJUG Date
Req. By Phone No. 76''1 0.20 g
Project Permit No. 04—bOIQ7
Address
Inspection Type
Day /Time Req.
Inspector's Report XJ Res. ❑ Comm.
Gri (JP(vs�- �tL�
0- "Uw olo Lit)?A6tv-'5(J;5r dryo
INSPECTED ITEMS CONFORM TO APPROVED DW S ❑ Y ❑ N ❑ N/A
INSPECTOR'S ACTION
❑APPROVED DISAPPROVED 0FINAL
❑ C.O. (FINAL) ❑ NOT APPLICABLE ❑ DID NOT INSPECT
Reel Acknowledged
While - Office Copy Ye"" - Job Copy Pom-Ids Copy
F-FIR-0003
INSPECTION TICKET
W Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By RC, Dale �\ O
Req. By &*• ` Ze-e- Phone No. 15T-0269
Project Permit No. 04 0011111
Address 164- 530nntw
Inspection Type 5V u-�Yocx— jc9*
Day /rime Req. 1 z-1 l (—& t-00vm
Inspector's Report Z� Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
.j� APPROVED
❑ C.00NAL)
Cl DISAPPROVED
❑ NOT APPLICABLE
❑Y ❑N []NIA
❑ FINAL
DID NOT INSPECT
ReCt Acknowledged
White - Office Copy VeRm - Job Copy F4,* - Inspector's Copy
F FIR-0003
INSPECTION TICKET
0, Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By zo Date
Req. By _ems .G Phone No. Z -fsZb S
ProjectA�t-r'ze-e� Permit No. 22`1` 60127
T
Address 167,r-sc tc1
OF
Inspection Type merit`
Day /Time Req."�P
Inspector's Report Res. ❑ Comm.
o� max, �rrr 5vr� &4alls 3 �f
Ga vies � ,�aryr J�Gr'� in .441Walle)
ove' :fern IV
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
le'A"*PPROVED El DISAPPROVED
0 C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Signed �5
Rec't Acknowledged
White - Office Copy
F-FIR-CO03
DY ❑N ❑N/A
(J FINAL
❑ DID NOT INSPECT
Yellow - Job Copy Ph* - Inspector's Copy
INSPECTION TICKET
❑ Bldg. Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By 780 Date /� v
Req. By Phone No.
Project/ Permit No. d &rl vD/
Address ,�� 7'/�-/� l/�! �✓
Inspection Type
Day Time Req.
Inspector's Report G' Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECT ACTION
PPROVED [j DISAPPROVED
i] C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
❑Y El ❑NIA
tj FINAL
❑ DID NOT INSPECT
Rec'r Acknowledged
White . Office Copy Yell - Job Copy Pink - Inspector's Copp
F-FIR-CO03
INSPECTION TICKET
Aee"Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd B Date ot.3
Req. By L Phone No. -7 l
Project_ Permit No. — d�
Address 0
�_ .. i
Inspection Type
Day /Time Req. a A4-Z
Inspector's Report Res. ❑ Comm.
F) v-- -P0-!:LC
c Qxz
A I -PP I e-I! S,
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
PROVED [J DISAPPROVED
0 C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQ�:
/A0m.o0« fAd "I-n
Signed /
Rec't Acknowledged
White - Office Copy
F•FIR•COo3
❑ Y ❑ N El N/A
[j FINAL
❑ DID NOT INSPECT
Yellow - Job Copy Pink - Inspector's Copy
INSPECTION TICKET
A Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection R Rec'd B QA) Date ri 4 ( 6�
� Request: y
Req. By Phone No.
Project 11�Permit No.
Address
Inspection Type
Day frime Req. o� .
Inspector's Report ;d Res. ❑ Comm.
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPEC OR'S ACTION
- APPROVED [j DISAPPROVED
[] C.O. (FINAL) ❑ NOT APPLICABLE
ACTION REQUIRED:
Rec't Acknowledged
White - Office Copy
F-FIR-COW
DY El El N/A
[_] FINAL
❑ DID NOT INSPECT
Yellow - .fob Copy Pink - Inspector's Copy
INSPECTION TICKET
❑- Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By KV Date 10-- 1-7 _4"
Req. By 1 C, Phone No. 15-7 __DD4)'8
Project SGIr?f7 C, Permit No. C 4 O b j q 1
Address
Inspectic
Day /Tin
Inspector's Report d"Res. ❑ Comm.
ffk&r ke,r 5 are— ZO ' Pc- Pao p�iy rt�
T�F k6.e.se-war IL ti. Isa 1.1
Aez,d 4-D to e waeve-d baL(L 4--ke-
dapW of +-ke_ eaves.
INSPECTED ITEMS CONFORM TO APPROVED DWGS ❑Y ❑ N ❑ N/A
INSPECTOR'S ACTION
APPROVED EJ DISAPPROVED ❑ FINAL
❑ C.O. (FINAL) ❑ NOT APPLICABLE ❑ DID NOT INSPECT
ACTION REQUIRED:
20' 5e+'69,t,1L is fo +4. e. ecayes
Signed U y:4m awees Inspector
ReCt Acknowledged
Nine - Office Copy Yellow Job Copy Pnk - InSPatlmft Copy
F FIR COOO
INSPECTION TICKET
Bldg. ❑ Plumb. ❑ Elect. ❑ Mech. ❑ Fire
Inspection Request: Rec'd By �'1 >� Date d
Req. By �� Phone No. 7 Il CQQ
Project Permit No. D'Lf Cc 1 R g
Address
Inspection Type.a��,.�yQ
Day /Time Req. • ?3TJ �/'� 3
Inspector's Report 0 Res. ❑ Comm.
r� LJv_ /�crrC /%L S�9rvh.q_ u
/j OZl 5 G '5 V t o v Fr-crm S&-en-c G—
INSPECTED ITEMS CONFORM TO APPROVED DWGS
INSPECTOR'S ACTION
[]APPROVED ODISAPPROVED
❑C.O.(FINAL) ONOTAPPLICABLE
ACTION REQUIRED:
Rec't Acknowledged
While - Office Copy
F-FIR-0000
O Y ON O N/A
L I FINAL
❑ DID NOT INSPECT
Veeow - Job Copy Pik - h4pedo, i Copy
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on -site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are _excavated. `Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post the inspection record on the job site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 356-4830 Building: 359-3020 ex 341 or 313
Plumbing: 359-3020 ex 341 or 313 or 359-3034
r
Signature:Date: